JAMES ESTATE OIL UNIT NO. 2

Operated by KALOS CORPORATION (P-5 450450) in the MOONROCK (RODESSA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 12031District 06Field 62709600OilCasinghead gasSaveExport
Value, all time
$325 k
Jan 1993 – Aug 2006
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
164
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 12 leases and 21 wells, and the rule below applies to all of them.

Discovered
1984-09-24
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition11,249 bbl$213,688
Casinghead gasProduction66,751 Mcf$111,523
Total$325,211

34,823 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.3727, -94.9589. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.37265, -94.95892 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,750 ft
1 wells filed one
Completion to plug
25.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,750 ft.

Completions filed
Jul 1986
1 of 1 wells
Plug dates filed
Mar 2012
1 of 1 wells

Last completion to plug: a median of 25.7 years across the 1 well that filed both dates, with the middle half between 25.7 years and 25.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1833068817,750 ftJul 1986Mar 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (164)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

164 months

Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 2006673166.016.42$4,622
Apr 200603064.397.36$221
Mar 200603156.707.08$220
Feb 200602857.597.75$217
Jan 200603160.598.93$277
Dec 200503154.9413.42$416
Nov 200503054.6910.59$318
Oct 200503158.3413.80$428
Sep 200503061.4512.08$362
Aug 200503161.519.80$304
Jul 200503155.697.84$243
Jun 200503152.337.38$229
May 200503445.226.65$226
Apr 200504949.207.36$361
Mar 200506250.377.15$444
Feb 200505645.226.31$353
Jan 20051623143.166.32$7,188
Dec 200403139.866.75$209
Nov 200403045.286.33$190
Oct 200403149.706.52$202
Sep 2004014643.245.28$771
Aug 2004013242.375.55$733
Jul 2004011038.286.08$669
Jun 2004219036.106.43$1,294
May 2004027937.486.49$1,812
Apr 2004027734.475.86$1,623
Mar 2004128634.365.53$1,616
Feb 2004027032.455.51$1,488
Jan 2004029432.036.30$1,852
Dec 200318732030.266.30$7,675
Nov 2003034928.804.60$1,604
Oct 2003033828.174.76$1,609
Sep 2003035626.314.75$1,691
Aug 2003034529.765.13$1,770
Jul 2003028429.415.17$1,469
Jun 200317726428.565.98$6,635
May 2003031526.595.97$1,881
Apr 2003026726.675.41$1,444
Mar 2003024831.146.10$1,512
Feb 2003021333.487.93$1,688
Jan 200316823130.315.58$6,382
Dec 2002019626.914.85$951
Nov 2002019924.664.14$823
Oct 200217917426.464.23$5,472
Sep 2002012627.443.64$458
Aug 2002116825.963.16$558
Jul 2002016824.583.06$514
Jun 2002121123.733.34$728
May 200203124.663.58$111
Apr 200205423.653.51$190
Mar 20021667322.003.10$3,879
Feb 200209118.222.38$216
Jan 200206617.172.38$157
Dec 200103116.932.36$73
Nov 200103018.072.41$72
Oct 200103119.782.53$78
Sep 200103024.262.25$68
Aug 200103324.873.05$101
Jul 200106323.933.20$201
Jun 2001013724.563.82$524
May 200118031625.524.31$5,955
Apr 200103024.685.34$160
Mar 200109424.545.38$505
Feb 2001022427.755.77$1,292
Jan 2001045527.478.40$3,821
Dec 2000049026.889.12$4,470
Nov 200003032.215.66$170
Oct 200005031.235.15$257
Sep 200008331.875.19$430
Aug 2000023029.644.54$1,044
Jul 2000035328.534.09$1,444
Jun 200017934029.304.40$6,740
May 2000036727.263.68$1,350
Apr 2000025724.513.12$801
Mar 2000027928.422.86$798
Feb 200017729927.622.73$5,704
Jan 2000028425.272.48$704
Dec 199917133724.282.42$4,969
Nov 1999032023.192.43$779
Oct 1999030120.982.80$844
Sep 199917632321.752.62$4,674
Aug 1999032419.262.88$932
Jul 199917948317.892.37$4,348
Jun 1999275215.942.36$1,808
May 19990115.792.32$2
Apr 19990115.102.21$2
Mar 19990412.471.84$7
Feb 1999019.981.82$2
Jan 199914910.381.90$103
Dec 19981844199.201.77$2,436
Nov 1998062610.892.19$1,368
Oct 199817828412.421.97$2,770
Sep 1998014012.592.08$292
Aug 1998045111.301.91$860
Jul 1998071011.742.24$1,588
Jun 1998157111.242.24$1,289
May 199817363812.622.21$3,591
Apr 1998059413.042.51$1,488
Mar 199820456412.802.31$3,914
Feb 199817775413.952.30$4,203
Jan 1998035214.702.15$758
Dec 1997062516.322.41$1,507
Nov 199716988718.193.09$5,813
Oct 199716766719.253.15$5,316
Sep 199717337417.742.95$4,174
Aug 199701,08217.862.55$2,764
Jul 199701,02017.582.25$2,292
Jun 19971711,00617.242.26$5,219
May 199701,14918.972.31$2,652
Apr 19973621,29017.882.08$9,159
Mar 199701,15418.951.94$2,238
Feb 1997068220.492.21$1,504
Jan 199717069623.483.54$6,455
Dec 1996078323.32$0
Nov 199618278221.97$3,999
Oct 199617381023.31$4,033
Sep 1996071922.22$0
Aug 199617581220.26$3,546
Jul 1996081719.55$0
Jun 199617777718.73$3,315
May 199617884619.43$3,459
Apr 1996042821.51$0
Mar 199617883119.38$3,450
Feb 199617696016.98$2,988
Jan 1996081417.07$0
Dec 199517483817.19$2,991
Nov 199517865916.00$2,848
Oct 199517749215.43$2,731
Sep 199517343316.18$2,799
Aug 199517449415.92$2,770
Jul 199517640915.24$2,682
Jun 1995035316.41$0
May 199517147617.56$3,003
Apr 199517942817.73$3,174
Mar 199517745816.44$2,910
Feb 199518042716.58$2,984
Jan 199517245615.92$2,738
Dec 199435533015.03$5,336
Nov 1994129515.90$16
Oct 1994017715.58$0
Sep 199417530815.29$2,676
Aug 1994064116.13$0
Jul 199417375417.56$3,038
Jun 199417946817.09$3,059
May 199417941015.88$2,843
Apr 1994014014.14$0
Mar 199418021812.46$2,243
Feb 1994014712.50$0
Jan 199417746312.66$2,241
Dec 199308112.33$0
Nov 1993024814.49$0
Oct 199311,15315.85$16
Sep 19931821,82415.03$2,735
Aug 19931801,44215.66$2,819
Jul 19931841,48215.46$2,845
Jun 19931811,59816.79$3,039
May 19931761,64417.68$3,112
Apr 19931812,09218.05$3,267
Mar 19935032,27418.14$9,124
Feb 199321884717.90$3,902
Jan 199354948516.93$9,295

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2006 — as filed, then multipliedworked
Oil                   67 bbl  × $ 66.01 =     $4,423
Casinghead gas        31 Mcf  × $  6.42 =       $199

────────────────────────────────────────────────────
Month total                                   $4,622

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/12031 is the state's own key, not one this site invented.