GRUY, DAGMAR

Operated by VARAS ENERGY OPERATING COMPANY, (P-5 102824) in the LOPEZ, SE. (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 229698District 04Field 548892002 tax incentive programmesCondensateGasSaveExport
Value, all time
$5.0 M
Aug 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 61 leases and 61 wells, and the rule below applies to all of them.

Discovered
2006-12-19
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2009-02-10.

The Commission's schedule remark for this field reads: NO BETWEEN WELL SPACING. ALLOCATION FORMULA SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-10-21185917
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7,416 bbl$604,020
GasProduction629,278 Mcf$4,426,523
Total$5,030,543

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.6526, -98.7796. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.65264, -98.77963 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,750 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,750 ft.

Completions filed
Aug 2007
1 of 1 wells

1 well

42-13138968158,750 ftAug 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 202302472.852.39$57
Feb 202302375.112.47$57
Jan 20230076.533.39$0
Dec 202213476.415.73$271
Nov 202202285.005.65$124
Oct 202203487.185.86$199
Sep 202214984.888.16$485
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 2022191115.097.98$841
May 2022152109.378.43$548
Apr 2022162104.226.84$528
Mar 2022169108.885.08$459
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 202118071.323.90$383
Nov 202101177.435.24$58
Oct 202102079.795.71$114
Sep 202114669.865.35$316
Aug 202117566.024.22$383
Jul 20210070.783.98$0
Jun 20211069.493.38$69
May 202103163.483.02$94
Apr 202102960.362.76$80
Mar 202117661.302.72$268
Feb 202113457.805.55$246
Jan 202114350.412.81$171
Dec 202003344.642.68$88
Nov 202014038.772.71$147
Oct 202015536.972.48$173
Sep 202015037.091.99$137
Aug 202015639.982.39$174
Jul 202003738.371.83$68
Jun 202014034.901.69$103
May 202004616.921.81$83
Apr 202017614.751.80$152
Mar 202027430.341.86$198
Feb 20200049.881.98$0
Jan 20200157.252.09$2
Dec 201902059.012.30$46
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 201902953.112.30$67
Jul 201918756.272.46$270
Jun 201916452.782.49$212
May 2019312358.482.74$513
Apr 2019112362.632.75$401
Mar 2019112556.803.06$440
Feb 2019211050.852.79$409
Jan 201917446.033.23$285
Dec 201816546.594.19$319
Nov 201818052.934.24$392
Oct 201817161.443.40$303
Sep 201807059.543.11$218
Aug 201818059.403.07$305
Jul 201818565.142.93$314
Jun 201818060.183.08$306
May 201829265.382.90$398
Apr 2018111163.842.90$386
Mar 2018210661.222.79$418
Feb 201819561.782.77$325
Jan 2018211162.874.01$571
Dec 201717357.272.92$271
Nov 201729355.423.12$401
Oct 201719349.292.98$327
Sep 201719847.523.09$350
Aug 2017212445.373.00$463
Jul 2017311643.873.09$490
Jun 2017114842.493.09$499
May 2017111445.373.26$417
Apr 2017113447.933.21$478
Mar 2017112146.772.98$408
Feb 201719750.452.95$337
Jan 2017111149.413.42$429
Dec 2016011048.763.72$410
Nov 201617842.492.64$249
Oct 201618046.193.09$293
Sep 201609041.553.10$279
Aug 2016110241.442.92$340
Jul 201618041.622.92$276
Jun 2016110845.352.69$335
May 201609242.521.99$183
Apr 2016111236.561.99$260
Mar 2016110333.011.79$218
Feb 201619326.472.06$218
Jan 201617427.352.36$202
Dec 2015211132.362.00$287
Nov 2015110338.792.17$262
Oct 201519743.552.43$279
Sep 2015313842.992.76$510
Aug 2015111540.162.87$371
Jul 2015220748.152.95$706
Jun 2015320356.152.88$754
May 2015219355.212.96$681
Apr 2015220149.822.71$644
Mar 2015119142.892.93$603
Feb 2015216744.662.98$586
Jan 2015213543.433.10$505
Dec 2014214354.693.59$623
Nov 2014215170.464.25$783
Oct 2014221578.303.90$995
Sep 2014221186.164.05$1,026
Aug 2014422289.394.04$1,253
Jul 2014529496.564.18$1,712
Jun 2014426598.164.74$1,648
May 2014530894.734.73$1,929
Apr 2014946795.944.81$3,109
Mar 2014543595.895.06$2,679
Feb 2014523597.406.19$1,942
Jan 2014524890.404.86$1,657
Dec 2013626391.824.35$1,696
Nov 2013524688.853.74$1,364
Oct 2013630497.423.78$1,733
Sep 20135259104.113.72$1,483
Aug 20135332104.253.52$1,691
Jul 20134292102.523.72$1,496
Jun 2013624194.403.93$1,514
May 2013627194.834.15$1,693
Apr 2013624293.964.28$1,600
Mar 2013527693.623.91$1,548
Feb 2013418691.233.42$1,001
Jan 2013526591.603.42$1,364
Dec 2012526586.773.42$1,340
Nov 2012221986.953.62$968
Oct 2012327089.383.40$1,186
Sep 2012427694.672.92$1,184
Aug 2012440892.662.91$1,557
Jul 2012229685.133.02$1,064
Jun 2012231179.822.52$943
May 2012253091.612.49$1,502
Apr 20123526101.652.00$1,355
Mar 20123474105.052.22$1,368
Feb 20122388101.102.57$1,199
Jan 2012134798.092.73$1,047
Dec 2011154096.873.24$1,846
Nov 2011158895.723.31$2,043
Oct 2011163384.983.65$2,395
Sep 2011190983.623.99$3,707
Aug 2011193283.404.15$3,951
Jul 201121,07694.144.52$5,049
Jun 201121,26392.904.64$6,046
May 201131,58598.134.40$7,276
Apr 201131,721105.964.33$7,775
Mar 201131,90696.364.06$8,022
Feb 201142,19585.644.18$9,518
Jan 201141,61286.504.59$7,743
Dec 2010281,85785.734.35$10,474
Nov 2010342,04180.843.80$10,495
Oct 2010312,29878.103.51$10,485
Sep 2010342,73072.633.98$13,333
Aug 2010311,97973.684.42$11,030
Jul 2010693,90272.554.74$23,488
Jun 2010763,75070.364.91$23,761
May 2010524,54071.124.24$22,926
Apr 2010594,81381.694.12$24,662
Mar 2010383,47478.394.39$18,225
Feb 2010413,25473.585.44$20,726
Jan 2010644,24374.365.96$30,065
Dec 2009775,02471.445.48$33,051
Nov 2009605,15474.593.75$23,811
Oct 2009715,58872.544.11$28,118
Sep 2009695,33465.543.06$20,870
Aug 2009796,19267.423.22$25,255
Jul 2009846,55461.133.46$27,841
Jun 2009716,60566.163.90$30,424
May 2009737,90254.743.93$35,017
Apr 2009856,89546.773.59$28,711
Mar 20091017,97542.144.06$36,627
Feb 2009957,81132.814.63$39,305
Jan 20091039,05935.865.37$52,349
Dec 200813210,85737.105.98$69,791
Nov 200812212,08655.496.86$89,684
Oct 200813613,19575.246.92$101,568
Sep 20089610,806101.767.88$94,889
Aug 200812512,762114.228.48$122,538
Jul 200816917,228131.0811.39$218,370
Jun 200812716,014131.3313.03$225,383
May 200813120,476123.1711.57$253,130
Apr 200813216,292110.3110.45$184,892
Mar 200822521,683101.909.66$232,474
Feb 200827335,44092.538.77$336,090
Jan 200846742,90290.388.21$394,250
Dec 200764148,87888.337.30$413,525
Nov 200767646,26691.677.29$399,327
Oct 200754236,91482.856.92$300,423
Sep 200776752,52075.846.24$386,113
Aug 200786662,82569.066.39$461,128

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2023 — as filed, then multipliedworked
Condensate             0 bbl  × $ 72.85 =         $0
Gas                   24 Mcf  × $  2.39 =        $57

────────────────────────────────────────────────────
Month total                                      $57

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/229698 is the state's own key, not one this site invented.