TREADAWAY

Operated by QUANTUM RESOURCES MANAGEMENT,LLC (P-5 684554) in the WILLOW SPRINGS (COTTON VALLEY,W) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 183812District 06Field 977521102 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
Jun 2001 – Nov 2013
Value, last 12 filed months
$513
at the published price for each month
Months reported
150
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 26 leases and 26 wells, and the rule below applies to all of them.

Discovered
1975-12-11
as the register files it
Field class
Gas
the register's own label
Between wells
600 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2010-04-20.

The Commission's schedule remark for this field reads: SPRINGS (COTTON VALLEY) FIELD, ADMINISTRATIVE EFFECT DATE 5/1/14.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112001-10-01144682
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition42 bbl$3,678
GasProduction316,008 Mcf$1,303,652
Total$1,307,330

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.6178, -94.7725. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.61778, -94.77255 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,900 ft.

Completions filed
Nov 2013
1 of 1 wells

1 well

42-18331461110,900 ftNov 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (150)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

150 months

Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 2013023104.113.72$86
Aug 2013031104.253.52$109
Jul 2013030102.523.72$112
Jun 20130894.403.93$31
May 20130294.834.15$8
Apr 20130793.964.28$30
Mar 20130793.623.91$27
Feb 201301191.233.42$38
Jan 201302191.603.42$72
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 201204189.383.40$139
Sep 20120294.672.92$6
Aug 20120092.662.91$0
Jul 201204885.133.02$145
Jun 20120479.822.52$10
May 2012015391.612.49$381
Apr 201203101.652.00$6
Mar 201200105.052.22$0
Feb 2012035101.102.57$90
Jan 20120098.092.73$0
Dec 20110696.873.24$19
Nov 20110095.723.31$0
Oct 201109184.983.65$332
Sep 20110383.623.99$12
Aug 201101183.404.15$46
Jul 20110694.144.52$27
Jun 201101092.904.64$46
May 201102998.134.40$128
Apr 201105105.964.33$22
Mar 201101796.364.06$69
Feb 20110085.644.18$0
Jan 2011025486.504.59$1,166
Dec 2010010385.734.35$448
Nov 20100080.843.80$0
Oct 20100378.103.51$11
Sep 201007872.633.98$310
Aug 20100173.684.42$4
Jul 20100572.554.74$24
Jun 201007770.364.91$378
May 20100071.124.24$0
Apr 2010014381.694.12$590
Mar 20100078.394.39$0
Feb 20100173.585.44$5
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20091074.593.75$75
Oct 20095272.544.11$371
Sep 2009121365.543.06$826
Aug 2009118667.423.22$666
Jul 200912561.133.46$148
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 200909342.144.06$377
Feb 20090732.814.63$32
Jan 200911735.865.37$127
Dec 20080037.105.98$0
Nov 20081055.496.86$55
Oct 2008213475.246.92$1,078
Sep 200820101.767.88$204
Aug 2008619114.228.48$847
Jul 2008512131.0811.39$792
Jun 2008110131.3313.03$262
May 200812123.1711.57$146
Apr 200800110.3110.45$0
Mar 200818101.909.66$179
Feb 200811392.538.77$207
Jan 200811290.388.21$189
Dec 20070088.337.30$0
Nov 20070391.677.29$22
Oct 20070582.856.92$35
Sep 200702375.846.24$144
Aug 20070169.066.39$6
Jul 200703070.906.39$192
Jun 200702062.007.55$151
May 200702058.747.85$157
Apr 2007018059.617.81$1,405
Mar 2007063056.927.30$4,600
Feb 2007059555.108.22$4,889
Jan 200701,02450.306.73$6,888
Dec 200603356.656.92$228
Nov 2006033854.207.62$2,575
Oct 2006038954.906.01$2,339
Sep 200607060.085.04$353
Aug 2006028168.717.34$2,063
Jul 2006019169.376.34$1,211
Jun 2006046666.286.38$2,975
May 2006083866.016.42$5,384
Apr 2006096764.397.36$7,118
Mar 2006042456.707.08$3,003
Feb 2006020057.597.75$1,550
Jan 2006067360.598.93$6,012
Dec 2005077354.9413.42$10,370
Nov 2005074954.6910.59$7,931
Oct 2005070658.3413.80$9,740
Sep 2005099561.4512.08$12,019
Aug 200501,49861.519.80$14,676
Jul 200502,03555.697.84$15,962
Jun 200501,58052.337.38$11,662
May 200501,65545.226.65$11,008
Apr 200501,73549.207.36$12,770
Mar 200502,74750.377.15$19,654
Feb 200502,60345.226.31$16,430
Jan 200502,73443.166.32$17,285
Dec 200402,91839.866.75$19,700
Nov 200403,51745.286.33$22,264
Oct 2004054049.706.52$3,518
Sep 200406143.245.28$322
Aug 200401,46642.375.55$8,137
Jul 200402,64238.286.08$16,074
Jun 200401,98436.106.43$12,763
May 200402,24337.486.49$14,567
Apr 200402,82034.475.86$16,521
Mar 200402,74734.365.53$15,191
Feb 200401,78632.455.51$9,840
Jan 200402,77532.036.30$17,482
Dec 200303,53730.266.30$22,289
Nov 200303,56328.804.60$16,373
Oct 200303,89528.174.76$18,539
Sep 200303,70126.314.75$17,577
Aug 200303,59829.765.13$18,457
Jul 200304,18729.415.17$21,650
Jun 200304,20828.565.98$25,176
May 200304,37926.595.97$26,154
Apr 200304,49926.675.41$24,327
Mar 200304,77831.146.10$29,127
Feb 200304,60633.487.93$36,507
Jan 200305,30930.315.58$29,635
Dec 200205,52726.914.85$26,827
Nov 200205,24124.664.14$21,682
Oct 200206,22026.464.23$26,305
Sep 200205,92027.443.64$21,520
Aug 200206,34725.963.16$20,083
Jul 200207,02724.583.06$21,515
Jun 200206,85523.733.34$22,884
May 200207,56724.663.58$27,120
Apr 200208,16823.653.51$28,689
Mar 200209,30422.003.10$28,868
Feb 200209,39518.222.38$22,320
Jan 2002011,84817.172.38$28,147
Dec 2001012,93116.932.36$30,574
Nov 2001012,86518.072.41$30,947
Oct 2001015,94319.782.53$40,318
Sep 2001017,60824.262.25$39,641
Aug 2001022,35224.873.05$68,244
Jul 2001029,02123.933.20$92,782
Jun 2001011,07724.563.82$42,360

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2013 — as filed, then multipliedworked
Condensate             0 bbl  × $104.11 =         $0
Gas                   23 Mcf  × $  3.72 =        $86

────────────────────────────────────────────────────
Month total                                      $86

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/183812 is the state's own key, not one this site invented.