CARR

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219374District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
Apr 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
254
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-11-20193768
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,424 bbl$231,885
GasProduction142,220 Mcf$1,082,254
Total$1,314,139

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6608, -100.3276. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.66077, -100.32764 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
14,324 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 14,324 ft.

Completions filed
Aug 2014
1 of 1 wells

1 well

42-21133149540114,324 ftAug 2014

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (254)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

254 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202315085.443.09$1,282
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 201401,48295.944.81$7,127
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 20130305102.523.72$1,134
Jun 2013021594.403.93$846
May 2013042494.834.15$1,759
Apr 2013044093.964.28$1,884
Mar 2013040593.623.91$1,585
Feb 2013029191.233.42$995
Jan 2013038691.603.42$1,320
Dec 2012046086.773.42$1,573
Nov 2012046686.953.62$1,689
Oct 2012148889.383.40$1,748
Sep 2012247994.672.92$1,587
Aug 201217051292.662.91$17,241
Jul 2012550785.133.02$1,957
Jun 2012347879.822.52$1,444
May 2012350291.612.49$1,524
Apr 20120474101.652.00$946
Mar 20123492105.052.22$1,408
Feb 20120445101.102.57$1,144
Jan 2012047698.092.73$1,301
Dec 201113447696.873.24$14,523
Nov 2011045695.723.31$1,510
Oct 2011049084.983.65$1,788
Sep 2011050183.623.99$1,997
Aug 2011049383.404.15$2,046
Jul 2011041794.144.52$1,884
Jun 2011048992.904.64$2,269
May 2011051698.134.40$2,273
Apr 20110489105.964.33$2,119
Mar 2011048896.364.06$1,980
Feb 2011037685.644.18$1,572
Jan 2011041986.504.59$1,923
Dec 201017144185.734.35$16,577
Nov 2010047480.843.80$1,799
Oct 2010046578.103.51$1,632
Sep 2010044072.633.98$1,751
Aug 2010041373.684.42$1,825
Jul 2010036472.554.74$1,724
Jun 2010026370.364.91$1,291
May 2010036971.124.24$1,563
Apr 2010043581.694.12$1,793
Mar 2010038778.394.39$1,698
Feb 2010024673.585.44$1,339
Jan 2010029674.365.96$1,765
Dec 2009010771.445.48$587
Nov 2009058874.593.75$2,206
Oct 2009063172.544.11$2,594
Sep 2009054965.543.06$1,683
Aug 200918861067.423.22$14,638
Jul 2009060461.133.46$2,093
Jun 2009063066.163.90$2,454
May 2009065154.743.93$2,556
Apr 2009063446.773.59$2,274
Mar 2009055842.144.06$2,265
Feb 2009075632.814.63$3,503
Jan 2009032635.865.37$1,751
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 20080131101.767.88$1,032
Aug 20080687114.228.48$5,828
Jul 2008185823131.0811.39$33,623
Jun 20080523131.3313.03$6,816
May 20080790123.1711.57$9,144
Apr 20080790110.3110.45$8,259
Mar 20080816101.909.66$7,886
Feb 2008074292.538.77$6,508
Jan 2008079390.388.21$6,507
Dec 2007070388.337.30$5,133
Nov 2007083391.677.29$6,074
Oct 200716390382.856.92$19,755
Sep 2007086775.846.24$5,414
Aug 200717482769.066.39$17,299
Jul 2007088570.906.39$5,653
Jun 2007080462.007.55$6,069
May 200701,03958.747.85$8,152
Apr 2007098359.617.81$7,673
Mar 200701,02656.927.30$7,492
Feb 200701,09355.108.22$8,980
Jan 200701,21650.306.73$8,180
Dec 200601,27256.656.92$8,800
Nov 20061721,39654.207.62$19,956
Oct 200601,23054.906.01$7,397
Sep 200601,35160.085.04$6,805
Aug 200601,55268.717.34$11,392
Jul 20061791,66369.376.34$22,965
Jun 200601,55866.286.38$9,946
May 200601,92766.016.42$12,381
Apr 200602,19464.397.36$16,149
Mar 20061842,48656.707.08$28,041
Feb 200602,80057.597.75$21,703
Jan 200603,76160.598.93$33,598
Dec 20051823,98754.9413.42$63,486
Nov 200504,80454.6910.59$50,867
Oct 20051835,80158.3413.80$90,705
Sep 20051796,38561.4512.08$88,124
Aug 20051797,87261.519.80$88,131
Jul 20053879,22555.697.84$93,910
Jun 200519810,86952.337.38$90,586
May 200536417,77845.226.65$134,704
Apr 200508,46149.207.36$62,277

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            15 bbl  × $ 85.44 =     $1,282
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $1,282

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/219374 is the state's own key, not one this site invented.