HOLLAND -C-

Operated by UNIT PETROLEUM COMPANY (P-5 877099) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 184131District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.7 M
May 2001 – Mar 2015
Value, last 12 filed months
$0
at the published price for each month
Months reported
167
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112001-11-30144845
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10,105 bbl$355,254
GasProduction271,463 Mcf$1,346,244
Total$1,701,498

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6616, -100.3330. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.66158, -100.33303 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,760 ft
1 wells filed one
Completion to plug
13.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,760 ft.

Completions filed
May 2001
1 of 1 wells
Plug dates filed
Mar 2015
1 of 1 wells

Last completion to plug: a median of 13.8 years across the 1 well that filed both dates, with the middle half between 13.8 years and 13.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-21132512570211,760 ftMay 2001Mar 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (167)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

167 months

Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 201108698.134.40$379
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080275.246.92$14
Sep 200803101.767.88$24
Aug 200805114.228.48$42
Jul 200802131.0811.39$23
Jun 2008021131.3313.03$274
May 2008010123.1711.57$116
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080190.388.21$8
Dec 20070088.337.30$0
Nov 20070191.677.29$7
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 2007030969.066.39$1,974
Jul 200701,33370.906.39$8,515
Jun 200701,19562.007.55$9,020
May 20071831,11058.747.85$19,459
Apr 2007095959.617.81$7,485
Mar 200701,04956.927.30$7,660
Feb 2007086655.108.22$7,115
Jan 2007096750.306.73$6,505
Dec 200603056.656.92$208
Nov 200601,11254.207.62$8,471
Oct 200601,63654.906.01$9,839
Sep 20061851,63660.085.04$19,356
Aug 200601,49868.717.34$10,995
Jul 20061791,49769.376.34$21,912
Jun 20061791,43966.286.38$21,051
May 200601,50066.016.42$9,638
Apr 20061841,47664.397.36$22,712
Mar 200601,49756.707.08$10,603
Feb 20061871,35557.597.75$21,272
Jan 200601,72260.598.93$15,383
Dec 200501,69154.9413.42$22,685
Nov 20051781,84854.6910.59$29,302
Oct 20051752,04458.3413.80$38,408
Sep 200502,11561.4512.08$25,547
Aug 20051912,27261.519.80$34,007
Jul 200502,34355.697.84$18,378
Jun 20051802,36752.337.38$26,890
May 20051863,02945.226.65$28,557
Apr 200502,88849.207.36$21,257
Mar 20051812,75950.377.15$28,857
Feb 20051832,57745.226.31$24,541
Jan 20051802,52843.166.32$23,751
Dec 200402,81539.866.75$19,004
Nov 20041892,95245.286.33$27,245
Oct 20041832,88449.706.52$27,885
Sep 20041522,93043.245.28$22,054
Aug 200402,68242.375.55$14,887
Jul 20041813,07638.286.08$25,644
Jun 20041813,10936.106.43$26,534
May 20041763,54637.486.49$29,626
Apr 200403,95634.475.86$23,176
Mar 20043614,42934.365.53$36,897
Feb 200404,30232.455.51$23,702
Jan 20041877,01132.036.30$50,156
Dec 20031793,36430.266.30$26,615
Nov 200302,12328.804.60$9,756
Oct 20031911,49528.174.76$12,496
Sep 200301,33826.314.75$6,355
Aug 20031822,10629.765.13$16,220
Jul 200303,64329.415.17$18,837
Jun 20033563,31928.565.98$30,025
May 200303,30226.595.97$19,722
Apr 20031863,03426.675.41$21,366
Mar 20031913,70131.146.10$28,509
Feb 20032733,35133.487.93$35,700
Jan 20033693,24530.315.58$29,298
Dec 20021913,10326.914.85$20,201
Nov 20021713,13824.664.14$17,199
Oct 20021844,12026.464.23$22,293
Sep 20021824,24627.443.64$20,429
Aug 20021504,77425.963.16$19,000
Jul 20021764,74724.583.06$18,860
Jun 20021804,47323.733.34$19,203
May 200204,21324.663.58$15,099
Apr 20023474,17323.653.51$22,863
Mar 20021424,86722.003.10$18,225
Feb 20021862,65518.222.38$9,696
Jan 20023534,91717.172.38$17,742
Dec 200104,67216.932.36$11,046
Nov 20013646,41318.072.41$22,004
Oct 20013755,30519.782.53$20,833
Sep 200108,46224.262.25$19,051
Aug 20015589,78624.873.05$43,756
Jul 200115316,84523.933.20$57,516
Jun 200130536,26824.563.82$146,185
May 200103,79525.524.31$16,346

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2011 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.13 =         $0
Gas                   86 Mcf  × $  4.40 =       $379

────────────────────────────────────────────────────
Month total                                     $379

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/184131 is the state's own key, not one this site invented.