BENTON "L"

Operated by SYDRI OPERATING, LLC (P-5 833597) in the MINDEN (COTTON VALLEY CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 214099District 06Field 617921112 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.4 M
Sep 2005 – May 2026
Value, last 12 filed months
$38 k
at the published price for each month
Months reported
249
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 456 leases and 456 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2018-03-20.

The Commission's schedule remark for this field reads: EXCEPTION TO SWR51(A) 30 DAY RULE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-10-13166020
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,583 bbl$174,800
GasProduction682,335 Mcf$4,204,056
Total$4,378,856

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1108, -94.8350. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.11085, -94.83496 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,900 ft.

Completions filed
Sep 2005
1 of 1 wells

1 well

42-401336051510,900 ftSep 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (249)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

249 months

May 20260948106.413.05$2,887
Apr 2026090498.932.87$2,594
Mar 2026199089.753.15$3,208
Feb 2026070963.503.75$2,659
Jan 2026080659.138.00$6,446
Dec 2025067356.664.41$2,970
Nov 2025078858.593.93$3,094
Oct 2025075559.383.30$2,495
Sep 2025096962.743.08$2,982
Aug 202501,07863.933.01$3,250
Jul 2025088166.743.32$2,921
Jun 2025581166.483.13$2,870
May 2025598460.553.23$3,483
Apr 2025588662.363.54$3,451
Mar 2025583567.704.27$3,903
Feb 2025578670.884.34$3,766
Jan 2025591474.324.28$4,282
Dec 2024092268.993.12$2,878
Nov 20241387169.052.20$2,812
Oct 2024594871.372.28$2,520
Sep 2024587669.612.36$2,419
Aug 202401,04575.632.06$2,156
Jul 202401,28679.932.15$2,761
Jun 2024082378.082.63$2,168
May 202401,15978.812.20$2,548
Apr 202401,50284.451.66$2,492
Mar 20240080.301.55$0
Feb 2024050576.091.78$901
Jan 2024052973.023.30$1,744
Dec 2023063271.262.61$1,650
Nov 2023075077.892.81$2,106
Oct 202301,50985.443.09$4,659
Sep 202301,08389.042.74$2,962
Aug 2023089280.522.67$2,384
Jul 202301,20174.852.64$3,173
Jun 202301,10268.962.26$2,489
May 202301,12770.622.23$2,510
Apr 2023095478.122.24$2,135
Mar 2023196072.852.39$2,370
Feb 2023087475.112.47$2,155
Jan 2023085476.533.39$2,893
Dec 202201,03976.415.73$5,953
Nov 202201,04585.005.65$5,900
Oct 202201,61387.185.86$9,458
Sep 202201,17784.888.16$9,609
Aug 202201,17194.529.13$10,688
Jul 202201,456101.587.54$10,981
Jun 20220923115.097.98$7,363
May 202201,034109.378.43$8,720
Apr 202201,192104.226.84$8,150
Mar 20220884108.885.08$4,488
Feb 20228291691.054.86$11,917
Jan 2022094781.844.54$4,297
Dec 202101,07071.323.90$4,172
Nov 202101,20777.435.24$6,321
Oct 202101,27579.795.71$7,285
Sep 202101,10869.865.35$5,929
Aug 202101,20066.024.22$5,065
Jul 202101,35170.783.98$5,380
Jun 202101,11669.493.38$3,773
May 202101,13663.483.02$3,428
Apr 202101,33360.362.76$3,677
Mar 202101,71761.302.72$4,665
Feb 2021065657.805.55$3,639
Jan 2021088450.412.81$2,484
Dec 2020038544.642.68$1,030
Nov 2020072438.772.71$1,960
Oct 2020076236.972.48$1,889
Sep 2020087837.091.99$1,748
Aug 2020082239.982.39$1,961
Jul 2020086938.371.83$1,586
Jun 2020075634.901.69$1,278
May 2020063716.921.81$1,156
Apr 2020366014.751.80$1,235
Mar 2020088530.341.86$1,643
Feb 2020099749.881.98$1,975
Jan 202001,10857.252.09$2,321
Dec 201901,28459.012.30$2,959
Nov 201901,08055.302.75$2,971
Oct 201901,44453.472.42$3,492
Sep 201901,38755.052.66$3,686
Aug 201901,09453.112.30$2,521
Jul 201901,32456.272.46$3,257
Jun 201901,47852.782.49$3,682
May 201901,28558.482.74$3,521
Apr 201901,87562.632.75$5,158
Mar 201901,53356.803.06$4,694
Feb 2019063550.852.79$1,773
Jan 2019080746.033.23$2,605
Dec 2018096846.594.19$4,052
Nov 2018088752.934.24$3,758
Oct 201801,00061.443.40$3,398
Sep 201801,10959.543.11$3,447
Aug 201801,26159.403.07$3,867
Jul 201801,01365.142.93$2,970
Jun 2018086660.183.08$2,665
May 201801,14665.382.90$3,324
Apr 201801,00263.842.90$2,907
Mar 201801,15261.222.79$3,210
Feb 2018093461.782.77$2,584
Jan 201801,11962.874.01$4,486
Dec 2017092357.272.92$2,697
Nov 201701,69955.423.12$5,298
Oct 2017071649.292.98$2,136
Sep 201701,05947.523.09$3,269
Aug 201701,17045.373.00$3,515
Jul 2017093843.873.09$2,896
Jun 2017082142.493.09$2,535
May 201701,11945.373.26$3,652
Apr 2017079047.933.21$2,537
Mar 201701,12346.772.98$3,351
Feb 201701,33650.452.95$3,945
Jan 201701,49949.413.42$5,125
Dec 201601,15248.763.72$4,289
Nov 201601,16442.492.64$3,078
Oct 2016072246.193.09$2,231
Sep 201601,22241.553.10$3,789
Aug 201601,27441.442.92$3,726
Jul 201601,10241.622.92$3,223
Jun 201601,03045.352.69$2,766
May 2016086742.521.99$1,726
Apr 201601,08536.561.99$2,160
Mar 201601,14533.011.79$2,054
Feb 2016080226.472.06$1,655
Jan 201601,13827.352.36$2,691
Dec 2015691,36432.362.00$4,963
Nov 201501,32638.792.17$2,874
Oct 2015096943.552.43$2,351
Sep 2015367042.992.76$1,977
Aug 201551,19540.162.87$3,633
Jul 201501,71548.152.95$5,051
Jun 2015059156.152.88$1,704
May 201541,21855.212.96$3,821
Apr 2015394949.822.71$2,718
Mar 2015086242.892.93$2,530
Feb 201511,01844.662.98$3,074
Jan 201501,18943.433.10$3,687
Dec 201411,38254.693.59$5,018
Nov 201441,34070.464.25$5,979
Oct 201461,34178.303.90$5,701
Sep 2014089386.164.05$3,613
Aug 2014595689.394.04$4,305
Jul 2014085096.564.18$3,553
Jun 201451,01698.164.74$5,303
May 201414299694.734.73$18,159
Apr 2014499195.944.81$5,150
Mar 2014088595.895.06$4,475
Feb 2014085497.406.19$5,288
Jan 2014193890.404.86$4,650
Dec 2013374891.824.35$3,533
Nov 2013097488.853.74$3,641
Oct 2013499397.423.78$4,143
Sep 201301,111104.113.72$4,130
Aug 20134961104.253.52$3,802
Jul 201321,093102.523.72$4,269
Jun 201371,15494.403.93$5,200
May 201301,07494.834.15$4,456
Apr 2013098893.964.28$4,231
Mar 2013379793.623.91$3,399
Feb 201301,01491.233.42$3,468
Jan 201341,02091.603.42$3,855
Dec 201241,16586.773.42$4,332
Nov 201201,16886.953.62$4,234
Oct 201251,23989.383.40$4,659
Sep 201241,17994.672.92$3,819
Aug 201201,45192.662.91$4,220
Jul 201241,26685.133.02$4,165
Jun 201201,29579.822.52$3,262
May 2012486391.612.49$2,514
Apr 201201,092101.652.00$2,181
Mar 201241,306105.052.22$3,322
Feb 201201,170101.102.57$3,007
Jan 201211,23198.092.73$3,464
Dec 201141,34796.873.24$4,751
Nov 201101,95395.723.31$6,467
Oct 20117814,40784.983.65$59,193
Sep 201172,51083.623.99$10,590
Aug 201111,08183.404.15$4,569
Jul 201101,25894.144.52$5,683
Jun 201101,26192.904.64$5,851
May 201131,28098.134.40$5,933
Apr 201131,291105.964.33$5,912
Mar 201101,34996.364.06$5,473
Feb 201121,25485.644.18$5,413
Jan 201101,47586.504.59$6,768
Dec 201001,50185.734.35$6,526
Nov 20101641,43580.843.80$18,704
Oct 201001,45778.103.51$5,112
Sep 201031,41972.633.98$5,865
Aug 201031,47073.684.42$6,718
Jul 201001,55972.554.74$7,384
Jun 201031,54470.364.91$7,793
May 201001,50971.124.24$6,391
Apr 201031,51181.694.12$6,474
Mar 201001,55578.394.39$6,824
Feb 201031,62373.585.44$9,054
Jan 201002,03174.365.96$12,113
Dec 200921,90271.445.48$10,573
Nov 200932,03574.593.75$7,858
Oct 20091152,14872.544.11$17,171
Sep 200932,26665.543.06$7,141
Aug 200902,30367.423.22$7,412
Jul 200902,37861.133.46$8,239
Jun 200952,51366.163.90$10,119
May 200902,07254.743.93$8,134
Apr 200932,34646.773.59$8,557
Mar 200912,30042.144.06$9,378
Feb 200932,04032.814.63$9,550
Jan 20091662,33535.865.37$18,494
Dec 200842,47937.105.98$14,966
Nov 200802,63455.496.86$18,070
Oct 200825,37075.246.92$37,322
Sep 200802,427101.767.88$19,118
Aug 200803,142114.228.48$26,654
Jul 200822,355131.0811.39$27,084
Jun 200802,890131.3313.03$37,664
May 200833,313123.1711.57$38,715
Apr 20081783,433110.3110.45$55,527
Mar 200822,387101.909.66$23,272
Feb 200822,43592.538.77$21,541
Jan 200802,68090.388.21$21,991
Dec 200703,99288.337.30$29,149
Nov 200733,94791.677.29$29,055
Oct 200713,77982.856.92$26,241
Sep 200703,65075.846.24$22,791
Aug 20071753,83669.066.39$36,590
Jul 200704,06870.906.39$25,986
Jun 200704,32062.007.55$32,609
May 200704,67458.747.85$36,674
Apr 200734,73559.617.81$37,136
Mar 20071864,47956.927.30$43,293
Feb 200714,46455.108.22$36,731
Jan 200745,49350.306.73$37,152
Dec 200635,13256.656.92$35,675
Nov 200636,76754.207.62$51,710
Oct 20061881,05454.906.01$16,660
Sep 200615,20460.085.04$26,274
Aug 200605,65268.717.34$41,485
Jul 200616,51969.376.34$41,418
Jun 200645,42966.286.38$34,923
May 2006184214,09966.016.42$1,387,732
Apr 200605,42364.397.36$39,916
Mar 20061848,49456.707.08$70,595
Feb 200658,60457.597.75$66,979
Jan 2006110,40260.598.93$92,985
Dec 200518811,96354.9413.42$170,817
Nov 200518914,36654.6910.59$162,449
Oct 20052620,31858.3413.80$281,819
Sep 20051610,71661.4512.08$130,422

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  948 Mcf  × $  3.05 =     $2,887

────────────────────────────────────────────────────
Month total                                   $2,887

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/214099 is the state's own key, not one this site invented.