WILLIAMS ESTATE

Operated by BROOKSTON ENERGY, INC. (P-5 97353) in the WASKOM (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 232591District 06Field 953691602 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.5 M
Aug 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 473 leases and 477 wells, and the rule below applies to all of them.

Discovered
1955-09-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2012-11-06.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-02-27179414
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,803 bbl$215,731
GasProduction217,735 Mcf$1,258,137
Total$1,473,868

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4471, -94.1847. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.44714, -94.18470 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,875 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,875 ft.

Completions filed
Aug 2007
1 of 1 wells

1 well

42-2033390749,875 ftAug 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20256070.884.34$425
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20245080.301.55$402
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 202311074.852.64$823
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20228084.888.16$679
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202290108.885.08$980
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 202111070.783.98$779
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 202112050.412.81$605
Dec 202006844.642.68$182
Nov 2020011238.772.71$303
Oct 202004636.972.48$114
Sep 202003137.091.99$62
Aug 202009339.982.39$222
Jul 202001738.371.83$31
Jun 202008534.901.69$144
May 202003716.921.81$67
Apr 2020667714.751.80$1,112
Mar 2020010630.341.86$197
Feb 202003349.881.98$65
Jan 202009857.252.09$205
Dec 201991459.012.30$563
Nov 20190455.302.75$11
Oct 201904053.472.42$97
Sep 201904555.052.66$120
Aug 2019010053.112.30$230
Jul 2019019156.272.46$470
Jun 2019027452.782.49$683
May 2019016858.482.74$460
Apr 201904562.632.75$124
Mar 201907156.803.06$217
Feb 201909950.852.79$276
Jan 201908146.033.23$261
Dec 201808546.594.19$356
Nov 201807352.934.24$309
Oct 2018013661.443.40$462
Sep 201806359.543.11$196
Aug 2018087259.403.07$2,674
Jul 201808365.142.93$243
Jun 2018073060.183.08$2,246
May 2018012065.382.90$348
Apr 201809463.842.90$273
Mar 20187119261.222.79$4,882
Feb 2018013561.782.77$373
Jan 2018021062.874.01$842
Dec 201708457.272.92$245
Nov 201709655.423.12$299
Oct 2017017049.292.98$507
Sep 201708547.523.09$262
Aug 2017012645.373.00$379
Jul 2017018043.873.09$556
Jun 20179710642.493.09$4,449
May 201709145.373.26$297
Apr 2017013347.933.21$427
Mar 2017016946.772.98$504
Feb 201705050.452.95$148
Jan 2017012849.413.42$438
Dec 201606048.763.72$223
Nov 2016014742.492.64$389
Oct 2016017146.193.09$528
Sep 2016015441.553.10$478
Aug 2016013541.442.92$395
Jul 2016013241.622.92$386
Jun 2016016745.352.69$449
May 2016017442.521.99$346
Apr 201616548136.561.99$6,990
Mar 2016032633.011.79$585
Feb 2016031326.472.06$646
Jan 2016033027.352.36$780
Dec 2015039332.362.00$787
Nov 2015034338.792.17$743
Oct 2015059143.552.43$1,434
Sep 2015018042.992.76$497
Aug 2015030340.162.87$870
Jul 2015085948.152.95$2,530
Jun 2015057556.152.88$1,658
May 2015061655.212.96$1,821
Apr 2015056249.822.71$1,521
Mar 2015085142.892.93$2,497
Feb 2015018144.662.98$539
Jan 2015030143.433.10$933
Dec 201401,21554.693.59$4,364
Nov 2014075470.464.25$3,206
Oct 2014074278.303.90$2,895
Sep 2014831,05786.164.05$11,427
Aug 201401,14489.394.04$4,616
Jul 201401,12996.564.18$4,719
Jun 2014072698.164.74$3,439
May 2014089394.734.73$4,221
Apr 201401,31595.944.81$6,324
Mar 201401,07495.895.06$5,431
Feb 201401,07497.406.19$6,650
Jan 201418979990.404.86$20,969
Dec 2013055791.824.35$2,425
Nov 2013051588.853.74$1,925
Oct 2013068197.423.78$2,574
Sep 20130599104.113.72$2,227
Aug 201301,179104.253.52$4,153
Jul 201301,044102.523.72$3,881
Jun 201301,00894.403.93$3,965
May 2013072694.834.15$3,012
Apr 2013054593.964.28$2,334
Mar 2013055093.623.91$2,152
Feb 2013066091.233.42$2,257
Jan 2013075091.603.42$2,565
Dec 201215167186.773.42$15,397
Nov 2012058386.953.62$2,113
Oct 2012060789.383.40$2,064
Sep 2012054594.672.92$1,591
Aug 2012070492.662.91$2,047
Jul 2012073485.133.02$2,217
Jun 2012081979.822.52$2,063
May 201201,28591.612.49$3,197
Apr 20120837101.652.00$1,671
Mar 201201,035105.052.22$2,300
Feb 2012178911101.102.57$20,337
Jan 201201,13398.092.73$3,098
Dec 2011064796.873.24$2,096
Nov 2011071795.723.31$2,374
Oct 2011078684.983.65$2,868
Sep 2011085483.623.99$3,404
Aug 201101,49583.404.15$6,203
Jul 201101,16694.144.52$5,267
Jun 201101,45292.904.64$6,737
May 201102,32098.134.40$10,219
Apr 201101,755105.964.33$7,605
Mar 201102,33796.364.06$9,482
Feb 201102,07485.644.18$8,669
Jan 20111752,44186.504.59$26,339
Dec 201002,06085.734.35$8,956
Nov 201002,60080.843.80$9,868
Oct 201002,29778.103.51$8,060
Sep 201002,34772.633.98$9,340
Aug 201002,41373.684.42$10,664
Jul 201001,96672.554.74$9,312
Jun 20101492,72670.364.91$23,869
May 201002,75771.124.24$11,677
Apr 201002,69581.694.12$11,111
Mar 201003,46478.394.39$15,202
Feb 201002,15473.585.44$11,723
Jan 201002,69574.365.96$16,073
Dec 20091773,25571.445.48$30,494
Nov 200902,71674.593.75$10,189
Oct 200903,22172.544.11$13,239
Sep 200903,77665.543.06$11,573
Aug 200902,63067.423.22$8,465
Jul 20091841,32861.133.46$15,849
Jun 200901,65366.163.90$6,438
May 200902,49854.743.93$9,807
Apr 200902,76646.773.59$9,923
Mar 200902,75542.144.06$11,183
Feb 200901,85432.814.63$8,590
Jan 20091883,21735.865.37$24,020
Dec 200803,25137.105.98$19,432
Nov 200803,65455.496.86$25,068
Oct 200803,63475.246.92$25,154
Sep 200803,911101.767.88$30,807
Aug 20081394,289114.228.48$52,260
Jul 200804,847131.0811.39$55,205
Jun 200804,903131.3313.03$63,899
May 200805,777123.1711.57$66,865
Apr 20081805,747110.3110.45$79,940
Mar 200803,165101.909.66$30,587
Feb 200803,73592.538.77$32,758
Jan 20081725,49290.388.21$60,611
Dec 200705,51288.337.30$40,248
Nov 20071906,19991.677.29$62,619
Oct 20071789,61082.856.92$81,268
Sep 2007012,42275.846.24$77,565
Aug 200706,60969.066.39$42,218

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2025 — as filed, then multipliedworked
Condensate             6 bbl  × $ 70.88 =       $425
Gas                    0 Mcf  × $  4.34 =         $0

────────────────────────────────────────────────────
Month total                                     $425

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/232591 is the state's own key, not one this site invented.