GULLEY GAS UNIT NO. 1

Operated by BROOKSTON ENERGY, INC. (P-5 97353) in the CARTHAGE, NORTH (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235476District 06Field 160342502 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
Dec 2007 – May 2026
Value, last 12 filed months
$292
at the published price for each month
Months reported
222
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 568 leases and 570 wells, and the rule below applies to all of them.

Discovered
1981-11-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2010-12-14.

The Commission's schedule remark for this field reads: EFFECTIVE AUGUST.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-10-22186484
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition875 bbl$73,608
GasProduction219,754 Mcf$1,255,097
Total$1,328,706

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4930, -94.2305. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.49299, -94.23055 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,108 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,108 ft.

Completions filed
Dec 2007
1 of 1 wells

1 well

42-203340651510,108 ftDec 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (222)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

222 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 202509562.743.08$292
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20191059.012.30$59
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 201901558.482.74$41
Apr 201905662.632.75$154
Mar 201906756.803.06$205
Feb 201905250.852.79$145
Jan 2019023646.033.23$762
Dec 2018024046.594.19$1,005
Nov 2018023052.934.24$975
Oct 2018124161.443.40$880
Sep 2018024959.543.11$774
Aug 2018027059.403.07$828
Jul 2018028465.142.93$833
Jun 2018028260.183.08$868
May 2018031265.382.90$905
Apr 2018027263.842.90$789
Mar 2018031861.222.79$886
Feb 2018028961.782.77$799
Jan 2018034862.874.01$1,395
Dec 2017036357.272.92$1,061
Nov 2017036055.423.12$1,123
Oct 2017033349.292.98$994
Sep 2017036147.523.09$1,115
Aug 2017038045.373.00$1,142
Jul 2017038743.873.09$1,195
Jun 2017037242.493.09$1,148
May 2017024745.373.26$806
Apr 2017028147.933.21$902
Mar 2017025346.772.98$755
Feb 2017028950.452.95$853
Jan 2017055549.413.42$1,897
Dec 2016022148.763.72$823
Nov 2016045042.492.64$1,190
Oct 2016147446.193.09$1,511
Sep 2016047341.553.10$1,467
Aug 2016050141.442.92$1,465
Jul 2016047441.622.92$1,386
Jun 2016046645.352.69$1,252
May 2016052042.521.99$1,035
Apr 2016057036.561.99$1,135
Mar 2016064333.011.79$1,154
Feb 2016254926.472.06$1,186
Jan 2016078327.352.36$1,851
Dec 2015082032.362.00$1,641
Nov 2015091138.792.17$1,974
Oct 201511,38243.552.43$3,397
Sep 201511,07642.992.76$3,011
Aug 2015079840.162.87$2,292
Jul 2015091048.152.95$2,680
Jun 2015094156.152.88$2,713
May 2015282155.212.96$2,537
Apr 2015097649.822.71$2,642
Mar 2015875442.892.93$2,556
Feb 2015665644.662.98$2,220
Jan 2015097643.433.10$3,026
Dec 2014897854.693.59$3,950
Nov 20141296970.464.25$4,966
Oct 20141395878.303.90$4,755
Sep 2014121,28586.164.05$6,232
Aug 201491,28689.394.04$5,994
Jul 201441,28496.564.18$5,753
Jun 2014101,25898.164.74$6,941
May 201471,61594.734.73$8,297
Apr 201401,63595.944.81$7,863
Mar 201441,47195.895.06$7,822
Feb 201411,24297.406.19$7,788
Jan 2014071990.404.86$3,495
Dec 2013198391.824.35$4,372
Nov 201301,01088.853.74$3,776
Oct 2013051897.423.78$1,958
Sep 20130950104.113.72$3,532
Aug 20130954104.253.52$3,361
Jul 20130988102.523.72$3,673
Jun 2013084794.403.93$3,332
May 2013097794.834.15$4,054
Apr 201301,02693.964.28$4,394
Mar 201301,07293.623.91$4,195
Feb 2013099391.233.42$3,396
Jan 201301,08091.603.42$3,694
Dec 201201,15986.773.42$3,964
Nov 201201,13886.953.62$4,125
Oct 201201,14589.383.40$3,893
Sep 2012098594.672.92$2,875
Aug 201201,35592.662.91$3,941
Jul 201201,15585.133.02$3,489
Jun 2012085179.822.52$2,144
May 201201,23991.612.49$3,083
Apr 201201,364101.652.00$2,724
Mar 201211,452105.052.22$3,332
Feb 201261,207101.102.57$3,709
Jan 201241,49698.092.73$4,483
Dec 201101,49896.873.24$4,853
Nov 201101,21995.723.31$4,036
Oct 201121,39184.983.65$5,245
Sep 201101,41083.623.99$5,620
Aug 201111,20383.404.15$5,075
Jul 201101,47694.144.52$6,667
Jun 201101,46192.904.64$6,779
May 201101,60198.134.40$7,052
Apr 201121,585105.964.33$7,080
Mar 201151,65796.364.06$7,205
Feb 2011111,61985.644.18$7,709
Jan 201192,05786.504.59$10,218
Dec 2010271,67685.734.35$9,602
Nov 2010101,77680.843.80$7,549
Oct 201061,93878.103.51$7,269
Sep 201031,85772.633.98$7,608
Aug 201051,97573.684.42$9,097
Jul 201011,94772.554.74$9,295
Jun 2010152,04770.364.91$11,107
May 2010152,13371.124.24$10,101
Apr 2010102,01681.694.12$9,128
Mar 2010152,21678.394.39$10,901
Feb 2010202,10473.585.44$12,922
Jan 201082,31974.365.96$14,426
Dec 2009101,16071.445.48$7,076
Nov 2009132,74174.593.75$11,253
Oct 2009141,62272.544.11$7,682
Sep 200992,77665.543.06$9,098
Aug 200962,91167.423.22$9,774
Jul 2009122,65061.133.46$9,914
Jun 200992,66766.163.90$10,983
May 2009122,89054.743.93$12,002
Apr 2009322,98146.773.59$12,191
Mar 200973,15842.144.06$13,113
Feb 2009162,77332.814.63$13,372
Jan 2009233,27135.865.37$18,393
Dec 2008243,04237.105.98$19,073
Nov 2008263,29755.496.86$24,061
Oct 2008363,73375.246.92$28,548
Sep 2008223,638101.767.88$30,896
Aug 2008244,201114.228.48$38,378
Jul 2008344,984131.0811.39$61,222
Jun 2008344,910131.3313.03$68,455
May 2008506,040123.1711.57$76,067
Apr 2008326,647110.3110.45$73,023
Mar 2008506,983101.909.66$72,579
Feb 20084310,15892.538.77$93,070
Jan 20083512,56690.388.21$106,277
Dec 2007229,94888.337.30$74,583

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 62.74 =         $0
Gas                   95 Mcf  × $  3.08 =       $292

────────────────────────────────────────────────────
Month total                                     $292

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/235476 is the state's own key, not one this site invented.