BURTON

Operated by BUFFCO PRODUCTION INC. (P-5 106406) in the OVERTON (COTTON VALLEY SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 206368District 06Field 678491502 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
Oct 2004 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
260
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 702 leases and 702 wells, and the rule below applies to all of them.

Discovered
1977-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2014-03-25.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-03-06173557
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6,353 bbl$401,031
GasProduction142,158 Mcf$880,337
Total$1,281,369

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1147, -95.0794. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.11467, -95.07945 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,035 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,035 ft.

Completions filed
Oct 2004
1 of 1 wells

1 well

42-07331103112,035 ftOct 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (260)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

260 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220787.185.86$41
Sep 20220084.888.16$0
Aug 20222094.529.13$189
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220291.054.86$10
Jan 20220181.844.54$5
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 202103969.493.38$132
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 2021019661.302.72$533
Feb 20210057.805.55$0
Jan 20210650.412.81$17
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 202034236.972.48$215
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200149.881.98$2
Jan 2020016357.252.09$341
Dec 2019241059.012.30$1,063
Nov 2019180055.302.75$9,954
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190953.112.30$21
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 201917058.482.74$250
Apr 20190062.632.75$0
Mar 20190156.803.06$3
Feb 20190150.852.79$3
Jan 2019021846.033.23$704
Dec 20180646.594.19$25
Nov 20180152.934.24$4
Oct 201808161.443.40$275
Sep 2018014259.543.11$441
Aug 20180059.403.07$0
Jul 20180265.142.93$6
Jun 20180160.183.08$3
May 20180065.382.90$0
Apr 201801563.842.90$44
Mar 201803661.222.79$100
Feb 2018031661.782.77$874
Jan 2018049262.874.01$1,973
Dec 2017011857.272.92$345
Nov 201706355.423.12$196
Oct 20170649.292.98$18
Sep 201704547.523.09$139
Aug 2017017745.373.00$532
Jul 2017047443.873.09$1,463
Jun 20170042.493.09$0
May 20170345.373.26$10
Apr 201701747.933.21$55
Mar 20170346.772.98$9
Feb 2017149650.452.95$1,515
Jan 201717852649.413.42$10,593
Dec 2016151148.763.72$1,951
Nov 2016031642.492.64$836
Oct 201604746.193.09$145
Sep 2016054141.553.10$1,677
Aug 2016058641.442.92$1,714
Jul 2016038341.622.92$1,120
Jun 201609945.352.69$266
May 201618121242.521.99$8,118
Apr 2016162736.561.99$1,285
Mar 2016168633.011.79$1,264
Feb 201601,09226.472.06$2,253
Jan 2016019327.352.36$456
Dec 20150132.362.00$2
Nov 201516258638.792.17$7,554
Oct 201501,14843.552.43$2,786
Sep 2015114542.992.76$443
Aug 2015052940.162.87$1,520
Jul 2015043148.152.95$1,269
Jun 2015049656.152.88$1,430
May 201518247155.212.96$11,440
Apr 201518234249.822.71$9,993
Mar 20150642.892.93$18
Feb 2015045044.662.98$1,339
Jan 2015037743.433.10$1,169
Dec 2014040354.693.59$1,447
Nov 2014035870.464.25$1,522
Oct 2014042978.303.90$1,674
Sep 2014039086.164.05$1,578
Aug 201415030689.394.04$14,643
Jul 2014024496.564.18$1,020
Jun 2014064498.164.74$3,051
May 2014038994.734.73$1,839
Apr 2014038895.944.81$1,866
Mar 2014038695.895.06$1,952
Feb 2014042497.406.19$2,625
Jan 2014042890.404.86$2,080
Dec 201318443091.824.35$18,767
Nov 2013043688.853.74$1,630
Oct 2013055697.423.78$2,101
Sep 20132150104.113.72$766
Aug 201300104.253.52$0
Jul 20130342102.523.72$1,271
Jun 2013026194.403.93$1,027
May 2013033394.834.15$1,382
Apr 2013060193.964.28$2,574
Mar 2013032793.623.91$1,280
Feb 201318563591.233.42$19,049
Jan 2013033691.603.42$1,149
Dec 2012140586.773.42$1,472
Nov 2012062386.953.62$2,258
Oct 2012051489.383.40$1,747
Sep 2012063094.672.92$1,839
Aug 2012054392.662.91$1,579
Jul 2012036885.133.02$1,112
Jun 201216565079.822.52$14,808
May 2012182991.612.49$2,154
Apr 20120323101.652.00$645
Mar 201200105.052.22$0
Feb 20120471101.102.57$1,211
Jan 2012034998.092.73$954
Dec 2011160696.873.24$2,060
Nov 2011059795.723.31$1,977
Oct 20119568184.983.65$10,558
Sep 2011138683.623.99$1,622
Aug 2011072983.404.15$3,025
Jul 2011060894.144.52$2,746
Jun 201116929692.904.64$17,074
May 2011147598.134.40$2,190
Apr 20111549105.964.33$2,485
Mar 2011160996.364.06$2,567
Feb 2011064185.644.18$2,679
Jan 2011162586.504.59$2,954
Dec 2010061285.734.35$2,661
Nov 201017369880.843.80$16,634
Oct 2010076378.103.51$2,677
Sep 2010269072.633.98$2,891
Aug 2010060473.684.42$2,669
Jul 2010062572.554.74$2,960
Jun 2010095170.364.91$4,670
May 201017977171.124.24$15,996
Apr 2010010981.694.12$449
Mar 2010094078.394.39$4,125
Feb 2010051373.585.44$2,792
Jan 2010054474.365.96$3,244
Dec 200918978671.445.48$17,812
Nov 2009051474.593.75$1,928
Oct 2009169272.544.11$2,917
Sep 2009099865.543.06$3,059
Aug 2009157667.423.22$1,921
Jul 20092231,59361.133.46$19,151
Jun 2009027366.163.90$1,063
May 2009040654.743.93$1,594
Apr 2009025946.773.59$929
Mar 200901,13942.144.06$4,623
Feb 2009038132.814.63$1,765
Jan 2009050235.865.37$2,696
Dec 2008070237.105.98$4,196
Nov 2008035755.496.86$2,449
Oct 2008033275.246.92$2,298
Sep 20080439101.767.88$3,458
Aug 20080612114.228.48$5,192
Jul 2008164527131.0811.39$27,499
Jun 200831,653131.3313.03$21,937
May 200831,150123.1711.57$13,680
Apr 200841,575110.3110.45$16,908
Mar 2008155376101.909.66$19,428
Feb 200862,34392.538.77$21,105
Jan 20080090.388.21$0
Dec 200724788.337.30$520
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 200705869.066.39$371
Jul 20071831,13170.906.39$20,199
Jun 200741,17662.007.55$9,125
May 200751,24058.747.85$10,023
Apr 200721,30759.617.81$10,321
Mar 20071821,19456.927.30$19,078
Feb 2007483055.108.22$7,040
Jan 200721,13750.306.73$7,749
Dec 20061891,86456.656.92$23,603
Nov 2006045254.207.62$3,443
Oct 200616723154.906.01$10,557
Sep 200641,46060.085.04$7,595
Aug 2006093968.717.34$6,892
Jul 200631,10069.376.34$7,185
Jun 200621,26566.286.38$8,208
May 20062041,33766.016.42$22,056
Apr 200601,47364.397.36$10,842
Mar 200601,64256.707.08$11,630
Feb 20061751,32057.597.75$20,310
Jan 200601,34160.598.93$11,980
Dec 20051911,50454.9413.42$30,670
Nov 200501,78954.6910.59$18,943
Oct 200501,71358.3413.80$23,632
Sep 200502,00861.4512.08$24,255
Aug 20051672,43161.519.80$34,088
Jul 20051892,18755.697.84$27,679
Jun 20051872,47452.337.38$28,046
May 20051872,71945.226.65$26,541
Apr 200503,07149.207.36$22,604
Mar 20051792,93650.377.15$30,023
Feb 20051923,99945.226.31$33,924
Jan 20052135,57643.166.32$44,446
Dec 20041837,68039.866.75$59,143
Nov 200439810,82945.286.33$86,574
Oct 200406,52949.706.52$42,537

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2022 — as filed, then multipliedworked
Condensate             0 bbl  × $ 87.18 =         $0
Gas                    7 Mcf  × $  5.86 =        $41

────────────────────────────────────────────────────
Month total                                      $41

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/206368 is the state's own key, not one this site invented.