KOHLER, V. -A-

Operated by KD ENERGY, LLC (P-5 452996) in the KOHLER (COLE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 164073District 04Field 50084166CondensateGasSaveExport
Value, all time
$146 k
Jun 1997 – Dec 2018
Value, last 12 filed months
$0
at the published price for each month
Months reported
259
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7 leases and 7 wells, and the rule below applies to all of them.

Discovered
1929-05-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,142 bbl$26,426
GasProduction36,533 Mcf$119,668
Total$146,094

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.6533, -98.7763. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.65328, -98.77634 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,550 ft
1 wells filed one
Completion to plug
21.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,550 ft.

Completions filed
Jun 1997
1 of 1 wells
Plug dates filed
Dec 2018
1 of 1 wells

Last completion to plug: a median of 21.5 years across the 1 well that filed both dates, with the middle half between 21.5 years and 21.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-131381181923,550 ftJun 1997Dec 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (259)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

259 months

Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 2003018326.675.41$990
Mar 2003059931.146.10$3,652
Feb 2003066433.487.93$5,263
Jan 2003074530.315.58$4,159
Dec 2002090926.914.85$4,412
Nov 2002087824.664.14$3,632
Oct 2002068926.464.23$2,914
Sep 20022070627.443.64$3,115
Aug 2002079925.963.16$2,528
Jul 2002221,07824.583.06$3,841
Jun 2002098223.733.34$3,278
May 2002061124.663.58$2,190
Apr 2002012523.653.51$439
Mar 2002034022.003.10$1,055
Feb 20020518.222.38$12
Jan 20020817.172.38$19
Dec 20010116.932.36$2
Nov 20010618.072.41$14
Oct 20010419.782.53$10
Sep 20010024.262.25$0
Aug 20011524.873.05$40
Jul 20013323.933.20$81
Jun 2001318724.563.82$1,094
May 2001365225.524.31$1,143
Apr 2001301924.685.34$842
Mar 2001261224.545.38$703
Feb 200135727.755.77$1,012
Jan 20012321027.478.40$2,396
Dec 20002166526.889.12$6,631
Nov 20003695832.215.66$6,580
Oct 20004261331.235.15$4,466
Sep 20003827431.875.19$2,632
Aug 20004139229.644.54$2,995
Jul 20003557928.534.09$3,367
Jun 20004138229.304.40$2,881
May 20004030927.263.68$2,227
Apr 20003330624.513.12$1,762
Mar 20003630028.422.86$1,881
Feb 20003232527.622.73$1,770
Jan 20003539725.272.48$1,869
Dec 19992737724.282.42$1,569
Nov 19992649123.192.43$1,798
Oct 19993179320.982.80$2,874
Sep 19993690821.752.62$3,161
Aug 19995698819.262.88$3,920
Jul 19996659517.892.37$2,592
Jun 19997456715.942.36$2,519
May 19994062015.792.32$2,071
Apr 19992461815.102.21$1,727
Mar 19992493012.471.84$2,009
Feb 1999224879.981.82$1,105
Jan 19993396210.381.90$2,170
Dec 1998264279.201.77$996
Nov 1998063110.892.19$1,379
Oct 1998043712.421.97$861
Sep 1998086912.592.08$1,810
Aug 1998073711.301.91$1,406
Jul 1998067611.742.24$1,512
Jun 1998084911.242.24$1,899
May 1998079912.622.21$1,763
Apr 1998057013.042.51$1,428
Mar 1998048012.802.31$1,109
Feb 1998022513.952.30$517
Jan 1998050914.702.15$1,097
Dec 1997055016.322.41$1,326
Nov 1997071018.193.09$2,193
Oct 1997061519.253.15$1,937
Sep 1997070817.742.95$2,092
Aug 1997065917.862.55$1,684
Jul 199701,12217.582.25$2,521
Jun 199701,39717.242.26$3,153

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2003 — as filed, then multipliedworked
Condensate             0 bbl  × $ 26.67 =         $0
Gas                  183 Mcf  × $  5.41 =       $990

────────────────────────────────────────────────────
Month total                                     $990

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/164073 is the state's own key, not one this site invented.