Operated by SYDRI OPERATING, LLC (P-5 833597) in the MINDEN (COTTON VALLEY CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 217832District 06Field 617921112 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.1 M
Dec 2005 – May 2026
Value, last 12 filed months
$72 k
at the published price for each month
Months reported
246
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 456 leases and 456 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2018-03-20.

The Commission's schedule remark for this field reads: EXCEPTION TO SWR51(A) 30 DAY RULE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-09-15167206
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5,354 bbl$371,827
GasProduction674,259 Mcf$3,706,223
Total$4,078,050

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1160, -94.8379. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.11597, -94.83791 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,900 ft.

Completions filed
Dec 2005
1 of 1 wells

1 well

42-401337251910,900 ftDec 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (246)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

246 months

May 202601,753106.413.05$5,339
Apr 202601,09498.932.87$3,139
Mar 202601,33289.753.15$4,195
Feb 202601,39963.503.75$5,247
Jan 202621,51159.138.00$12,203
Dec 202551,58456.664.41$7,274
Nov 202551,34158.593.93$5,558
Oct 2025851,72959.383.30$10,761
Sep 202551,54262.743.08$5,058
Aug 202551,56963.933.01$5,050
Jul 202551,35866.743.32$4,836
Jun 202501,22566.483.13$3,833
May 202501,38460.553.23$4,474
Apr 202501,48462.363.54$5,258
Mar 202501,19267.704.27$5,088
Feb 2025092570.884.34$4,015
Jan 2025593574.324.28$4,372
Dec 202451,25368.993.12$4,256
Nov 2024191,30169.052.20$4,172
Oct 202451,23471.372.28$3,172
Sep 202451,12569.612.36$3,008
Aug 202401,35375.632.06$2,792
Jul 202401,49579.932.15$3,209
Jun 202401,01378.082.63$2,668
May 202401,01678.812.20$2,234
Apr 202401,11284.451.66$1,845
Mar 202401,36180.301.55$2,103
Feb 202401,07276.091.78$1,912
Jan 2024090573.023.30$2,984
Dec 20231131,11171.262.61$10,953
Nov 202301,16377.892.81$3,265
Oct 202301,62285.443.09$5,008
Sep 202301,54589.042.74$4,226
Aug 2023086880.522.67$2,320
Jul 202301,19074.852.64$3,144
Jun 202301,08168.962.26$2,441
May 202301,49770.622.23$3,334
Apr 202301,41478.122.24$3,164
Mar 202301,42372.852.39$3,405
Feb 202301,40175.112.47$3,454
Jan 202301,45276.533.39$4,919
Dec 202201,44376.415.73$8,267
Nov 202201,63585.005.65$9,232
Oct 202201,43787.185.86$8,426
Sep 202201,42184.888.16$11,601
Aug 2022701,90294.529.13$23,976
Jul 20220845101.587.54$6,373
Jun 20220869115.097.98$6,932
May 202201,220109.378.43$10,288
Apr 202201,743104.226.84$11,918
Mar 202201,349108.885.08$6,848
Feb 202201,47491.054.86$7,162
Jan 202201,54981.844.54$7,029
Dec 202101,99571.323.90$7,779
Nov 202101,87277.435.24$9,803
Oct 202102,19379.795.71$12,531
Sep 202102,50669.865.35$13,409
Aug 202102,55566.024.22$10,784
Jul 202102,65170.783.98$10,556
Jun 202101,51269.493.38$5,112
May 202102,89663.483.02$8,739
Apr 202101,27160.362.76$3,506
Mar 202101,21661.302.72$3,304
Feb 202111,07857.805.55$6,038
Jan 202101,47350.412.81$4,140
Dec 2020831,93544.642.68$8,882
Nov 202001,43538.772.71$3,884
Oct 202001,77436.972.48$4,397
Sep 202001,60637.091.99$3,198
Aug 202001,34239.982.39$3,201
Jul 202001,27638.371.83$2,329
Jun 202001,10134.901.69$1,861
May 202001,25316.921.81$2,274
Apr 202001,40714.751.80$2,539
Mar 202001,28730.341.86$2,389
Feb 202001,07149.881.98$2,121
Jan 202001,66457.252.09$3,486
Dec 201902,19659.012.30$5,060
Nov 201901,50955.302.75$4,151
Oct 201901,62853.472.42$3,937
Sep 201901,62555.052.66$4,318
Aug 201901,59353.112.30$3,671
Jul 201901,23556.272.46$3,038
Jun 201901,25852.782.49$3,134
May 201901,69058.482.74$4,631
Apr 201901,43562.632.75$3,947
Mar 201901,19256.803.06$3,650
Feb 201901,32250.852.79$3,691
Jan 2019641,19046.033.23$6,787
Dec 201801,40646.594.19$5,885
Nov 201801,40952.934.24$5,970
Oct 201801,48361.443.40$5,039
Sep 201801,58659.543.11$4,929
Aug 201802,30159.403.07$7,056
Jul 201801,71365.142.93$5,022
Jun 201801,80560.183.08$5,554
May 201801,98365.382.90$5,752
Apr 201832,26263.842.90$6,753
Mar 201801,94661.222.79$5,423
Feb 201801,06561.782.77$2,946
Jan 2018091162.874.01$3,652
Dec 2017511,22157.272.92$6,488
Nov 201702,29055.423.12$7,141
Oct 201711,44649.292.98$4,364
Sep 201701,72347.523.09$5,319
Aug 201701,64145.373.00$4,930
Jul 201701,58843.873.09$4,903
Jun 201701,66342.493.09$5,134
May 201701,96645.373.26$6,416
Apr 201701,72647.933.21$5,543
Mar 201701,75746.772.98$5,242
Feb 201702,06150.452.95$6,085
Jan 2017541,74949.413.42$8,648
Dec 201601,14348.763.72$4,255
Nov 201601,40642.492.64$3,718
Oct 201611,86346.193.09$5,803
Sep 201601,69141.553.10$5,243
Aug 201601,41041.442.92$4,123
Jul 201611,74841.622.92$5,153
Jun 201612,00345.352.69$5,425
May 201602,05142.521.99$4,084
Apr 201601,90936.561.99$3,801
Mar 201611,66733.011.79$3,024
Feb 201601,38226.472.06$2,852
Jan 201611,93227.352.36$4,595
Dec 201501,66332.362.00$3,328
Nov 201501,56338.792.17$3,388
Oct 20151491,34643.552.43$9,755
Sep 201561,09142.992.76$3,267
Aug 201571,68240.162.87$5,113
Jul 201501,54848.152.95$4,559
Jun 201501,41456.152.88$4,076
May 201561,66155.212.96$5,240
Apr 201591,87849.822.71$5,531
Mar 201522,15142.892.93$6,398
Feb 201522,02044.662.98$6,101
Jan 201512,08943.433.10$6,521
Dec 201422,15054.693.59$7,831
Nov 201492,23470.464.25$10,133
Oct 201492,30478.303.90$9,693
Sep 201421,34886.164.05$5,626
Aug 201491,57689.394.04$7,164
Jul 201421,41196.564.18$6,091
Jun 201481,48998.164.74$7,838
May 201401,56594.734.73$7,397
Apr 2014101,72095.944.81$9,231
Mar 20141951,62195.895.06$26,896
Feb 201411,42597.406.19$8,921
Jan 2014199290.404.86$4,912
Dec 2013249291.824.35$2,326
Nov 201311,31088.853.74$4,986
Oct 201391,69897.423.78$7,294
Sep 201311,470104.113.72$5,569
Aug 201351,236104.253.52$4,875
Jul 201301,276102.523.72$4,744
Jun 201361,31994.403.93$5,755
May 201311,19994.834.15$5,070
Apr 201301,65993.964.28$7,105
Mar 201381,61693.623.91$7,072
Feb 201301,50791.233.42$5,154
Jan 201351,25791.603.42$4,757
Dec 201251,40186.773.42$5,225
Nov 201201,61686.953.62$5,858
Oct 201281,54889.383.40$5,978
Sep 201261,68694.672.92$5,488
Aug 201211,71092.662.91$5,066
Jul 201271,49585.133.02$5,112
Jun 201201,56679.822.52$3,945
May 201291,67291.612.49$4,985
Apr 201212,022101.652.00$4,139
Mar 201271,828105.052.22$4,797
Feb 201221,672101.102.57$4,500
Jan 201221,70098.092.73$4,844
Dec 201181,60096.873.24$5,959
Nov 201101,65495.723.31$5,477
Oct 20111721,94184.983.65$21,698
Sep 201151,92483.623.99$8,087
Aug 201111,99483.404.15$8,357
Jul 201112,00294.144.52$9,138
Jun 201111,86992.904.64$8,765
May 201141,93998.134.40$8,933
Apr 201151,957105.964.33$9,010
Mar 201122,05496.364.06$8,527
Feb 201141,82285.644.18$7,958
Jan 201112,16886.504.59$10,035
Dec 201012,30585.734.35$10,107
Nov 20101702,21680.843.80$22,153
Oct 201012,29178.103.51$8,117
Sep 201052,28472.633.98$9,452
Aug 201052,32973.684.42$10,661
Jul 201002,44472.554.74$11,576
Jun 201062,62270.364.91$13,297
May 201002,59171.124.24$10,973
Apr 20101863,43781.694.12$29,364
Mar 201002,52378.394.39$11,073
Feb 201042,04473.585.44$11,419
Jan 201013,70474.365.96$22,165
Dec 200952,74171.445.48$15,388
Nov 200942,69174.593.75$10,394
Oct 20091653,14272.544.11$24,884
Sep 200942,84565.543.06$8,981
Aug 200913,48267.423.22$11,274
Jul 200913,57061.133.46$12,429
Jun 200963,75366.163.90$15,015
May 200913,46954.743.93$13,673
Apr 20091823,55546.773.59$21,266
Mar 200924,09142.144.06$16,690
Feb 200984,17832.814.63$19,619
Jan 200924,69135.865.37$25,267
Dec 200884,83237.105.98$29,178
Nov 20081804,76055.496.86$42,644
Oct 200875,20375.246.92$36,542
Sep 200824,704101.767.88$37,257
Aug 200804,938114.228.48$41,889
Jul 200865,203131.0811.39$60,046
Jun 20081805,180131.3313.03$91,148
May 200865,313123.1711.57$62,233
Apr 200815,314110.3110.45$55,667
Mar 20081835,676101.909.66$73,501
Feb 200875,53292.538.77$49,167
Jan 200825,82390.388.21$47,963
Dec 200715,95588.337.30$43,572
Nov 20071755,78291.677.29$58,203
Oct 200716,27682.856.92$43,525
Sep 200716,30475.846.24$39,439
Aug 20071856,64869.066.39$55,243
Jul 200717,13870.906.39$45,668
Jun 20071837,07462.007.55$64,744
May 200727,91058.747.85$62,182
Apr 20071927,82259.617.81$72,497
Mar 200717,98756.927.30$58,378
Feb 200718,15155.108.22$67,024
Jan 20071959,33850.306.73$72,624
Dec 20061939,41556.656.92$76,071
Nov 2006811,67354.207.62$89,352
Oct 20061913,73554.906.01$32,947
Sep 2006310,47860.085.04$52,960
Aug 200618211,77568.717.34$98,933
Jul 2006312,12169.376.34$77,089
Jun 20061848,99066.286.38$69,587
May 200617612,28866.016.42$90,568
Apr 200616313,99664.397.36$113,513
Mar 200619117,24656.707.08$132,982
Feb 200620220,04257.597.75$166,981
Jan 200623229,23360.598.93$275,205
Dec 2005303,18754.9413.42$44,403

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,753 Mcf  × $  3.05 =     $5,339

────────────────────────────────────────────────────
Month total                                   $5,339

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/217832 is the state's own key, not one this site invented.