STEELE GAS UNIT

Operated by JAMEX, INC. (P-5 429659) in the OVERTON (COTTON VALLEY SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 285460District 06Field 67849150CondensateGasSave
Value, all time
$8.2 M
May 2018 – May 2026
Value, last 12 filed months
$338 k
at the published price for each month
Months reported
97
no gaps in the span
Streams
2
condensate, gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition26,590 bbl$1,583,961
GasProduction2,038,289 Mcf$6,664,912
Total$8,248,873

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1137, -95.0659. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.11372, -95.06592 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,749 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,749 ft.

Completions filed
May 2018
1 of 1 wells

1 well

42-073315691H11,749 ftMay 2018

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (97)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

97 months

May 2026257,913106.413.05$26,762
Apr 2026116,71498.932.87$48,063
Mar 202652,28989.753.15$7,658
Feb 2026427,98763.503.75$32,621
Jan 202606,94959.138.00$55,578
Dec 202501,87156.664.41$8,257
Nov 202506,87358.593.93$26,986
Oct 202507,07759.383.30$23,388
Sep 2025197,43362.743.08$24,063
Aug 202509,27963.933.01$27,974
Jul 2025369,16166.743.32$32,773
Jun 202507,50766.483.13$23,487
May 202509,26360.553.23$29,941
Apr 202509,57662.363.54$33,929
Mar 202509,85367.704.27$42,056
Feb 202508,37470.884.34$36,350
Jan 202509,62574.324.28$41,182
Dec 202409,72168.993.12$30,343
Nov 202409,43669.052.20$20,744
Oct 20241869,79671.372.28$35,623
Sep 2024399,17769.612.36$24,413
Aug 2024010,21975.632.06$21,088
Jul 2024249,42179.932.15$22,141
Jun 2024010,23778.082.63$26,964
May 202434710,48278.812.20$50,391
Apr 2024010,11684.451.66$16,784
Mar 202417610,40580.301.55$30,210
Feb 202469,71276.091.78$17,779
Jan 202407,70873.023.30$25,418
Dec 202399,74771.262.61$26,088
Nov 202359,35377.892.81$26,649
Oct 2023710,06085.443.09$31,656
Sep 20231849,70489.042.74$42,924
Aug 20231737,28680.522.67$33,405
Jul 202328,85074.852.64$23,530
Jun 202318,83368.962.26$20,018
May 202309,22270.622.23$20,541
Apr 202309,39578.122.24$21,024
Mar 202308,93672.852.39$21,385
Feb 202307,84775.112.47$19,348
Jan 20233479,98976.533.39$60,396
Dec 202209,73576.415.73$55,773
Nov 202239,91985.005.65$56,260
Oct 202217010,81187.185.86$78,214
Sep 2022010,56584.888.16$86,249
Aug 2022011,79894.529.13$107,682
Jul 202208,924101.587.54$67,306
Jun 202236114,642115.097.98$158,350
May 202218012,199109.378.43$122,561
Apr 2022011,721104.226.84$80,144
Mar 202236913,590108.885.08$109,165
Feb 202235713,24691.054.86$96,865
Jan 202222514,93581.844.54$86,184
Dec 20213415,38271.323.90$62,401
Nov 20213715,25577.435.24$82,753
Oct 20212416,81079.795.71$97,965
Sep 20213816,00769.865.35$88,307
Aug 20211015,80666.024.22$67,371
Jul 202122416,86570.783.98$83,013
Jun 20211317,00669.493.38$58,394
May 20216918,00563.483.02$58,713
Apr 20211218,42260.362.76$51,540
Mar 202126019,64061.302.72$69,299
Feb 20211715,89757.805.55$89,178
Jan 20214520,76750.412.81$60,629
Dec 202036918,59944.642.68$66,233
Nov 20204320,22138.772.71$56,397
Oct 202018820,23936.972.48$57,111
Sep 2020320,15337.091.99$40,237
Aug 202075919,83539.982.39$77,653
Jul 202054916,88338.371.83$51,879
Jun 20202519,25934.901.69$33,426
May 2020019,84316.921.81$36,010
Apr 202033321,36914.751.80$43,470
Mar 2020418,44830.341.86$34,365
Feb 202059821,91949.881.98$73,243
Jan 202059121,62257.252.09$79,127
Dec 201938326,32659.012.30$83,265
Nov 201942429,63155.302.75$104,953
Oct 201953329,66553.472.42$100,246
Sep 201918030,97555.052.66$92,218
Aug 201954035,84253.112.30$111,272
Jul 201935634,78056.272.46$105,593
Jun 201952034,51752.782.49$113,434
May 201936134,75558.482.74$116,351
Apr 201974136,20962.632.75$146,009
Mar 201934233,13556.803.06$120,888
Feb 20191,07845,39350.852.79$181,564
Jan 201998656,70146.033.23$228,427
Dec 20181,24763,48246.594.19$323,798
Nov 20181,38170,75152.934.24$372,885
Oct 20181,37975,62961.443.40$341,719
Sep 20181,57791,55259.543.11$378,438
Aug 20181,903100,57559.403.07$421,457
Jul 20182,100104,13265.142.93$442,097
Jun 20182,645109,59960.183.08$496,403
May 201837044,90765.382.90$154,457

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate            25 bbl  × $106.41 =     $2,660
Gas                7,913 Mcf  × $  3.05 =    $24,102

────────────────────────────────────────────────────
Month total                                  $26,762

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/285460 is the state's own key, not one this site invented.