GULLEY GAS UNIT NO. 1

Operated by BROOKSTON ENERGY, INC. (P-5 97353) in the CARTHAGE, NORTH (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 222520District 06Field 160342502 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.2 M
Apr 2006 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
242
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 568 leases and 570 wells, and the rule below applies to all of them.

Discovered
1981-11-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2010-12-14.

The Commission's schedule remark for this field reads: EFFECTIVE AUGUST.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-01-26172063
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,402 bbl$261,026
GasProduction521,222 Mcf$2,964,920
Total$3,225,945

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4903, -94.2255. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.49029, -94.22549 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,781 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,781 ft.

Completions filed
Mar 2007
1 of 1 wells

1 well

42-20333524511,781 ftMar 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (242)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

242 months

May 202601106.413.05$3
Apr 20260198.932.87$3
Mar 20260089.753.15$0
Feb 202601563.503.75$56
Jan 202606759.138.00$536
Dec 202502856.664.41$124
Nov 202503958.593.93$153
Oct 202507859.383.30$258
Sep 202504662.743.08$142
Aug 202504563.933.01$136
Jul 202505466.743.32$179
Jun 202513566.483.13$176
May 2025123960.553.23$853
Apr 202506362.363.54$223
Mar 202503667.704.27$154
Feb 202507570.884.34$326
Jan 202504974.324.28$210
Dec 202405568.993.12$172
Nov 202404669.052.20$101
Oct 202404471.372.28$100
Sep 202402569.612.36$59
Aug 202403375.632.06$68
Jul 202404279.932.15$90
Jun 202401178.082.63$29
May 20240578.812.20$11
Apr 202401084.451.66$17
Mar 202402980.301.55$45
Feb 202401676.091.78$29
Jan 202402973.023.30$96
Dec 202303671.262.61$94
Nov 202305777.892.81$160
Oct 202301985.443.09$59
Sep 202302389.042.74$63
Aug 202301280.522.67$32
Jul 20230874.852.64$21
Jun 20230668.962.26$14
May 20230570.622.23$11
Apr 20230278.122.24$4
Mar 202302572.852.39$60
Feb 202301675.112.47$39
Jan 202331876.533.39$291
Dec 202223476.415.73$348
Nov 202258085.005.65$877
Oct 2022022087.185.86$1,290
Sep 2022185184.888.16$7,032
Aug 202212894.529.13$350
Jul 2022012101.587.54$91
Jun 202209115.097.98$72
May 202207109.378.43$59
Apr 202203104.226.84$21
Mar 202289108.885.08$917
Feb 20220191.054.86$5
Jan 20220381.844.54$14
Dec 20210571.323.90$20
Nov 20210677.435.24$31
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210170.783.98$4
Jun 20210069.493.38$0
May 20210163.483.02$3
Apr 20210160.362.76$3
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20203932838.772.71$2,400
Oct 2020047336.972.48$1,172
Sep 2020033337.091.99$663
Aug 2020029339.982.39$699
Jul 2020039138.371.83$714
Jun 2020027934.901.69$472
May 2020027216.921.81$494
Apr 2020029114.751.80$525
Mar 2020026730.341.86$496
Feb 2020045949.881.98$909
Jan 2020027457.252.09$574
Dec 20192232359.012.30$2,043
Nov 2019048855.302.75$1,342
Oct 2019044453.472.42$1,074
Sep 2019046555.052.66$1,236
Aug 2019023953.112.30$551
Jul 2019023756.272.46$583
Jun 2019019252.782.49$478
May 2019027958.482.74$765
Apr 2019040562.632.75$1,114
Mar 2019037056.803.06$1,133
Feb 2019029550.852.79$824
Jan 2019038346.033.23$1,236
Dec 2018145546.594.19$1,951
Nov 2018041052.934.24$1,737
Oct 20181252161.443.40$2,508
Sep 2018047359.543.11$1,470
Aug 2018057759.403.07$1,769
Jul 2018062365.142.93$1,827
Jun 2018062960.183.08$1,935
May 2018064865.382.90$1,880
Apr 2018057463.842.90$1,665
Mar 2018073861.222.79$2,057
Feb 2018069061.782.77$1,909
Jan 2018073762.874.01$2,955
Dec 2017082957.272.92$2,422
Nov 2017072555.423.12$2,261
Oct 2017058049.292.98$1,731
Sep 2017086447.523.09$2,667
Aug 2017111,00645.373.00$3,522
Jul 201702,89743.873.09$8,944
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 2017036650.452.95$1,081
Jan 2017088549.413.42$3,026
Dec 2016070648.763.72$2,628
Nov 2016075542.492.64$1,996
Oct 2016285046.193.09$2,719
Sep 2016079541.553.10$2,465
Aug 2016084841.442.92$2,480
Jul 2016093041.622.92$2,720
Jun 2016094645.352.69$2,541
May 2016098442.521.99$1,959
Apr 201601,00236.561.99$1,995
Mar 201601,06133.011.79$1,903
Feb 2016141,02926.472.06$2,494
Jan 201601,15627.352.36$2,733
Dec 201501,21932.362.00$2,440
Nov 201501,43938.792.17$3,119
Oct 201511,94443.552.43$4,761
Sep 2015133,67242.992.76$10,688
Aug 201501,52340.162.87$4,375
Jul 201501,40048.152.95$4,123
Jun 201591,08056.152.88$3,619
May 2015131,25955.212.96$4,439
Apr 201501,40249.822.71$3,795
Mar 2015371,38942.892.93$5,663
Feb 2015191,91644.662.98$6,551
Jan 201502,07243.433.10$6,425
Dec 2014131,85354.693.59$7,366
Nov 201461,62570.464.25$7,332
Oct 201471,64478.303.90$6,961
Sep 201471,64286.164.05$7,246
Aug 2014151,70389.394.04$8,213
Jul 2014151,70596.564.18$8,575
Jun 2014291,59198.164.74$10,383
May 2014121,63394.734.73$8,855
Apr 201401,67695.944.81$8,060
Mar 2014451,80695.895.06$13,448
Feb 201441,44197.406.19$9,312
Jan 2014271,64290.404.86$10,422
Dec 2013271,83291.824.35$10,457
Nov 2013241,86588.853.74$9,104
Oct 201312,24097.423.78$8,563
Sep 2013212,071104.113.72$9,886
Aug 201301,962104.253.52$6,911
Jul 201302,080102.523.72$7,733
Jun 2013441,80094.403.93$11,234
May 2013392,09994.834.15$12,407
Apr 201311,99693.964.28$8,642
Mar 2013892,06093.623.91$16,393
Feb 2013471,80991.233.42$10,474
Jan 201342,15691.603.42$7,740
Dec 2012832,17086.773.42$14,624
Nov 201242,13486.953.62$8,083
Oct 201222,27889.383.40$7,923
Sep 2012342,19294.672.92$9,616
Aug 2012172,25692.662.91$8,136
Jul 201212,29285.133.02$7,009
Jun 2012182,25579.822.52$7,117
May 2012222,32691.612.49$7,803
Apr 201212,126101.652.00$4,347
Mar 2012282,147105.052.22$7,712
Feb 2012292,076101.102.57$8,268
Jan 2012232,24298.092.73$8,386
Dec 2011142,46696.873.24$9,345
Nov 2011292,49795.723.31$11,044
Oct 2011302,51784.983.65$11,733
Sep 201102,27683.623.99$9,072
Aug 2011292,49583.404.15$12,771
Jul 2011252,51794.144.52$13,723
Jun 2011142,51092.904.64$12,947
May 201102,64998.134.40$11,668
Apr 2011182,643105.964.33$13,360
Mar 2011182,71596.364.06$12,750
Feb 2011332,67285.644.18$13,995
Jan 2011213,28986.504.59$16,909
Dec 2010422,82585.734.35$15,883
Nov 2010332,88280.843.80$13,606
Oct 2010413,05478.103.51$13,918
Sep 2010222,83672.633.98$12,884
Aug 2010243,06773.684.42$15,323
Jul 201013,10972.554.74$14,798
Jun 2010303,13770.364.91$17,515
May 201013,35171.124.24$14,263
Apr 201013,15081.694.12$13,068
Mar 201033,79078.394.39$16,868
Feb 2010123,19473.585.44$18,266
Jan 201073,19574.365.96$19,576
Dec 200953,02371.445.48$16,935
Nov 200922,64774.593.75$10,079
Oct 200942,87372.544.11$12,099
Sep 200924,08065.543.06$12,635
Aug 200994,58367.423.22$15,357
Jul 2009174,47561.133.46$16,543
Jun 2009194,27766.163.90$17,916
May 2009204,52354.743.93$18,851
Apr 2009584,49546.773.59$18,838
Mar 2009234,83942.144.06$20,611
Feb 2009394,41932.814.63$21,753
Jan 2009394,95435.865.37$28,006
Dec 2008335,17337.105.98$32,144
Nov 2008354,97655.496.86$36,079
Oct 2008465,43575.246.92$41,082
Sep 2008305,002101.767.88$42,454
Aug 2008325,571114.228.48$50,914
Jul 2008506,109131.0811.39$76,132
Jun 2008465,623131.3313.03$79,324
May 2008545,953123.1711.57$75,553
Apr 2008376,330110.3110.45$70,261
Mar 2008506,501101.909.66$67,921
Feb 2008496,32292.538.77$59,982
Jan 2008547,63090.388.21$67,490
Dec 2007607,66188.337.30$61,240
Nov 2007698,30491.677.29$66,876
Oct 20079314,31982.856.92$106,821
Sep 20074412,10075.846.24$78,891
Aug 20074314,64069.066.39$96,489
Jul 200715611,06270.906.39$81,724
Jun 20075410,60162.007.55$83,369
May 200713910,96658.747.85$94,207
Apr 200712213,20559.617.81$110,340
Mar 2007878,45456.927.30$66,683
Feb 2007599,62755.108.22$82,346
Jan 20074111,44750.306.73$79,065
Dec 20067414,77256.656.92$106,391
Nov 20067315,90954.207.62$125,143
Oct 20066121,79054.906.01$134,390
Sep 20065919,77260.085.04$103,140
Aug 20061168.717.34$76
Jul 2006162069.376.34$4,002
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    1 Mcf  × $  3.05 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/222520 is the state's own key, not one this site invented.