KING, J. S.

Operated by KALOS CORPORATION (P-5 450450) in the MOONROCK (RODESSA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 11513District 06Field 62709600OilCasinghead gasSaveExport
Value, all time
$435 k
Jan 1993 – Aug 2006
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
164
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 12 leases and 21 wells, and the rule below applies to all of them.

Discovered
1984-09-24
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition15,159 bbl$323,756
Casinghead gasProduction61,852 Mcf$110,765
Total$434,521

33,439 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.3887, -94.9605. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.38868, -94.96054 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,450 ft
1 wells filed one
Completion to plug
34.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,450 ft.

Completions filed
Sep 1984
1 of 1 wells
Plug dates filed
Aug 2019
1 of 1 wells

Last completion to plug: a median of 34.9 years across the 1 well that filed both dates, with the middle half between 34.9 years and 34.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1833063218,450 ftSep 1984Aug 2019Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (164)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

164 months

Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20061213166.016.42$8,186
Apr 200603064.397.36$221
Mar 200603156.707.08$220
Feb 200602857.597.75$217
Jan 200603160.598.93$277
Dec 200503154.9413.42$416
Nov 200503054.6910.59$318
Oct 200503158.3413.80$428
Sep 200503061.4512.08$362
Aug 200503161.519.80$304
Jul 200503155.697.84$243
Jun 200503052.337.38$221
May 200503145.226.65$206
Apr 200503049.207.36$221
Mar 200503150.377.15$222
Feb 200502845.226.31$177
Jan 200518216643.166.32$8,905
Dec 200403139.866.75$209
Nov 200406245.286.33$392
Oct 200403149.706.52$202
Sep 200403043.245.28$159
Aug 200403142.375.55$172
Jul 2004015138.286.08$919
Jun 2004043136.106.43$2,773
May 200418149137.486.49$9,973
Apr 2004047634.475.86$2,789
Mar 200417841634.365.53$8,417
Feb 2004036332.455.51$2,000
Jan 200418116132.036.30$6,812
Dec 20031849230.266.30$6,148
Nov 2003233428.804.60$1,592
Oct 200317939028.174.76$6,899
Sep 2003034326.314.75$1,629
Aug 200317636829.765.13$7,126
Jul 200317744029.415.17$7,481
Jun 2003059628.565.98$3,566
May 200317252126.595.97$7,685
Apr 200303026.675.41$162
Mar 2003027931.146.10$1,701
Feb 200308633.487.93$682
Jan 200317746430.315.58$7,955
Dec 2002046026.914.85$2,233
Nov 200218342424.664.14$6,267
Oct 200217944226.464.23$6,606
Sep 200218329727.443.64$6,101
Aug 200217931725.963.16$5,650
Jul 200217716424.583.06$4,853
Jun 2002163723.733.34$2,150
May 200205124.663.58$183
Apr 200209423.653.51$330
Mar 200216629722.003.10$4,574
Feb 200217733118.222.38$4,011
Jan 2002129817.172.38$725
Dec 200117839316.932.36$3,943
Nov 200117957318.072.41$4,613
Oct 2001031819.782.53$804
Sep 2001011924.262.25$268
Aug 200117519524.873.05$4,948
Jul 2001020823.933.20$665
Jun 200117524124.563.82$5,220
May 2001033425.524.31$1,439
Apr 2001039224.685.34$2,091
Mar 200117731024.545.38$6,010
Feb 200117728627.755.77$6,561
Jan 2001030027.478.40$2,520
Dec 200018523926.889.12$7,153
Nov 200017224632.215.66$6,932
Oct 2000028331.235.15$1,456
Sep 200018431031.875.19$7,472
Aug 200017731229.644.54$6,663
Jul 2000037628.534.09$1,538
Jun 200035235029.304.40$11,853
May 2000031727.263.68$1,166
Apr 200017033224.513.12$5,201
Mar 200018234528.422.86$6,159
Feb 2000033327.622.73$908
Jan 200018031225.272.48$5,323
Dec 199917934924.282.42$5,192
Nov 199918136623.192.43$5,088
Oct 199918339820.982.80$4,955
Sep 199917838821.752.62$4,888
Aug 199917736619.262.88$4,461
Jul 199917937117.892.37$4,082
Jun 199918138115.942.36$3,785
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 199904112.471.84$75
Feb 199901769.981.82$320
Jan 199917727410.381.90$2,358
Dec 19981748209.201.77$3,055
Nov 199817976010.892.19$3,610
Oct 19980412.421.97$8
Sep 19980512.592.08$10
Aug 199805611.301.91$107
Jul 199817141811.742.24$2,943
Jun 199817348411.242.24$3,027
May 1998037312.622.21$823
Apr 199817414313.042.51$2,627
Mar 1998029412.802.31$679
Feb 19980113.952.30$2
Jan 19980114.702.15$2
Dec 1997019416.322.41$468
Nov 199717729818.193.09$4,140
Oct 1997024819.253.15$781
Sep 1997020317.742.95$600
Aug 199717629917.862.55$3,907
Jul 1997031317.582.25$703
Jun 199717831117.242.26$3,771
May 1997032918.972.31$760
Apr 199718033817.882.08$3,922
Mar 1997037618.951.94$729
Feb 199717230120.492.21$4,188
Jan 1997023023.483.54$814
Dec 1996028023.32$0
Nov 199617542221.97$3,845
Oct 199617339023.31$4,033
Sep 199617842322.22$3,955
Aug 1996046020.26$0
Jul 199617459719.55$3,402
Jun 199617812418.73$3,334
May 199635548819.43$6,898
Apr 1996048621.51$0
Mar 1996032719.38$0
Feb 19960116.98$0
Jan 19960017.07$0
Dec 199518663817.19$3,197
Nov 1995053316.00$0
Oct 199517558215.43$2,700
Sep 199517946716.18$2,896
Aug 1995040615.92$0
Jul 1995052815.24$0
Jun 1995077416.41$0
May 199518386217.56$3,213
Apr 1995048617.73$0
Mar 199536180316.44$5,935
Feb 1995045016.58$0
Jan 1995054315.92$0
Dec 199418336315.03$2,750
Nov 1994056415.90$0
Oct 1994050215.58$0
Sep 199418376615.29$2,798
Aug 19941871,12416.13$3,016
Jul 199401,22317.56$0
Jun 19943441,17917.09$5,879
May 19943521,14015.88$5,590
Apr 19943571,22314.14$5,048
Mar 199401,20112.46$0
Feb 19941811,06512.50$2,263
Jan 1994087412.66$0
Dec 199301,11012.33$0
Nov 199353792014.49$7,781
Oct 199319211715.85$3,043
Sep 199301,06615.03$0
Aug 199301,20415.66$0
Jul 19931581,19715.46$2,443
Jun 199316086516.79$2,686
May 19931751,38017.68$3,094
Apr 19931801,36618.05$3,249
Mar 19932461,21318.14$4,462
Feb 199320970617.90$3,741
Jan 1993190116.93$3,217

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2006 — as filed, then multipliedworked
Oil                  121 bbl  × $ 66.01 =     $7,987
Casinghead gas        31 Mcf  × $  6.42 =       $199

────────────────────────────────────────────────────
Month total                                   $8,186

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/11513 is the state's own key, not one this site invented.