BENTON "X"

Operated by SYDRI OPERATING, LLC (P-5 833597) in the MINDEN (COTTON VALLEY CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 224440District 06Field 617921112 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.1 M
Dec 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
234
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 456 leases and 456 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2018-03-20.

The Commission's schedule remark for this field reads: EXCEPTION TO SWR51(A) 30 DAY RULE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-02-16172837
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8,369 bbl$721,122
GasProduction370,758 Mcf$2,390,704
Total$3,111,826

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1172, -94.8434. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.11720, -94.84344 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,975 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,975 ft.

Completions filed
Dec 2006
1 of 1 wells

1 well

42-401340942710,975 ftDec 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (234)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

234 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 2023118768.962.26$491
May 2023024670.622.23$548
Apr 2023025778.122.24$575
Mar 202315725872.852.39$12,055
Feb 2023090375.112.47$2,227
Jan 2023085376.533.39$2,890
Dec 2022901,14076.415.73$13,408
Nov 202201,19985.005.65$6,770
Oct 202201,33187.185.86$7,805
Sep 2022076884.888.16$6,270
Aug 202212665094.529.13$17,842
Jul 20220541101.587.54$4,080
Jun 2022083115.097.98$662
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 2020011816.921.81$214
Apr 2020015914.751.80$287
Mar 2020010430.341.86$193
Feb 2020010049.881.98$198
Jan 2020010357.252.09$216
Dec 2019011059.012.30$253
Nov 2019010055.302.75$275
Oct 201909553.472.42$230
Sep 2019010055.052.66$266
Aug 2019010453.112.30$240
Jul 2019010556.272.46$258
Jun 2019010552.782.49$262
May 201908358.482.74$227
Apr 201909862.632.75$270
Mar 2019011456.803.06$349
Feb 2019010450.852.79$290
Jan 2019011346.033.23$365
Dec 2018015946.594.19$665
Nov 2018011352.934.24$479
Oct 2018012861.443.40$435
Sep 2018014559.543.11$451
Aug 2018016359.403.07$500
Jul 2018016365.142.93$478
Jun 2018014160.183.08$434
May 2018014265.382.90$412
Apr 2018016063.842.90$464
Mar 2018020761.222.79$577
Feb 2018011961.782.77$329
Jan 2018013662.874.01$545
Dec 2017017657.272.92$514
Nov 2017022655.423.12$705
Oct 2017015449.292.98$459
Sep 2017013547.523.09$417
Aug 2017012445.373.00$373
Jul 2017012943.873.09$398
Jun 2017011942.493.09$367
May 2017012445.373.26$405
Apr 2017012047.933.21$385
Mar 201709846.772.98$292
Feb 201708850.452.95$260
Jan 2017015449.413.42$527
Dec 2016014048.763.72$521
Nov 2016014342.492.64$378
Oct 2016014746.193.09$454
Sep 2016013341.553.10$412
Aug 2016014341.442.92$418
Jul 2016015141.622.92$442
Jun 2016013545.352.69$363
May 2016012742.521.99$253
Apr 2016011836.561.99$235
Mar 2016012433.011.79$222
Feb 2016011426.472.06$235
Jan 2016015527.352.36$366
Dec 201514017032.362.00$4,871
Nov 2015017838.792.17$386
Oct 2015054243.552.43$1,315
Sep 2015244042.992.76$1,300
Aug 2015497240.162.87$2,953
Jul 2015084048.152.95$2,474
Jun 201501,45056.152.88$4,180
May 201551,47555.212.96$4,635
Apr 201571,75449.822.71$5,096
Mar 201501,60642.892.93$4,713
Feb 201511,43944.662.98$4,327
Jan 201501,09743.433.10$3,401
Dec 201401,17554.693.59$4,220
Nov 20141521,12770.464.25$15,502
Oct 2014271378.303.90$2,938
Sep 2014472586.164.05$3,278
Aug 2014483689.394.04$3,731
Jul 2014182896.564.18$3,557
Jun 2014485498.164.74$4,438
May 201419192394.734.73$22,456
Apr 2014385495.944.81$4,395
Mar 2014086495.895.06$4,369
Feb 2014083497.406.19$5,164
Jan 2014077490.404.86$3,762
Dec 201316769491.824.35$18,356
Nov 2013087288.853.74$3,260
Oct 201351,11197.423.78$4,686
Sep 20130617104.113.72$2,294
Aug 20133922104.253.52$3,561
Jul 201301,219102.523.72$4,532
Jun 201361,34994.403.93$5,873
May 20131921,32894.834.15$23,717
Apr 201301,39293.964.28$5,961
Mar 2013374693.623.91$3,200
Feb 2013094291.233.42$3,222
Jan 201341,22991.603.42$4,569
Dec 20121941,37586.773.42$21,536
Nov 201201,25486.953.62$4,546
Oct 201261,42289.383.40$5,371
Sep 201251,37694.672.92$4,489
Aug 201211,52192.662.91$4,516
Jul 20121941,46785.133.02$20,947
Jun 201201,49279.822.52$3,758
May 201271,58591.612.49$4,585
Apr 201201,751101.652.00$3,496
Mar 20122011,189105.052.22$23,757
Feb 201211,534101.102.57$4,044
Jan 201201,83198.092.73$5,006
Dec 201151,76496.873.24$6,199
Nov 2011098995.723.31$3,275
Oct 201114580384.983.65$15,252
Sep 201151,59583.623.99$6,775
Aug 201101,76783.404.15$7,332
Jul 20111911,70794.144.52$25,692
Jun 201101,77892.904.64$8,250
May 201141,91598.134.40$8,828
Apr 20111941,919105.964.33$28,872
Mar 201102,04296.364.06$8,285
Feb 2011017685.644.18$736
Jan 201102,38386.504.59$10,935
Dec 201002,14585.734.35$9,326
Nov 20102022,12680.843.80$24,399
Oct 201002,25178.103.51$7,899
Sep 201062,49772.633.98$10,373
Aug 20101932,71873.684.42$26,232
Jul 201002,85572.554.74$13,523
Jun 20101972,59170.364.91$26,584
May 201002,52571.124.24$10,694
Apr 201052,67881.694.12$11,449
Mar 201001,66578.394.39$7,307
Feb 20102043,11673.585.44$31,969
Jan 201003,66074.365.96$21,829
Dec 20092044,32171.445.48$38,269
Nov 200953,71174.593.75$14,295
Oct 2009745,01072.544.11$25,960
Sep 20092054,19565.543.06$26,292
Aug 200905,10467.423.22$16,427
Jul 20091966,20561.133.46$33,479
Jun 200953,05066.163.90$12,211
May 20093904,14254.743.93$37,609
Apr 200953,99946.773.59$14,580
Mar 200906,23542.144.06$25,308
Feb 20092067,44232.814.63$41,238
Jan 20091886,48535.865.37$41,573
Dec 20081995,08637.105.98$37,783
Nov 20081945,12955.496.86$45,952
Oct 20082007,69575.246.92$68,313
Sep 20081967,651101.767.88$80,213
Aug 20081949,189114.228.48$100,109
Jul 200838711,035131.0811.39$176,410
Jun 200837512,132131.3313.03$207,361
May 200841915,163123.1711.57$227,109
Apr 200856717,134110.3110.45$241,679
Mar 200840116,706101.909.66$202,310
Feb 20081621,38392.538.77$27,120
Jan 200804,07090.388.21$33,397
Dec 200704,36588.337.30$31,873
Nov 200734,84791.677.29$35,618
Oct 200705,13282.856.92$35,524
Sep 20071685,47475.846.24$46,922
Aug 200705,91869.066.39$37,804
Jul 200706,34170.906.39$40,506
Jun 200706,35162.007.55$47,940
May 20071767,10158.747.85$66,055
Apr 200746,63859.617.81$52,049
Mar 200706,80456.927.30$49,683
Feb 200716,55355.108.22$53,895
Jan 200768,28550.306.73$56,034
Dec 200657,04056.656.92$48,989

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2023 — as filed, then multipliedworked
Condensate             1 bbl  × $ 68.96 =        $69
Gas                  187 Mcf  × $  2.26 =       $422

────────────────────────────────────────────────────
Month total                                     $491

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/224440 is the state's own key, not one this site invented.