SHERIDAN GAS UNIT

Operated by REMORA MANAGEMENT, LLC (P-5 701560) in the SHERIDAN (WILCOX CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210169District 03Field 83107375CondensateGasSaveExport
Value, all time
$5.0 M
May 2005 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
253
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 84 leases and 86 wells, and the rule below applies to all of them.

Discovered
2008-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2008-09-09.

The Commission's schedule remark for this field reads: SHALL REMAIN SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition33,657 bbl$2,465,316
GasProduction348,970 Mcf$2,564,148
Total$5,029,465

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.4584, -96.6305. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.45844, -96.63052 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,050 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,050 ft.

Completions filed
May 2005
1 of 1 wells

1 well

42-0893240610811,050 ftMay 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (253)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

253 months

May 2026140106.413.05$228
Apr 202612198.932.87$159
Mar 2026514189.753.15$893
Feb 202638363.503.75$502
Jan 202637559.138.00$777
Dec 202525056.664.41$334
Nov 202526958.593.93$388
Oct 202526759.383.30$340
Sep 202526862.743.08$335
Aug 202538363.933.01$442
Jul 202525466.743.32$313
Jun 202525966.483.13$318
May 202526160.553.23$318
Apr 202539162.363.54$510
Mar 202512967.704.27$191
Feb 202524470.884.34$333
Jan 202526574.324.28$427
Dec 202425268.993.12$300
Nov 202449969.052.20$494
Oct 2024410671.372.28$527
Sep 2024310669.612.36$459
Aug 2024310975.632.06$452
Jul 2024310379.932.15$461
Jun 2024310678.082.63$513
May 2024310578.812.20$467
Apr 202439284.451.66$406
Mar 2024410180.301.55$477
Feb 202439276.091.78$392
Jan 2024410473.023.30$635
Dec 2023310271.262.61$480
Nov 202339477.892.81$498
Oct 202326785.443.09$378
Sep 2023312489.042.74$606
Aug 2023311880.522.67$557
Jul 2023312274.852.64$547
Jun 2023311668.962.26$469
May 2023411970.622.23$548
Apr 2023311578.122.24$492
Mar 2023412072.852.39$579
Feb 2023310375.112.47$479
Jan 2023412376.533.39$723
Dec 2022311076.415.73$859
Nov 202247985.005.65$786
Oct 2022415187.185.86$1,234
Sep 2022329784.888.16$2,679
Aug 2022333194.529.13$3,305
Jul 20224331101.587.54$2,903
Jun 20223321115.097.98$2,906
May 20223331109.378.43$3,119
Apr 20224315104.226.84$2,571
Mar 20224305108.885.08$1,984
Feb 2022322691.054.86$1,371
Jan 2022413981.844.54$958
Dec 2021325471.323.90$1,204
Nov 2021431977.435.24$1,980
Oct 2021332779.795.71$2,108
Sep 2021332169.865.35$1,927
Aug 2021434266.024.22$1,708
Jul 2021436270.783.98$1,725
Jun 2021334069.493.38$1,358
May 2021435963.483.02$1,337
Apr 2021537760.362.76$1,342
Mar 2021535561.302.72$1,271
Feb 2021325657.805.55$1,594
Jan 2021428950.412.81$1,014
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200138.371.83$2
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200714.751.80$13
Mar 2020515630.341.86$441
Feb 2020414349.881.98$483
Jan 2020515757.252.09$615
Dec 2019416259.012.30$609
Nov 2019415555.302.75$648
Oct 2019517153.472.42$681
Sep 2019417555.052.66$685
Aug 2019518353.112.30$687
Jul 2019417956.272.46$665
Jun 2019217452.782.49$539
May 2019219958.482.74$662
Apr 2019320962.632.75$763
Mar 2019422256.803.06$907
Feb 2019322150.852.79$770
Jan 2019425746.033.23$1,014
Dec 2018428646.594.19$1,383
Nov 2018433652.934.24$1,635
Oct 2018440161.443.40$1,608
Sep 2018440959.543.11$1,509
Aug 2018540759.403.07$1,545
Jul 2018538965.142.93$1,466
Jun 2018512160.183.08$673
May 2018513765.382.90$724
Apr 2018520463.842.90$911
Mar 2018522061.222.79$919
Feb 2018623261.782.77$1,012
Jan 2018630862.874.01$1,612
Dec 2017731557.272.92$1,321
Nov 2017634855.423.12$1,418
Oct 2017548349.292.98$1,688
Sep 2017339147.523.09$1,350
Aug 2017239545.373.00$1,277
Jul 2017650943.873.09$1,835
Jun 20171028042.493.09$1,289
May 20171230645.373.26$1,543
Apr 20171124547.933.21$1,314
Mar 20171328346.772.98$1,452
Feb 20171127750.452.95$1,373
Jan 20171436449.413.42$1,936
Dec 20161442848.763.72$2,276
Nov 20161353242.492.64$1,959
Oct 2016845046.193.09$1,760
Sep 2016744641.553.10$1,674
Aug 2016833641.442.92$1,314
Jul 2016731541.622.92$1,213
Jun 2016829745.352.69$1,160
May 2016730842.521.99$911
Apr 2016728036.561.99$813
Mar 2016730933.011.79$785
Feb 2016728126.472.06$765
Jan 2016827227.352.36$862
Dec 2015721332.362.00$653
Nov 2015820238.792.17$748
Oct 2015818443.552.43$795
Sep 2015514242.992.76$607
Aug 2015825240.162.87$1,045
Jul 2015825748.152.95$1,142
Jun 2015724656.152.88$1,102
May 2015625955.212.96$1,097
Apr 2015625349.822.71$984
Mar 2015725342.892.93$1,043
Feb 2015622744.662.98$944
Jan 2015825443.433.10$1,135
Dec 2014725354.693.59$1,291
Nov 2014525270.464.25$1,424
Oct 2014627178.303.90$1,527
Sep 2014527186.164.05$1,527
Aug 2014528389.394.04$1,589
Jul 2014528996.564.18$1,691
Jun 20145528798.164.74$6,758
May 201431329494.734.73$31,040
Apr 201427129695.944.81$27,423
Mar 201432930295.895.06$33,075
Feb 201429827597.406.19$30,728
Jan 201435629290.404.86$33,602
Dec 201330226491.824.35$28,879
Nov 201326631488.853.74$24,808
Oct 201324933597.423.78$25,524
Sep 2013226326104.113.72$24,741
Aug 2013210330104.253.52$23,055
Jul 2013246313102.523.72$26,384
Jun 201320629994.403.93$20,622
May 201319927894.834.15$20,025
Apr 201322225893.964.28$21,964
Mar 201318931793.623.91$18,935
Feb 201312930891.233.42$12,822
Jan 201316035891.603.42$15,880
Dec 201215834586.773.42$14,890
Nov 201214135686.953.62$13,550
Oct 201216736989.383.40$16,181
Sep 201215032794.672.92$15,155
Aug 201213632692.662.91$13,550
Jul 201215636785.133.02$14,389
Jun 201213136379.822.52$11,371
May 201216439191.612.49$15,997
Apr 2012189388101.652.00$19,987
Mar 2012151379105.052.22$16,705
Feb 201217215101.102.57$17,428
Jan 201215817798.092.73$15,982
Dec 201113817996.873.24$13,948
Nov 201114428895.723.31$14,737
Oct 201116430584.983.65$15,050
Sep 201113528783.623.99$12,433
Aug 201114033983.404.15$13,083
Jul 201113534694.144.52$14,272
Jun 201114128792.904.64$14,431
May 201115420598.134.40$16,015
Apr 201114819105.964.33$15,764
Mar 201117218996.364.06$17,341
Feb 201125127085.644.18$22,624
Jan 20112195886.504.59$19,210
Dec 201023124885.734.35$20,882
Nov 201019416980.843.80$16,324
Oct 201023725678.103.51$19,408
Sep 201022218472.633.98$16,856
Aug 201014331673.684.42$11,933
Jul 201020230472.554.74$16,095
Jun 201021426670.364.91$16,363
May 201025635571.124.24$19,710
Apr 201025734881.694.12$22,429
Mar 201031936478.394.39$26,604
Feb 20102134473.585.44$3,417
Jan 2010088974.365.96$5,302
Dec 2009097771.445.48$5,358
Nov 200901,07174.593.75$4,018
Oct 200901,17672.544.11$4,834
Sep 200901,22465.543.06$3,751
Aug 200901,35667.423.22$4,364
Jul 200901,40661.133.46$4,871
Jun 200901,43966.163.90$5,605
May 200901,56354.743.93$6,136
Apr 200901,65446.773.59$5,934
Mar 200901,84642.144.06$7,493
Feb 200902,23932.814.63$10,373
Jan 200903,35635.865.37$18,025
Dec 200804,19637.105.98$25,080
Nov 200804,20655.496.86$28,855
Oct 200802,85275.246.92$19,741
Sep 200802,019101.767.88$15,904
Aug 200802,453114.228.48$20,809
Jul 200802,790131.0811.39$31,777
Jun 200802,564131.3313.03$33,416
May 200802,977123.1711.57$34,457
Apr 200803,150110.3110.45$32,933
Mar 200803,433101.909.66$33,177
Feb 200804,35492.538.77$38,187
Jan 2008184,19390.388.21$36,033
Dec 20071994,18188.337.30$48,107
Nov 20071,7284,43191.677.29$190,715
Oct 20071,4735,06882.856.92$157,119
Sep 20071,3665,22675.846.24$136,229
Aug 20071,3155,45969.066.39$125,686
Jul 20071,5305,95470.906.39$146,511
Jun 20071,4816,00262.007.55$137,128
May 20071,8496,52158.747.85$159,776
Apr 20071,5516,60759.617.81$144,024
Mar 20071,6067,10956.927.30$143,323
Feb 20074116,54455.108.22$76,412
Jan 20073938,07750.306.73$74,101
Dec 20064388,95056.656.92$86,733
Nov 20064948,28754.207.62$89,901
Oct 20066488,49154.906.01$86,638
Sep 20065999,00360.085.04$81,338
Aug 20064717,04268.717.34$84,050
Jul 20064928,16969.376.34$85,944
Jun 20065268,78766.286.38$90,958
May 20066029,89366.016.42$103,301
Apr 200649610,59664.397.36$109,929
Mar 200660611,36056.707.08$114,822
Feb 200656611,21657.597.75$119,533
Jan 200666312,72060.598.93$153,803
Dec 200573713,00954.9413.42$215,012
Nov 200539610,12054.6910.59$128,812
Oct 20051510,57458.3413.80$146,751
Sep 200504,06461.4512.08$49,089
Aug 2005165,33761.519.80$53,270
Jul 200507,88955.697.84$61,878
Jun 200508,25952.337.38$60,960
May 20050045.226.65$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $106.41 =       $106
Gas                   40 Mcf  × $  3.05 =       $122

────────────────────────────────────────────────────
Month total                                     $228

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/210169 is the state's own key, not one this site invented.