BENTON "T"

Operated by SYDRI OPERATING, LLC (P-5 833597) in the MINDEN (COTTON VALLEY CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 221176District 06Field 617921112 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.9 M
Apr 2006 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
242
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 456 leases and 456 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2018-03-20.

The Commission's schedule remark for this field reads: EXCEPTION TO SWR51(A) 30 DAY RULE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-11-20169016
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5,159 bbl$369,824
GasProduction605,185 Mcf$3,519,231
Total$3,889,056

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1127, -94.8273. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.11269, -94.82734 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,910 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,910 ft.

Completions filed
Apr 2006
1 of 1 wells

1 well

42-401338442310,910 ftApr 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (242)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

242 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20253062.743.08$188
Aug 20255063.933.01$320
Jul 20255066.743.32$334
Jun 20255066.483.13$332
May 20255060.553.23$303
Apr 20250062.363.54$0
Mar 20255067.704.27$339
Feb 20255070.884.34$354
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 2024025769.612.36$608
Aug 2024041175.632.06$848
Jul 2024042479.932.15$910
Jun 2024039678.082.63$1,043
May 2024028278.812.20$620
Apr 2024033084.451.66$548
Mar 20240080.301.55$0
Feb 2024060176.091.78$1,072
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 202103679.795.71$206
Sep 202103369.865.35$177
Aug 202105366.024.22$224
Jul 20210070.783.98$0
Jun 202104669.493.38$156
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200136.972.48$2
Sep 202003537.091.99$70
Aug 2020024739.982.39$589
Jul 2020045738.371.83$834
Jun 2020049834.901.69$842
May 2020048716.921.81$884
Apr 2020043914.751.80$792
Mar 2020056430.341.86$1,047
Feb 2020055049.881.98$1,089
Jan 2020055757.252.09$1,167
Dec 2019050859.012.30$1,171
Nov 2019053855.302.75$1,480
Oct 2019063053.472.42$1,524
Sep 2019049755.052.66$1,321
Aug 2019052253.112.30$1,203
Jul 2019051556.272.46$1,267
Jun 2019055752.782.49$1,388
May 2019065858.482.74$1,803
Apr 2019065462.632.75$1,799
Mar 2019070956.803.06$2,171
Feb 2019065150.852.79$1,818
Jan 2019071046.033.23$2,292
Dec 2018083346.594.19$3,486
Nov 2018067052.934.24$2,839
Oct 2018067761.443.40$2,301
Sep 2018066959.543.11$2,079
Aug 2018071359.403.07$2,186
Jul 2018070965.142.93$2,079
Jun 2018066560.183.08$2,046
May 2018073965.382.90$2,144
Apr 2018087263.842.90$2,530
Mar 2018089261.222.79$2,486
Feb 2018070661.782.77$1,953
Jan 2018074162.874.01$2,971
Dec 2017079057.272.92$2,308
Nov 201701,35555.423.12$4,225
Oct 201701,00949.292.98$3,011
Sep 201701,04847.523.09$3,235
Aug 201701,02345.373.00$3,074
Jul 2017078843.873.09$2,433
Jun 2017084742.493.09$2,615
May 2017081945.373.26$2,673
Apr 2017080247.933.21$2,576
Mar 201701,04146.772.98$3,106
Feb 2017095650.452.95$2,823
Jan 2017099749.413.42$3,409
Dec 2016090748.763.72$3,377
Nov 201601,08942.492.64$2,880
Oct 201601,24146.193.09$3,835
Sep 2016097541.553.10$3,023
Aug 2016092341.442.92$2,699
Jul 2016096641.622.92$2,825
Jun 201601,01345.352.69$2,721
May 201601,03642.521.99$2,063
Apr 201621,27336.561.99$2,608
Mar 2016471,12433.011.79$3,568
Feb 201601,28126.472.06$2,644
Jan 201601,06027.352.36$2,506
Dec 201501,14832.362.00$2,298
Nov 201501,17738.792.17$2,551
Oct 201501,17343.552.43$2,846
Sep 201561,21642.992.76$3,612
Aug 201561,43540.162.87$4,363
Jul 201501,79048.152.95$5,272
Jun 201501,59156.152.88$4,587
May 201541,25555.212.96$3,930
Apr 201561,59649.822.71$4,619
Mar 201501,95642.892.93$5,740
Feb 201501,21244.662.98$3,607
Jan 201501,32843.433.10$4,118
Dec 201412,24654.693.59$8,121
Nov 2014771,89170.464.25$13,466
Oct 201461,57278.303.90$6,602
Sep 2014101,27886.164.05$6,032
Aug 2014102,25589.394.04$9,993
Jul 201401,38596.564.18$5,789
Jun 201471,39798.164.74$7,305
May 201401,85594.734.73$8,768
Apr 20141691,75595.944.81$24,654
Mar 201401,74395.895.06$8,814
Feb 201401,63197.406.19$10,099
Jan 201401,81690.404.86$8,827
Dec 201381,76891.824.35$8,433
Nov 201301,90188.853.74$7,106
Oct 201381,82397.423.78$7,669
Sep 201311,741104.113.72$6,577
Aug 201382,117104.253.52$8,291
Jul 201301,845102.523.72$6,859
Jun 2013102,29994.403.93$9,987
May 201301,76494.834.15$7,319
Apr 201302,79793.964.28$11,978
Mar 201361,57793.623.91$6,732
Feb 201301,98891.233.42$6,799
Jan 201371,86491.603.42$7,016
Dec 201282,29986.773.42$8,557
Nov 201202,02286.953.62$7,330
Oct 2012102,02489.383.40$7,775
Sep 201271,97194.672.92$6,415
Aug 20121682,22592.662.91$22,038
Jul 201282,38685.133.02$7,889
Jun 201202,36579.822.52$5,958
May 201281,90591.612.49$5,473
Apr 201202,075101.652.00$4,143
Mar 201262,126105.052.22$5,354
Feb 201212,102101.102.57$5,504
Jan 201201,84498.092.73$5,042
Dec 201182,24196.873.24$8,035
Nov 201102,46695.723.31$8,166
Oct 20111802,02284.983.65$22,674
Sep 201172,48183.623.99$10,474
Aug 201102,22583.404.15$9,232
Jul 201102,25594.144.52$10,186
Jun 201102,60792.904.64$12,096
May 201162,74698.134.40$12,684
Apr 201152,590105.964.33$11,753
Mar 201112,60396.364.06$10,658
Feb 201141,74185.644.18$7,620
Jan 201102,79386.504.59$12,816
Dec 201002,86985.734.35$12,474
Nov 20101272,94680.843.80$21,448
Oct 201002,78278.103.51$9,762
Sep 201072,81372.633.98$11,703
Aug 201062,97873.684.42$13,603
Jul 20101803,09572.554.74$27,718
Jun 201062,82770.364.91$14,304
May 201003,24171.124.24$13,726
Apr 201042,14181.694.12$9,153
Mar 201003,19078.394.39$14,000
Feb 201052,93473.585.44$16,336
Jan 201004,97074.365.96$29,642
Dec 20091213,94971.445.48$30,300
Nov 200964,47774.593.75$17,243
Oct 2009563,86472.544.11$19,944
Sep 200964,13765.543.06$13,072
Aug 200904,54667.423.22$14,631
Jul 20091944,52961.133.46$27,550
Jun 200974,40166.163.90$17,605
May 200914,42654.743.93$17,430
Apr 200974,44746.773.59$16,281
Mar 200904,12842.144.06$16,756
Feb 200964,12032.814.63$19,285
Jan 20091724,69135.865.37$31,363
Dec 200865,40437.105.98$32,523
Nov 200805,47655.496.86$37,567
Oct 200865,59475.246.92$39,173
Sep 20081675,472101.767.88$60,097
Aug 200805,915114.228.48$50,177
Jul 200856,270131.0811.39$72,067
Jun 200806,352131.3313.03$82,783
May 20081806,208123.1711.57$94,024
Apr 200806,239110.3110.45$65,228
Mar 200856,418101.909.66$62,534
Feb 20081946,49492.538.77$74,907
Jan 200807,31290.388.21$60,000
Dec 20071807,41088.337.30$70,007
Nov 200757,41091.677.29$54,490
Oct 200708,39182.856.92$58,082
Sep 20071688,09675.846.24$63,294
Aug 200708,95069.066.39$57,172
Jul 200709,57170.906.39$61,139
Jun 20071729,57362.007.55$82,925
May 2007010,69658.747.85$83,924
Apr 200718310,86659.617.81$95,720
Mar 200718811,36856.927.30$93,710
Feb 2007010,77255.108.22$88,503
Jan 200719612,08450.306.73$91,146
Dec 200617613,82656.656.92$105,625
Nov 200618415,01454.207.62$124,342
Oct 20061115,96254.906.01$96,596
Sep 200638818,42660.085.04$116,126
Aug 200618220,48868.717.34$162,886
Jul 200620025,29769.376.34$174,327
Jun 200619514,66666.286.38$106,551
May 200639826,05966.016.42$193,701
Apr 2006016,20464.397.36$119,269

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2025 — as filed, then multipliedworked
Condensate             3 bbl  × $ 62.74 =       $188
Gas                    0 Mcf  × $  3.08 =         $0

────────────────────────────────────────────────────
Month total                                     $188

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/221176 is the state's own key, not one this site invented.