Operated by BROOKSTON ENERGY, INC. (P-5 97353) in the WASKOM (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 227677District 06Field 953691602 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.9 M
Nov 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 473 leases and 477 wells, and the rule below applies to all of them.

Discovered
1955-09-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2012-11-06.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-07-19175775
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,233 bbl$89,011
GasProduction477,468 Mcf$2,780,530
Total$2,869,540

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4474, -94.1800. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.44740, -94.17995 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,829 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,829 ft.

Completions filed
Dec 2006
1 of 1 wells

1 well

42-20333398109,829 ftDec 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 202365076.533.39$4,974
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180165.142.93$3
Jun 2018046160.183.08$1,418
May 2018066365.382.90$1,923
Apr 2018058963.842.90$1,709
Mar 2018061661.222.79$1,717
Feb 2018058561.782.77$1,618
Jan 2018056662.874.01$2,269
Dec 2017065857.272.92$1,922
Nov 2017070455.423.12$2,195
Oct 2017075749.292.98$2,259
Sep 2017078847.523.09$2,433
Aug 2017074345.373.00$2,232
Jul 2017062643.873.09$1,933
Jun 2017096042.493.09$2,964
May 2017085245.373.26$2,780
Apr 2017093547.933.21$3,003
Mar 2017085646.772.98$2,554
Feb 2017063050.452.95$1,860
Jan 2017095749.413.42$3,272
Dec 2016093848.763.72$3,492
Nov 2016079742.492.64$2,108
Oct 2016085546.193.09$2,642
Sep 2016092441.553.10$2,865
Aug 2016085441.442.92$2,497
Jul 2016055241.622.92$1,614
Jun 201601,04745.352.69$2,812
May 201601,00442.521.99$1,999
Apr 201601,10236.561.99$2,194
Mar 201601,09333.011.79$1,961
Feb 201601,18826.472.06$2,452
Jan 201601,33127.352.36$3,147
Dec 201501,04332.362.00$2,087
Nov 2015069138.792.17$1,498
Oct 2015086843.552.43$2,106
Sep 201501,34142.992.76$3,699
Aug 2015089640.162.87$2,574
Jul 201501,02048.152.95$3,004
Jun 201501,67856.152.88$4,837
May 201501,95855.212.96$5,787
Apr 201502,00649.822.71$5,429
Mar 2015061642.892.93$1,808
Feb 201501,38144.662.98$4,110
Jan 201501,86543.433.10$5,783
Dec 2014058254.693.59$2,090
Nov 2014056570.464.25$2,402
Oct 201401,77378.303.90$6,916
Sep 2014046086.164.05$1,861
Aug 201401,15989.394.04$4,677
Jul 201401,28496.564.18$5,367
Jun 2014079598.164.74$3,766
May 201401,99594.734.73$9,429
Apr 201402,08395.944.81$10,017
Mar 201401,99595.895.06$10,088
Feb 201401,97697.406.19$12,235
Jan 201402,59390.404.86$12,604
Dec 201302,44391.824.35$10,638
Nov 201302,54988.853.74$9,529
Oct 201302,53997.423.78$9,596
Sep 201302,617104.113.72$9,729
Aug 201302,450104.253.52$8,630
Jul 20131192,535102.523.72$21,624
Jun 201302,21894.403.93$8,724
May 201302,57394.834.15$10,676
Apr 201302,28893.964.28$9,799
Mar 201302,29793.623.91$8,988
Feb 201301,94191.233.42$6,638
Jan 201302,18291.603.42$7,462
Dec 201201,89486.773.42$6,478
Nov 201201,94486.953.62$7,047
Oct 201202,00789.383.40$6,823
Sep 201201,84694.672.92$5,387
Aug 201202,04592.662.91$5,947
Jul 201202,42985.133.02$7,338
Jun 201202,27579.822.52$5,731
May 201202,68891.612.49$6,689
Apr 201203,014101.652.00$6,018
Mar 201202,317105.052.22$5,149
Feb 201202,232101.102.57$5,737
Jan 201202,42698.092.73$6,633
Dec 201102,50996.873.24$8,129
Nov 201102,60695.723.31$8,629
Oct 201102,63884.983.65$9,625
Sep 201102,45583.623.99$9,785
Aug 201102,52183.404.15$10,460
Jul 201102,79894.144.52$12,639
Jun 201102,76592.904.64$12,829
May 201102,62898.134.40$11,576
Apr 201102,642105.964.33$11,449
Mar 201102,92896.364.06$11,880
Feb 201102,65485.644.18$11,094
Jan 201102,93486.504.59$13,463
Dec 201003,07985.734.35$13,387
Nov 201003,11380.843.80$11,815
Oct 201003,15678.103.51$11,074
Sep 20101603,42772.633.98$25,258
Aug 201003,64373.684.42$16,100
Jul 201003,28272.554.74$15,545
Jun 201003,97170.364.91$19,499
May 201003,97471.124.24$16,831
Apr 201003,99281.694.12$16,458
Mar 201004,03178.394.39$17,691
Feb 201003,23373.585.44$17,595
Jan 201004,02474.365.96$24,000
Dec 200904,29171.445.48$23,531
Nov 200904,11474.593.75$15,434
Oct 200904,32872.544.11$17,789
Sep 200904,45765.543.06$13,660
Aug 200904,53867.423.22$14,606
Jul 200904,32361.133.46$14,977
Jun 200903,89366.163.90$15,163
May 200904,47954.743.93$17,583
Apr 200904,36046.773.59$15,642
Mar 200904,76342.144.06$19,333
Feb 200902,84032.814.63$13,158
Jan 200904,93135.865.37$26,484
Dec 20081325,27637.105.98$36,433
Nov 200805,27255.496.86$36,168
Oct 200805,20575.246.92$36,029
Sep 200805,806101.767.88$45,734
Aug 200806,226114.228.48$52,815
Jul 200806,575131.0811.39$74,886
Jun 200807,050131.3313.03$91,880
May 200807,665123.1711.57$88,717
Apr 200806,889110.3110.45$72,024
Mar 200805,052101.909.66$48,823
Feb 20081874,71792.538.77$58,674
Jan 200806,75990.388.21$55,463
Dec 200705,74788.337.30$41,964
Nov 200707,43191.677.29$54,185
Oct 20071848,20982.856.92$72,067
Sep 200709,39775.846.24$58,676
Aug 200709,30069.066.39$59,408
Jul 2007010,17370.906.39$64,985
Jun 200717711,54762.007.55$98,136
May 2007012,88258.747.85$101,076
Apr 2007413,65759.617.81$106,834
Mar 200718418,69756.927.30$146,998
Feb 2007621,02755.108.22$173,088
Jan 20071536,25550.306.73$244,636
Dec 2006066556.656.92$4,601
Nov 2006066554.207.62$5,066

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2023 — as filed, then multipliedworked
Condensate            65 bbl  × $ 76.53 =     $4,974
Gas                    0 Mcf  × $  3.39 =         $0

────────────────────────────────────────────────────
Month total                                   $4,974

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/227677 is the state's own key, not one this site invented.