DEADY

Operated by BROOKSTON ENERGY, INC. (P-5 97353) in the WOODLAWN, SW. (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 237490District 06Field 985704002 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.1 M
Nov 2007 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
223
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 68 leases and 68 wells, and the rule below applies to all of them.

Discovered
1977-10-20
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2014-11-13.

The Commission's schedule remark for this field reads: ADOPTED, BUT REMAINS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-03-09189889
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,146 bbl$267,856
GasProduction316,121 Mcf$1,831,723
Total$2,099,579

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5337, -94.4917. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.53371, -94.49172 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,634 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,634 ft.

Completions filed
Dec 2007
1 of 1 wells

1 well

42-20334096610,634 ftDec 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (223)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

223 months

May 202603106.413.05$9
Apr 20260298.932.87$6
Mar 20260089.753.15$0
Feb 202601663.503.75$60
Jan 202603259.138.00$256
Dec 202507756.664.41$340
Nov 2025021758.593.93$852
Oct 2025076559.383.30$2,528
Sep 2025034962.743.08$1,074
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 202015037.091.99$556
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 201909858.482.74$269
Apr 2019018062.632.75$495
Mar 2019024056.803.06$735
Feb 2019012350.852.79$343
Jan 2019011646.033.23$374
Dec 2018016446.594.19$686
Nov 2018115452.934.24$705
Oct 2018023161.443.40$785
Sep 2018017159.543.11$531
Aug 2018016559.403.07$506
Jul 2018015265.142.93$446
Jun 2018023060.183.08$708
May 2018025965.382.90$751
Apr 2018023563.842.90$682
Mar 2018026161.222.79$727
Feb 2018022561.782.77$622
Jan 2018031862.874.01$1,275
Dec 2017022657.272.92$660
Nov 2017030055.423.12$936
Oct 2017028049.292.98$835
Sep 2017020647.523.09$636
Aug 2017017445.373.00$523
Jul 2017012843.873.09$395
Jun 2017023742.493.09$732
May 2017033645.373.26$1,097
Apr 2017027847.933.21$893
Mar 2017029946.772.98$892
Feb 2017029050.452.95$856
Jan 2017037649.413.42$1,285
Dec 2016035548.763.72$1,322
Nov 2016027042.492.64$714
Oct 2016028446.193.09$878
Sep 2016326641.553.10$949
Aug 2016028341.442.92$828
Jul 2016035241.622.92$1,029
Jun 2016030945.352.69$830
May 2016035942.521.99$715
Apr 2016035736.561.99$711
Mar 2016045133.011.79$809
Feb 2016043326.472.06$894
Jan 20161550627.352.36$1,607
Dec 2015042432.362.00$849
Nov 2015050538.792.17$1,095
Oct 2015054743.552.43$1,327
Sep 2015010542.992.76$290
Aug 2015021340.162.87$612
Jul 2015081248.152.95$2,391
Jun 20152152156.152.88$2,681
May 2015071955.212.96$2,125
Apr 2015261,23049.822.71$4,624
Mar 201501,20542.892.93$3,536
Feb 2015201,10444.662.98$4,179
Jan 201501,15843.433.10$3,591
Dec 2014431,44554.693.59$7,541
Nov 2014090870.464.25$3,861
Oct 201401,04978.303.90$4,092
Sep 2014581,18086.164.05$9,771
Aug 201401,40289.394.04$5,657
Jul 201401,48696.564.18$6,211
Jun 2014561,48698.164.74$12,536
May 201401,33294.734.73$6,296
Apr 201401,54795.944.81$7,440
Mar 20145596595.895.06$10,154
Feb 201421,28497.406.19$8,145
Jan 201401,43890.404.86$6,990
Dec 2013361,37891.824.35$9,306
Nov 201321,40588.853.74$5,430
Oct 201311,59197.423.78$6,110
Sep 2013331,356104.113.72$8,477
Aug 201311,059104.253.52$3,835
Jul 201311,429102.523.72$5,415
Jun 201311,61294.403.93$6,435
May 2013541,61994.834.15$11,838
Apr 201311,47093.964.28$6,389
Mar 20131031,75993.623.91$16,526
Feb 201341,70191.233.42$6,182
Jan 201372,10291.603.42$7,830
Dec 2012422,09286.773.42$10,799
Nov 20121353,05286.953.62$22,802
Oct 201293,12189.383.40$11,415
Sep 201253,01394.672.92$9,266
Aug 2012123,34392.662.91$10,834
Jul 2012513,66085.133.02$15,398
Jun 201273,71079.822.52$9,904
May 201221,47791.612.49$3,858
Apr 20120227101.652.00$453
Mar 20120294105.052.22$653
Feb 20120376101.102.57$966
Jan 2012036398.092.73$992
Dec 20110196.873.24$3
Nov 2011931295.723.31$1,895
Oct 2011058884.983.65$2,145
Sep 2011061283.623.99$2,439
Aug 20111065783.404.15$3,560
Jul 2011083394.144.52$3,763
Jun 201101,33992.904.64$6,213
May 201101,43298.134.40$6,308
Apr 2011671,273105.964.33$12,616
Mar 2011912,58196.364.06$19,241
Feb 201101,66585.644.18$6,960
Jan 201113,54186.504.59$16,335
Dec 2010423,38785.734.35$18,326
Nov 20101173,43280.843.80$22,484
Oct 201003,62178.103.51$12,706
Sep 20102163,57372.633.98$29,907
Aug 201003,78973.684.42$16,745
Jul 201003,81172.554.74$18,051
Jun 2010913,76470.364.91$24,886
May 2010774,02271.124.24$22,510
Apr 201003,38281.694.12$13,943
Mar 20101284,15378.394.39$28,260
Feb 201013,95573.585.44$21,598
Jan 201004,30474.365.96$25,669
Dec 20091144,17671.445.48$31,044
Nov 200904,16274.593.75$15,614
Oct 200905,02772.544.11$20,662
Sep 20091044,56065.543.06$20,791
Aug 200905,03567.423.22$16,205
Jul 2009535,12561.133.46$20,995
Jun 200905,08166.163.90$19,791
May 20091065,33254.743.93$26,735
Apr 2009505,32646.773.59$21,446
Mar 2009525,56342.144.06$24,772
Feb 200904,21232.814.63$19,514
Jan 2009895,30835.865.37$31,701
Dec 200815,65437.105.98$33,832
Nov 200805,66755.496.86$38,878
Oct 2008496,01075.246.92$45,288
Sep 2008476,295101.767.88$54,369
Aug 2008536,841114.228.48$64,086
Jul 20081207,133131.0811.39$96,970
Jun 2008516,303131.3313.03$88,843
May 20081547,471123.1711.57$105,440
Apr 20082029,147110.3110.45$117,913
Mar 2008713,092101.909.66$127,235
Feb 20083814,67892.538.77$132,251
Jan 20088013,82990.388.21$120,707
Dec 200710413,87888.337.30$110,523
Nov 200701,77791.677.29$12,957

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    3 Mcf  × $  3.05 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/237490 is the state's own key, not one this site invented.