YEAGER

Operated by TECOLOTE ENERGY OPERATING, LLC (P-5 841419) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 187755District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.8 M
Dec 2001 – Oct 2018
Value, last 12 filed months
$0
at the published price for each month
Months reported
203
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-07-09147552
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,472 bbl$201,933
GasProduction476,926 Mcf$2,552,259
Total$2,754,192

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6934, -100.3354. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.69337, -100.33543 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,800 ft
1 wells filed one
Completion to plug
16.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,800 ft.

Completions filed
Dec 2001
1 of 1 wells
Plug dates filed
Mar 2018
1 of 1 wells

Last completion to plug: a median of 16.3 years across the 1 well that filed both dates, with the middle half between 16.3 years and 16.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2113254720911,800 ftDec 2001Mar 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (203)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

203 months

Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20171150.452.95$53
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 201624042.492.64$1,020
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 2015013249.822.71$357
Mar 2015025742.892.93$754
Feb 2015023244.662.98$690
Jan 20158826243.433.10$4,634
Dec 2014026554.693.59$952
Nov 2014027470.464.25$1,165
Oct 2014029578.303.90$1,151
Sep 2014029586.164.05$1,193
Aug 2014018289.394.04$734
Jul 2014031196.564.18$1,300
Jun 2014036698.164.74$1,734
May 2014048494.734.73$2,288
Apr 2014041495.944.81$1,991
Mar 2014035695.895.06$1,800
Feb 2014032197.406.19$1,988
Jan 2014040590.404.86$1,969
Dec 20136131791.824.35$6,981
Nov 2013031288.853.74$1,166
Oct 2013034697.423.78$1,308
Sep 20130364104.113.72$1,353
Aug 20130378104.253.52$1,332
Jul 20130208102.523.72$773
Jun 2013019894.403.93$779
May 2013030994.834.15$1,282
Apr 2013020393.964.28$869
Mar 2013051693.623.91$2,019
Feb 2013025491.233.42$869
Jan 2013038091.603.42$1,300
Dec 2012047686.773.42$1,628
Nov 2012049686.953.62$1,798
Oct 2012048289.383.40$1,639
Sep 201218174394.672.92$19,304
Aug 2012089592.662.91$2,603
Jul 2012073585.133.02$2,220
Jun 2012097279.822.52$2,449
May 201201,20091.612.49$2,986
Apr 201201,219101.652.00$2,434
Mar 20120989105.052.22$2,198
Feb 201201,066101.102.57$2,740
Jan 201201,20398.092.73$3,289
Dec 201101,15196.873.24$3,729
Nov 2011096895.723.31$3,205
Oct 2011094584.983.65$3,448
Sep 2011098283.623.99$3,914
Aug 201101,01183.404.15$4,195
Jul 20111791,19194.144.52$22,231
Jun 201101,20692.904.64$5,596
May 201101,35598.134.40$5,969
Apr 201101,328105.964.33$5,755
Mar 2011088096.364.06$3,570
Feb 201101,28285.644.18$5,359
Jan 201101,13786.504.59$5,217
Dec 201001,30385.734.35$5,665
Nov 201001,21680.843.80$4,615
Oct 201001,36178.103.51$4,776
Sep 201001,20472.633.98$4,791
Aug 201001,23373.684.42$5,449
Jul 201001,14372.554.74$5,414
Jun 20101751,34070.364.91$18,893
May 201001,10171.124.24$4,663
Apr 2010088581.694.12$3,649
Mar 201001,37278.394.39$6,021
Feb 2010089573.585.44$4,871
Jan 2010751,27974.365.96$13,205
Dec 200901,37571.445.48$7,540
Nov 200901,50674.593.75$5,650
Oct 200901,45572.544.11$5,980
Sep 200901,39965.543.06$4,288
Aug 200901,32467.423.22$4,261
Jul 200901,35261.133.46$4,684
Jun 20091901,24366.163.90$17,412
May 200901,50354.743.93$5,900
Apr 200901,41546.773.59$5,076
Mar 20091901,55142.144.06$14,302
Feb 200901,39932.814.63$6,482
Jan 20091892,01635.865.37$17,605
Dec 200801,51837.105.98$9,073
Nov 200801,72755.496.86$11,848
Oct 200802,03075.246.92$14,052
Sep 20081792,602101.767.88$38,711
Aug 200802,353114.228.48$19,961
Jul 200802,184131.0811.39$24,875
Jun 200802,337131.3313.03$30,457
May 200802,280123.1711.57$26,389
Apr 200801,959110.3110.45$20,481
Mar 200802,225101.909.66$21,503
Feb 200801,92492.538.77$16,875
Jan 20081852,34790.388.21$35,979
Dec 200703,49988.337.30$25,550
Nov 200702,00091.677.29$14,583
Oct 200702,24182.856.92$15,512
Sep 200701,92575.846.24$12,020
Aug 200702,24369.066.39$14,328
Jul 200702,34870.906.39$14,999
Jun 200701,84862.007.55$13,950
May 20070058.747.85$0
Apr 200701,07859.617.81$8,414
Mar 200702,20056.927.30$16,064
Feb 200702,20755.108.22$18,133
Jan 200702,62550.306.73$17,658
Dec 200602,25156.656.92$15,573
Nov 200601,95954.207.62$14,923
Oct 200601,90254.906.01$11,438
Sep 200602,00560.085.04$10,100
Aug 200601,72068.717.34$12,625
Jul 200601,86269.376.34$11,810
Jun 200602,44466.286.38$15,602
May 200602,25766.016.42$14,501
Apr 200603,11264.397.36$22,906
Mar 20060956.707.08$64
Feb 200603257.597.75$248
Jan 200601,79660.598.93$16,044
Dec 200502,48654.9413.42$33,351
Nov 200502,82554.6910.59$29,912
Oct 200503,23058.3413.80$44,560
Sep 200504,21261.4512.08$50,877
Aug 200503,97861.519.80$38,972
Jul 20051944,14055.697.84$43,277
Jun 200504,14452.337.38$30,587
May 200504,46245.226.65$29,677
Apr 200504,43649.207.36$32,651
Mar 200504,71050.377.15$33,699
Feb 200504,50045.226.31$28,404
Jan 200504,83843.166.32$30,587
Dec 200405,40739.866.75$36,503
Nov 200404,95145.286.33$31,342
Oct 200405,70649.706.52$37,175
Sep 200405,27843.245.28$27,888
Aug 20041574,95042.375.55$34,128
Jul 200405,00038.286.08$30,421
Jun 200403,70036.106.43$23,802
May 200404,95537.486.49$32,181
Apr 200405,92034.475.86$34,682
Mar 20041906,77134.365.53$43,973
Feb 200406,93532.455.51$38,209
Jan 200407,77932.036.30$49,005
Dec 200306,29930.266.30$39,694
Nov 200305,27528.804.60$24,239
Oct 20031894,69228.174.76$27,656
Sep 200303,57226.314.75$16,965
Aug 200303,73229.765.13$19,144
Jul 200305,78429.415.17$29,908
Jun 200305,77528.565.98$34,552
May 20031836,40026.595.97$43,091
Apr 200306,73326.675.41$36,407
Mar 20031877,29331.146.10$50,282
Feb 200308,27433.487.93$65,579
Jan 200308,66930.315.58$48,391
Dec 20021879,27126.914.85$50,031
Nov 200208,82524.664.14$36,509
Oct 200209,84726.464.23$41,644
Sep 2002010,81727.443.64$39,322
Aug 2002011,69025.963.16$36,989
Jul 20021898,94924.583.06$32,045
Jun 20021788,86723.733.34$33,824
May 200217911,00824.663.58$43,867
Apr 200218314,13223.653.51$53,964
Mar 200236220,43122.003.10$71,356
Feb 200218624,26118.222.38$61,025
Jan 20021917,31017.172.38$20,646
Dec 200108,23916.932.36$19,480

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2017 — as filed, then multipliedworked
Condensate             1 bbl  × $ 50.45 =        $50
Gas                    1 Mcf  × $  2.95 =         $3

────────────────────────────────────────────────────
Month total                                      $53

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/187755 is the state's own key, not one this site invented.