TREADAWAY

Operated by QUANTUM RESOURCES MANAGEMENT,LLC (P-5 684554) in the WILLOW SPRINGS (COTTON VALLEY,W) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 184827District 06Field 977521102 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.2 M
Jun 2001 – Oct 2013
Value, last 12 filed months
$46
at the published price for each month
Months reported
149
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 26 leases and 26 wells, and the rule below applies to all of them.

Discovered
1975-12-11
as the register files it
Field class
Gas
the register's own label
Between wells
600 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2010-04-20.

The Commission's schedule remark for this field reads: SPRINGS (COTTON VALLEY) FIELD, ADMINISTRATIVE EFFECT DATE 5/1/14.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112001-10-12145011
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition233 bbl$16,310
GasProduction648,922 Mcf$3,191,868
Total$3,208,178

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.6142, -94.7726. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.61424, -94.77256 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,888 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,888 ft.

Completions filed
Oct 2013
1 of 1 wells

1 well

42-18331460210,888 ftOct 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (149)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

149 months

Oct 20130097.423.78$0
Sep 201302104.113.72$7
Aug 201300104.253.52$0
Jul 201303102.523.72$11
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130393.964.28$13
Mar 20130093.623.91$0
Feb 20130191.233.42$3
Jan 20130191.603.42$3
Dec 20120086.773.42$0
Nov 20120286.953.62$7
Oct 201201089.383.40$34
Sep 2012030294.672.92$881
Aug 201206192.662.91$177
Jul 2012011285.133.02$338
Jun 20120479.822.52$10
May 20120391.612.49$7
Apr 201202101.652.00$4
Mar 201200105.052.22$0
Feb 201204101.102.57$10
Jan 2012051998.092.73$1,419
Dec 20110496.873.24$13
Nov 201104095.723.31$132
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110183.404.15$4
Jul 201108394.144.52$375
Jun 20110092.904.64$0
May 2011075498.134.40$3,321
Apr 20110602105.964.33$2,609
Mar 2011018296.364.06$738
Feb 201104985.644.18$205
Jan 201107286.504.59$330
Dec 2010035285.734.35$1,530
Nov 201002,03780.843.80$7,731
Oct 2010054578.103.51$1,912
Sep 201001,40572.633.98$5,591
Aug 201001,56173.684.42$6,899
Jul 201001,55472.554.74$7,361
Jun 201001,52270.364.91$7,474
May 201001,48071.124.24$6,268
Apr 201002,12381.694.12$8,752
Mar 201001,43278.394.39$6,285
Feb 2010017173.585.44$931
Jan 2010022274.365.96$1,324
Dec 200906871.445.48$373
Nov 200919274.593.75$420
Oct 200973572.544.11$652
Sep 2009112,81665.543.06$9,351
Aug 2009142,31567.423.22$8,395
Jul 2009143,44361.133.46$12,784
Jun 2009162,26566.163.90$9,881
May 2009183,24154.743.93$13,709
Apr 2009193,11046.773.59$12,046
Mar 2009142,71242.144.06$11,598
Feb 2009132,65932.814.63$12,746
Jan 2009133,64335.865.37$20,033
Dec 200872,63737.105.98$16,021
Nov 200863255.496.86$552
Oct 200845775.246.92$696
Sep 2008351101.767.88$707
Aug 200834114.228.48$377
Jul 2008233131.0811.39$638
Jun 2008382131.3313.03$1,463
May 200812204123.1711.57$3,839
Apr 20085238110.3110.45$3,040
Mar 200817253101.909.66$4,177
Feb 20081421892.538.77$3,207
Jan 20081738290.388.21$4,671
Dec 200702,39088.337.30$17,452
Nov 200703,95691.677.29$28,846
Oct 200704,80282.856.92$33,239
Sep 200702,45275.846.24$15,311
Aug 200701,47469.066.39$9,416
Jul 200704,86570.906.39$31,077
Jun 200702,69462.007.55$20,336
May 2007093358.747.85$7,321
Apr 200703,59859.617.81$28,083
Mar 200704,12156.927.30$30,091
Feb 200702,60255.108.22$21,378
Jan 200704,58250.306.73$30,822
Dec 2006099056.656.92$6,849
Nov 200606,33954.207.62$48,287
Oct 200602,17554.906.01$13,080
Sep 200603,11260.085.04$15,676
Aug 200604,75668.717.34$34,909
Jul 200606,01369.376.34$38,139
Jun 200603,68566.286.38$23,525
May 200604,00666.016.42$25,739
Apr 200607,26064.397.36$53,437
Mar 200602,34356.707.08$16,595
Feb 200602,66557.597.75$20,657
Jan 200603,30160.598.93$29,489
Dec 200503,87954.9413.42$52,038
Nov 200504,49954.6910.59$47,637
Oct 200504,16158.3413.80$57,404
Sep 200503,67561.4512.08$44,390
Aug 200504,70061.519.80$46,045
Jul 200504,67255.697.84$36,645
Jun 200504,70652.337.38$34,735
May 200504,90945.226.65$32,651
Apr 200505,33749.207.36$39,283
Mar 200505,69950.377.15$40,776
Feb 200505,41445.226.31$34,173
Jan 200504,13943.166.32$26,168
Dec 200404,40839.866.75$29,759
Nov 200406,37345.286.33$40,344
Oct 200405,26149.706.52$34,276
Sep 200404,67843.245.28$24,718
Aug 200406,22742.375.55$34,564
Jul 200406,91438.286.08$42,066
Jun 200404,74036.106.43$30,493
May 200406,36837.486.49$41,357
Apr 200406,12434.475.86$35,877
Mar 200405,69934.365.53$31,516
Feb 200406,30332.455.51$34,727
Jan 200407,23132.036.30$45,553
Dec 200307,39430.266.30$46,594
Nov 200307,30528.804.60$33,568
Oct 200307,65328.174.76$36,426
Sep 200307,73326.314.75$36,727
Aug 200308,33329.765.13$42,746
Jul 200308,94329.415.17$46,243
Jun 200308,45428.565.98$50,580
May 200309,45926.595.97$56,496
Apr 200309,41926.675.41$50,931
Mar 200304,94931.146.10$30,169
Feb 200309,53033.487.93$75,534
Jan 2003010,98230.315.58$61,302
Dec 2002011,23826.914.85$54,547
Nov 2002011,64024.664.14$48,154
Oct 2002012,55226.464.23$53,084
Sep 2002012,30227.443.64$44,720
Aug 2002012,74325.963.16$40,321
Jul 2002013,27524.583.06$40,645
Jun 2002012,92423.733.34$43,143
May 2002012,67824.663.58$45,438
Apr 2002012,67823.653.51$44,529
Mar 2002013,51822.003.10$41,943
Feb 2002012,42718.222.38$29,523
Jan 2002014,75917.172.38$35,063
Dec 2001016,33916.932.36$38,632
Nov 2001017,32618.072.41$41,678
Oct 2001019,81019.782.53$50,097
Sep 2001020,86224.262.25$46,967
Aug 2001024,28524.873.05$74,146
Jul 2001031,16423.933.20$99,634
Jun 200107,20824.563.82$27,565

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2013 — as filed, then multipliedworked
Condensate             0 bbl  × $104.11 =         $0
Gas                    2 Mcf  × $  3.72 =         $7

────────────────────────────────────────────────────
Month total                                       $7

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/184827 is the state's own key, not one this site invented.