SHERIDAN GAS UNIT

Operated by REMORA MANAGEMENT, LLC (P-5 701560) in the SHERIDAN (WILCOX CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 211425District 03Field 83107375CondensateGasSaveExport
Value, all time
$6.5 M
Jun 2005 – May 2026
Value, last 12 filed months
$96 k
at the published price for each month
Months reported
252
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 84 leases and 86 wells, and the rule below applies to all of them.

Discovered
2008-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2008-09-09.

The Commission's schedule remark for this field reads: SHALL REMAIN SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition11,853 bbl$823,541
GasProduction949,415 Mcf$5,648,457
Total$6,471,997

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 29.4585, -96.6305. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

29.45848, -96.63053 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,549 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,549 ft.

Completions filed
Apr 2008
1 of 1 wells

1 well

42-0893241611910,549 ftApr 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (252)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

252 months

May 2026412,325106.413.05$11,444
Apr 2026221,20798.932.87$5,640
Mar 2026271,45389.753.15$6,999
Feb 2026291,59863.503.75$7,835
Jan 2026241,45859.138.00$13,080
Dec 2025271,50256.664.41$8,159
Nov 2025231,34358.593.93$6,621
Oct 2025341,79959.383.30$7,964
Sep 2025331,79862.743.08$7,603
Aug 2025251,92763.933.01$7,408
Jul 2025191,39966.743.32$5,906
Jun 2025241,73566.483.13$7,024
May 2025241,84860.553.23$7,427
Apr 2025241,71762.363.54$7,580
Mar 2025221,43867.704.27$7,627
Feb 2025151,01970.884.34$5,487
Jan 20251176074.324.28$4,069
Dec 2024251,82868.993.12$7,431
Nov 2024221,62369.052.20$5,087
Oct 2024211,65271.372.28$5,268
Sep 2024131,43169.612.36$4,288
Aug 20241258275.632.06$2,109
Jul 20241474679.932.15$2,720
Jun 20241547078.082.63$2,409
May 2024161,93878.812.20$5,522
Apr 20241788084.451.66$2,896
Mar 20241892080.301.55$2,867
Feb 20241572976.091.78$2,442
Jan 2024191,11573.023.30$5,064
Dec 2023171,75671.262.61$5,796
Nov 20231797877.892.81$4,070
Oct 2023850385.443.09$2,236
Sep 2023151,85489.042.74$6,406
Aug 2023151,79980.522.67$6,016
Jul 2023151,90074.852.64$6,142
Jun 2023111,22768.962.26$3,530
May 20231952170.622.23$2,502
Apr 20231773278.122.24$2,966
Mar 2023181,04172.852.39$3,803
Feb 2023171,19375.112.47$4,218
Jan 2023191,44976.533.39$6,363
Dec 20221555476.415.73$4,320
Nov 2022191,11985.005.65$7,933
Oct 2022191,19387.185.86$8,652
Sep 2022161,25684.888.16$11,612
Aug 2022171,06794.529.13$11,346
Jul 2022182,394101.587.54$19,884
Jun 2022152,124115.097.98$18,670
May 2022162,268109.378.43$20,876
Apr 2022172,587104.226.84$19,461
Mar 2022152,263108.885.08$13,121
Feb 20221060391.054.86$3,840
Jan 2022201,38581.844.54$7,921
Dec 2021161,01571.323.90$5,099
Nov 20211865377.435.24$4,813
Oct 20211680779.795.71$5,888
Sep 20211587569.865.35$5,730
Aug 20211874466.024.22$4,328
Jul 20211754370.783.98$3,366
Jun 20211670969.493.38$3,509
May 20212173463.483.02$3,548
Apr 2021231,31860.362.76$5,024
Mar 2021231,50761.302.72$5,504
Feb 2021181,02957.805.55$6,749
Jan 2021271,73350.412.81$6,231
Dec 2020261,24944.642.68$4,502
Nov 2020241,03838.772.71$3,740
Oct 20202398336.972.48$3,287
Sep 2020181,24037.091.99$3,137
Aug 20201695739.982.39$2,922
Jul 20201489238.371.83$2,165
Jun 20201798934.901.69$2,265
May 2020191,15816.921.81$2,423
Apr 2020211,07014.751.80$2,240
Mar 2020231,33630.341.86$3,178
Feb 2020221,15249.881.98$3,379
Jan 2020231,24457.252.09$3,923
Dec 2019221,08159.012.30$3,789
Nov 20192198555.302.75$3,871
Oct 20192392153.472.42$3,457
Sep 2019211,11855.052.66$4,127
Aug 2019251,51853.112.30$4,826
Jul 2019141,70556.272.46$4,982
Jun 2019101,53352.782.49$4,347
May 2019121,16158.482.74$3,883
Apr 2019141,32362.632.75$4,516
Mar 2019211,39256.803.06$5,455
Feb 2019171,25950.852.79$4,380
Jan 2019181,10646.033.23$4,399
Dec 2018181,30746.594.19$6,309
Nov 2018171,35252.934.24$6,629
Oct 2018181,47761.443.40$6,125
Sep 2018191,91059.543.11$7,068
Aug 2018201,68259.403.07$6,346
Jul 2018251,33265.142.93$5,534
Jun 2018231,61160.183.08$6,341
May 2018191,61165.382.90$5,915
Apr 2018221,51463.842.90$5,796
Mar 2018231,72261.222.79$6,207
Feb 2018251,46361.782.77$5,591
Jan 2018261,74162.874.01$8,615
Dec 2017291,76157.272.92$6,806
Nov 2017201,62255.423.12$6,166
Oct 2017322,08149.292.98$7,786
Sep 2017241,30947.523.09$5,182
Aug 2017241,14945.373.00$4,541
Jul 2017391,88543.873.09$7,530
Jun 2017661,72842.493.09$8,139
May 2017731,96045.373.26$9,708
Apr 2017712,19447.933.21$10,449
Mar 2017761,81546.772.98$8,970
Feb 2017661,69250.452.95$8,326
Jan 2017861,79949.413.42$10,400
Dec 2016841,79548.763.72$10,778
Nov 2016642,00842.492.64$8,029
Oct 2016292,46546.193.09$8,957
Sep 2016271,61741.553.10$6,136
Aug 2016311,10441.442.92$4,513
Jul 20162676841.622.92$3,328
Jun 20163763045.352.69$3,370
May 20164692942.521.99$3,806
Apr 20164196036.561.99$3,410
Mar 2016531,37633.011.79$4,218
Feb 2016571,43126.472.06$4,462
Jan 2016671,55927.352.36$5,518
Dec 2015591,63932.362.00$5,190
Nov 2015662,08138.792.17$7,070
Oct 2015682,65743.552.43$9,409
Sep 2015381,05642.992.76$4,547
Aug 2015641,27840.162.87$6,241
Jul 2015701,44548.152.95$7,626
Jun 2015642,04756.152.88$9,495
May 2015761,68955.212.96$9,188
Apr 2015711,45849.822.71$7,483
Mar 2015871,82742.892.93$9,093
Feb 2015671,82144.662.98$8,412
Jan 2015931,88343.433.10$9,877
Dec 2014832,11754.693.59$12,142
Nov 2014682,22770.464.25$14,260
Oct 2014822,99378.303.90$18,096
Sep 2014693,68286.164.05$20,840
Aug 2014773,98389.394.04$22,955
Jul 2014753,11396.564.18$20,253
Jun 20141133,79298.164.74$29,054
May 2014184,27694.734.73$21,916
Apr 2014152,79195.944.81$14,861
Mar 2014192,42195.895.06$14,064
Feb 2014171,86897.406.19$13,222
Jan 2014203,27590.404.86$17,727
Dec 2013223,12291.824.35$15,615
Nov 2013193,53488.853.74$14,899
Oct 2013214,11397.423.78$17,590
Sep 2013253,169104.113.72$14,384
Aug 2013174,014104.253.52$15,912
Jul 2013233,856102.523.72$16,694
Jun 2013253,84894.403.93$17,496
May 2013264,04894.834.15$19,261
Apr 2013304,07993.964.28$20,287
Mar 2013394,42193.623.91$20,950
Feb 2013364,12191.233.42$17,378
Jan 2013414,76891.603.42$20,062
Dec 2012253,39886.773.42$13,791
Nov 2012183,75586.953.62$15,177
Oct 2012254,03789.383.40$15,959
Sep 2012284,32394.672.92$15,267
Aug 2012264,61892.662.91$15,839
Jul 2012284,22085.133.02$15,131
Jun 2012253,90879.822.52$11,840
May 2012253,60091.612.49$11,248
Apr 2012314,274101.652.00$11,685
Mar 2012404,364105.052.22$13,899
Feb 2012364,036101.102.57$14,013
Jan 2012354,19198.092.73$14,892
Dec 2011354,10096.873.24$16,673
Nov 2011774,00895.723.31$20,642
Oct 20111144,80984.983.65$27,234
Sep 2011984,48383.623.99$26,063
Aug 2011974,75683.404.15$27,824
Jul 2011944,67494.144.52$29,963
Jun 2011983,80392.904.64$26,750
May 2011714,18898.134.40$25,415
Apr 2011404,116105.964.33$22,074
Mar 2011434,64496.364.06$22,986
Feb 2011703,32385.644.18$19,885
Jan 20111074,16886.504.59$28,382
Dec 20101164,82885.734.35$30,936
Nov 2010994,13680.843.80$23,701
Oct 20101175,12478.103.51$27,117
Sep 20101134,63372.633.98$26,644
Aug 20101025,04773.684.42$29,820
Jul 2010965,10272.554.74$31,130
Jun 20101032,62470.364.91$20,132
May 20101253,77971.124.24$24,895
Apr 20101104,46781.694.12$27,402
Mar 2010824,84778.394.39$27,700
Feb 2010643,87273.585.44$25,782
Jan 2010764,67674.365.96$33,539
Dec 2009893,90671.445.48$27,778
Nov 2009704,06474.593.75$20,467
Oct 2009735,55872.544.11$28,140
Sep 2009404,90765.543.06$17,660
Aug 200905,48267.423.22$17,644
Jul 200905,20461.133.46$18,029
Jun 200905,28366.163.90$20,577
May 200905,05654.743.93$19,849
Apr 200904,70246.773.59$16,868
Mar 200904,83942.144.06$19,642
Feb 200904,72632.814.63$21,896
Jan 200904,88835.865.37$26,253
Dec 200805,15937.105.98$30,836
Nov 200804,25855.496.86$29,211
Oct 200805,00975.246.92$34,672
Sep 200804,382101.767.88$34,517
Aug 200804,980114.228.48$42,245
Jul 200805,399131.0811.39$61,492
Jun 200805,369131.3313.03$69,972
May 200804,459123.1711.57$51,610
Apr 200804,510110.3110.45$47,151
Mar 200809,525101.909.66$92,050
Feb 2008010,80492.538.77$94,757
Jan 20083610,67490.388.21$90,842
Dec 20073089,85588.337.30$99,167
Nov 20074379,68591.677.29$110,680
Oct 20073499,41782.856.92$94,099
Sep 20073208,93575.846.24$80,060
Aug 200736310,35469.066.39$91,210
Jul 200740311,09870.906.39$99,466
Jun 20073549,88362.007.55$96,549
May 200746811,68758.747.85$119,190
Apr 200739510,95759.617.81$109,068
Mar 200740911,29056.927.30$105,720
Feb 20075011,73555.108.22$99,170
Jan 20075613,18750.306.73$91,524
Dec 20065312,91756.656.92$92,368
Nov 20065313,19154.207.62$103,355
Oct 20065513,09654.906.01$81,776
Sep 20064913,95260.085.04$73,223
Aug 2006012,51268.717.34$91,837
Jul 2006014,07269.376.34$89,255
Jun 2006013,07866.286.38$83,488
May 2006015,24066.016.42$97,917
Apr 2006015,01964.397.36$110,547
Mar 2006016,40756.707.08$116,209
Feb 2006015,41857.597.75$119,507
Jan 2006017,72760.598.93$158,361
Dec 2005018,08254.9413.42$242,577
Nov 2005019,76854.6910.59$209,311
Oct 2005021,77158.3413.80$300,347
Sep 2005013,07861.4512.08$157,969
Aug 200509,89561.519.80$96,940
Jul 200501,76855.697.84$13,868
Jun 200503,31352.337.38$24,453

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate            41 bbl  × $106.41 =     $4,363
Gas                2,325 Mcf  × $  3.05 =     $7,082

────────────────────────────────────────────────────
Month total                                  $11,444

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 03/G/211425 is the state's own key, not one this site invented.