CAMPBELL

Operated by MMGL TXPH, LLC (P-5 101619) in the MENDOTA, NW. (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 209739District 10Field 604625002 tax incentive programmesCondensateGasSaveExport
Value, all time
$9.1 M
May 2005 – May 2026
Value, last 12 filed months
$104 k
at the published price for each month
Months reported
253
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 718 leases and 729 wells, and the rule below applies to all of them.

Discovered
1965-01-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2011-06-27.

The Commission's schedule remark for this field reads: WASH) FIELD EFFECTIVE 12/05/17.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-10-26165686
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition16,034 bbl$1,051,018
GasProduction1,457,053 Mcf$8,025,062
Total$9,076,080

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7817, -100.4608. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.78168, -100.46080 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,850 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,850 ft.

Completions filed
May 2005
1 of 1 wells

1 well

42-21132888031611,850 ftMay 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (253)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

253 months

May 202612,346106.413.05$7,252
Apr 202632,52798.932.87$7,549
Mar 202601,97489.753.15$6,217
Feb 202611,90363.503.75$7,200
Jan 202602,05559.138.00$16,436
Dec 202512,05356.664.41$9,117
Nov 202501,99658.593.93$7,837
Oct 202502,07059.383.30$6,841
Sep 20251711,93162.743.08$16,670
Aug 202501,95563.933.01$5,894
Jul 202511,99166.743.32$6,667
Jun 202502,12966.483.13$6,661
May 202502,07260.553.23$6,697
Apr 202501,79062.363.54$6,342
Mar 202501,86067.704.27$7,939
Feb 20251831,98070.884.34$21,566
Jan 202501,86574.324.28$7,980
Dec 202402,00268.993.12$6,249
Nov 202402,15969.052.20$4,746
Oct 202411,87171.372.28$4,340
Sep 202411,44869.612.36$3,493
Aug 202401,72475.632.06$3,558
Jul 202401,77679.932.15$3,812
Jun 202401,79578.082.63$4,728
May 202411,99878.812.20$4,471
Apr 202412,01384.451.66$3,424
Mar 202402,17180.301.55$3,354
Feb 202412,08276.091.78$3,790
Jan 202402,17873.023.30$7,182
Dec 2023892,36871.262.61$12,524
Nov 202302,35377.892.81$6,606
Oct 202312,60285.443.09$8,119
Sep 202302,33789.042.74$6,392
Aug 20231782,51680.522.67$21,058
Jul 202302,43474.852.64$6,430
Jun 202322,42568.962.26$5,615
May 202302,61370.622.23$5,820
Apr 202302,17278.122.24$4,860
Mar 20231862,62072.852.39$19,820
Feb 202302,25275.112.47$5,553
Jan 202302,54476.533.39$8,618
Dec 202212,66576.415.73$15,344
Nov 202202,78085.005.65$15,696
Oct 202203,06687.185.86$17,978
Sep 202202,30584.888.16$18,817
Aug 202201,93594.529.13$17,661
Jul 202202,004101.587.54$15,114
Jun 202201,997115.097.98$15,930
May 202202,200109.378.43$18,553
Apr 20221702,302104.226.84$33,458
Mar 202202,724108.885.08$13,828
Feb 202202,06691.054.86$10,038
Jan 202202,53781.844.54$11,512
Dec 20211762,70971.323.90$23,115
Nov 202102,08477.435.24$10,914
Oct 202112,31279.795.71$13,290
Sep 202102,15569.865.35$11,531
Aug 202102,56066.024.22$10,805
Jul 202102,18270.783.98$8,689
Jun 202102,29369.493.38$7,752
May 202102,79263.483.02$8,425
Apr 2021852,40760.362.76$11,770
Mar 202102,33061.302.72$6,330
Feb 202102,33457.805.55$12,949
Jan 202102,79150.412.81$7,843
Dec 202002,47144.642.68$6,611
Nov 202002,05838.772.71$5,570
Oct 202002,67536.972.48$6,630
Sep 202002,49737.091.99$4,972
Aug 202002,57539.982.39$6,142
Jul 202002,92838.371.83$5,344
Jun 202002,54634.901.69$4,304
May 20201832,69716.921.81$7,991
Apr 202002,81014.751.80$5,070
Mar 202032,83930.341.86$5,361
Feb 202002,53549.881.98$5,021
Jan 202003,49957.252.09$7,330
Dec 201913,44559.012.30$7,998
Nov 201903,40355.302.75$9,361
Oct 201903,36653.472.42$8,141
Sep 201923,40455.052.66$9,155
Aug 201903,18753.112.30$7,344
Jul 20191833,28756.272.46$18,384
Jun 201913,47752.782.49$8,715
May 201923,35958.482.74$9,322
Apr 201933,28962.632.75$9,235
Mar 201913,35056.803.06$10,315
Feb 201903,11950.852.79$8,709
Jan 20191873,41946.033.23$19,645
Dec 201803,68246.594.19$15,411
Nov 201823,18852.934.24$13,614
Oct 201813,63861.443.40$12,424
Sep 201803,34859.543.11$10,406
Aug 201803,63259.403.07$11,138
Jul 201813,11765.142.93$9,204
Jun 201813,18160.183.08$9,848
May 20181863,29865.382.90$21,728
Apr 201803,48863.842.90$10,118
Mar 201803,87761.222.79$10,805
Feb 201813,05661.782.77$8,515
Jan 201803,50062.874.01$14,033
Dec 201704,00857.272.92$11,709
Nov 201702,62855.423.12$8,195
Oct 20171933,99949.292.98$21,445
Sep 201703,71147.523.09$11,457
Aug 201703,56145.373.00$10,699
Jul 201703,61743.873.09$11,167
Jun 201703,24442.493.09$10,015
May 20171754,12345.373.26$21,395
Apr 201704,10147.933.21$13,171
Mar 201703,64546.772.98$10,876
Feb 201703,72050.452.95$10,984
Jan 201703,76649.413.42$12,875
Dec 201604,03948.763.72$15,037
Nov 201603,96242.492.64$10,477
Oct 201604,15546.193.09$12,840
Sep 201603,98641.553.10$12,359
Aug 201604,21741.442.92$12,332
Jul 201604,31041.622.92$12,604
Jun 201604,18145.352.69$11,229
May 201604,12942.521.99$8,221
Apr 201604,09336.561.99$8,149
Mar 201604,25433.011.79$7,632
Feb 201604,21826.472.06$8,704
Jan 201604,44627.352.36$10,512
Dec 201504,31932.362.00$8,644
Nov 201503,74438.792.17$8,114
Oct 20151984,53243.552.43$19,620
Sep 201504,55042.992.76$12,551
Aug 201504,62640.162.87$13,288
Jul 201504,46048.152.95$13,135
Jun 201504,41856.152.88$12,736
May 201504,73955.212.96$14,006
Apr 201503,98849.822.71$10,794
Mar 201513,07242.892.93$9,058
Feb 201513,83544.662.98$11,458
Jan 20151754,62643.433.10$21,944
Dec 201404,55054.693.59$16,341
Nov 201444,34570.464.25$18,756
Oct 201404,63378.303.90$18,073
Sep 201444,85086.164.05$19,965
Aug 201424,96689.394.04$20,217
Jul 201414,78996.564.18$20,113
Jun 201414,84898.164.74$23,063
May 201435,15194.734.73$24,631
Apr 201415,05995.944.81$24,425
Mar 201435,34795.895.06$27,326
Feb 201444,60997.406.19$28,929
Jan 201465,21790.404.86$25,901
Dec 201354,50691.824.35$20,080
Nov 201325,68288.853.74$21,419
Oct 201324,15997.423.78$15,913
Sep 20131695,554104.113.72$38,243
Aug 201325,724104.253.52$20,372
Jul 201355,656102.523.72$21,540
Jun 201325,59794.403.93$22,204
May 201335,65294.834.15$23,735
Apr 201355,47493.964.28$23,913
Mar 201395,99993.623.91$24,316
Feb 201325,21991.233.42$18,031
Jan 201326,04091.603.42$20,839
Dec 201235,14186.773.42$17,843
Nov 201245,80786.953.62$21,398
Oct 201236,19489.383.40$21,326
Sep 201226,12194.672.92$18,053
Aug 201256,37192.662.91$18,991
Jul 201246,31885.133.02$19,426
Jun 201256,26079.822.52$16,168
May 201276,47891.612.49$16,761
Apr 20122036,419101.652.00$33,452
Mar 2012146,060105.052.22$14,937
Feb 2012155,811101.102.57$16,452
Jan 2012136,97198.092.73$20,334
Dec 201196,27496.873.24$21,198
Nov 2011116,43295.723.31$22,351
Oct 201186,68184.983.65$25,056
Sep 201196,64083.623.99$27,218
Aug 201196,88383.404.15$29,310
Jul 2011117,10794.144.52$33,140
Jun 201176,98392.904.64$33,051
May 2011157,49298.134.40$34,473
Apr 2011147,603105.964.33$34,429
Mar 2011167,90296.364.06$33,603
Feb 2011126,38685.644.18$27,721
Jan 201197,74786.504.59$36,328
Dec 20104037,46885.734.35$67,018
Nov 2010177,56480.843.80$30,082
Oct 201087,24978.103.51$26,061
Sep 201067,02072.633.98$28,372
Aug 20101907,65573.684.42$47,829
Jul 201067,59072.554.74$36,385
Jun 20101967,85570.364.91$52,362
May 2010179,31271.124.24$40,647
Apr 20103511,20081.694.12$49,033
Mar 2010244,06178.394.39$19,704
Feb 201034,95473.585.44$27,182
Jan 20101996,80574.365.96$55,383
Dec 20091846,49971.445.48$48,784
Nov 200936,33574.593.75$23,990
Oct 200957,58472.544.11$31,535
Sep 20091946,29765.543.06$32,013
Aug 20091956,56167.423.22$34,263
Jul 200967,60661.133.46$26,718
Jun 200966,12266.163.90$24,242
May 20091957,51854.743.93$40,188
Apr 200977,00746.773.59$25,465
Mar 200956,73242.144.06$27,536
Feb 200966,84832.814.63$31,924
Jan 20091987,28335.865.37$46,217
Dec 200827,34237.105.98$43,958
Nov 20081776,87655.496.86$56,994
Oct 200808,01775.246.92$55,494
Sep 20081936,405101.767.88$70,092
Aug 200808,084114.228.48$68,577
Jul 20081888,558131.0811.39$122,114
Jun 20081927,100131.3313.03$117,747
May 20081828,745123.1711.57$123,634
Apr 200808,285110.3110.45$86,619
Mar 200807,722101.909.66$74,626
Feb 20081858,15392.538.77$88,625
Jan 200809,31390.388.21$76,420
Dec 20071908,87888.337.30$81,610
Nov 20071898,53391.677.29$79,546
Oct 20071738,86682.856.92$75,703
Sep 20071858,80775.846.24$69,023
Aug 200709,16569.066.39$58,545
Jul 20071859,79870.906.39$75,706
Jun 20071759,78762.007.55$84,727
May 200717410,50258.747.85$92,622
Apr 20071919,59759.617.81$86,292
Mar 200717910,31656.927.30$85,516
Feb 200708,65555.108.22$71,109
Jan 200718610,97250.306.73$83,163
Dec 200618611,27756.656.92$88,556
Nov 200618510,90454.207.62$93,088
Oct 200618111,56554.906.01$79,487
Sep 200636212,35860.085.04$83,999
Aug 200618713,36668.717.34$110,954
Jul 200618113,98169.376.34$101,234
Jun 200614914,04066.286.38$99,505
May 200618415,51566.016.42$111,830
Apr 200636314,89064.397.36$132,971
Mar 200618814,28256.707.08$111,818
Feb 200618914,01057.597.75$119,478
Jan 200637516,54160.598.93$170,487
Dec 200519017,88154.9413.42$250,319
Nov 200537517,65954.6910.59$207,489
Oct 200537019,70458.3413.80$293,417
Sep 200535820,51161.4512.08$269,751
Aug 200573728,66361.519.80$326,140
Jul 200576633,06855.697.84$302,032
Jun 20051,31542,90952.337.38$385,527
May 200573849,87945.226.65$365,126

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $106.41 =       $106
Gas                2,346 Mcf  × $  3.05 =     $7,146

────────────────────────────────────────────────────
Month total                                   $7,252

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/209739 is the state's own key, not one this site invented.