CAMPBELL

Operated by MMGL TXPH, LLC (P-5 101619) in the MENDOTA, NW. (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 229598District 10Field 604625002 tax incentive programmesCondensateGasSaveExport
Value, all time
$8.0 M
Jun 2007 – May 2026
Value, last 12 filed months
$105 k
at the published price for each month
Months reported
228
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 718 leases and 729 wells, and the rule below applies to all of them.

Discovered
1965-01-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2011-06-27.

The Commission's schedule remark for this field reads: WASH) FIELD EFFECTIVE 12/05/17.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-02-01179979
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition16,408 bbl$1,247,855
GasProduction1,278,773 Mcf$6,797,221
Total$8,045,075

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7764, -100.4621. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.77639, -100.46209 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,905 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,905 ft.

Completions filed
Jun 2007
1 of 1 wells

1 well

42-21133838191611,905 ftJun 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (228)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

228 months

May 202621,968106.413.05$6,207
Apr 202651,79098.932.87$5,631
Mar 20261822,02589.753.15$22,712
Feb 202621,87263.503.75$7,148
Jan 202601,81859.138.00$14,540
Dec 202521,96556.664.41$8,786
Nov 202501,96058.593.93$7,696
Oct 202501,96359.383.30$6,487
Sep 202501,93362.743.08$5,948
Aug 202502,00563.933.01$6,045
Jul 202522,04666.743.32$6,916
Jun 202502,06466.483.13$6,458
May 20251641,85960.553.23$15,939
Apr 202501,86162.363.54$6,594
Mar 202501,95967.704.27$8,362
Feb 202502,03970.884.34$8,851
Jan 202501,83074.324.28$7,830
Dec 202402,03268.993.12$6,343
Nov 202401,97469.052.20$4,340
Oct 202422,06271.372.28$4,847
Sep 20241711,96669.612.36$16,552
Aug 202401,92275.632.06$3,966
Jul 20241821,94779.932.15$18,727
Jun 202401,86478.082.63$4,910
May 202422,10278.812.20$4,779
Apr 202422,01484.451.66$3,511
Mar 202402,23780.301.55$3,456
Feb 202422,04376.091.78$3,796
Jan 202402,41973.023.30$7,977
Dec 202322,16971.262.61$5,805
Nov 20231782,12077.892.81$19,816
Oct 202322,14285.443.09$6,784
Sep 202302,11789.042.74$5,790
Aug 202302,21780.522.67$5,926
Jul 202302,25274.852.64$5,949
Jun 20231762,20668.962.26$17,119
May 202302,31970.622.23$5,165
Apr 202302,19978.122.24$4,921
Mar 202301,55172.852.39$3,712
Feb 202301,55775.112.47$3,839
Jan 202301,87376.533.39$6,345
Dec 202211,94676.415.73$11,225
Nov 202202,09985.005.65$11,851
Oct 202201,82687.185.86$10,707
Sep 202201,94484.888.16$15,870
Aug 202201,72494.529.13$15,735
Jul 202201,757101.587.54$13,251
Jun 202202,031115.097.98$16,202
May 202202,008109.378.43$16,934
Apr 20221841,745104.226.84$31,108
Mar 202202,027108.885.08$10,290
Feb 202201,86491.054.86$9,057
Jan 202211,76481.844.54$8,086
Dec 202101,78271.323.90$6,948
Nov 202122,13177.435.24$11,315
Oct 202101,93479.795.71$11,051
Sep 202101,74369.865.35$9,327
Aug 202111,98666.024.22$8,448
Jul 202142,43770.783.98$9,987
Jun 20211861,86969.493.38$19,244
May 202132,01963.483.02$6,283
Apr 202102,38260.362.76$6,571
Mar 202112,94961.302.72$8,074
Feb 202101,57857.805.55$8,755
Jan 202101,70650.412.81$4,794
Dec 202011,71844.642.68$4,641
Nov 202031,80738.772.71$5,007
Oct 202012,10536.972.48$5,254
Sep 202002,21237.091.99$4,404
Aug 202022,53739.982.39$6,131
Jul 202002,27738.371.83$4,156
Jun 202001,75334.901.69$2,963
May 20201841,93816.921.81$6,630
Apr 202002,22214.751.80$4,009
Mar 202022,19430.341.86$4,133
Feb 202012,20949.881.98$4,425
Jan 202002,27057.252.09$4,755
Dec 201912,27559.012.30$5,301
Nov 201902,34055.302.75$6,437
Oct 201902,45953.472.42$5,947
Sep 201912,39155.052.66$6,409
Aug 20191752,24853.112.30$14,474
Jul 201912,20956.272.46$5,491
Jun 201912,25752.782.49$5,675
May 201922,49758.482.74$6,960
Apr 201942,39062.632.75$6,825
Mar 20191862,23756.803.06$17,415
Feb 201902,14250.852.79$5,981
Jan 201902,48746.033.23$8,028
Dec 201802,55346.594.19$10,685
Nov 201822,43852.934.24$10,436
Oct 201812,74061.443.40$9,372
Sep 201802,84459.543.11$8,839
Aug 201802,72959.403.07$8,369
Jul 20181842,89565.142.93$20,474
Jun 201812,66860.183.08$8,269
May 201802,75565.382.90$7,992
Apr 201802,67663.842.90$7,763
Mar 201802,94261.222.79$8,199
Feb 201822,61361.782.77$7,351
Jan 201802,90962.874.01$11,663
Dec 201702,20857.272.92$6,451
Nov 201702,28555.423.12$7,125
Oct 20171951,26549.292.98$13,386
Sep 201702,42947.523.09$7,499
Aug 201703,43645.373.00$10,323
Jul 201702,67543.873.09$8,258
Jun 20171862,59942.493.09$15,927
May 201702,91645.373.26$9,516
Apr 201702,68547.933.21$8,623
Mar 201703,06846.772.98$9,154
Feb 201702,81550.452.95$8,312
Jan 201702,86449.413.42$9,791
Dec 201602,97948.763.72$11,090
Nov 20161943,06042.492.64$16,335
Oct 201602,70746.193.09$8,365
Sep 201602,60141.553.10$8,065
Aug 201602,36641.442.92$6,919
Jul 201602,40241.622.92$7,024
Jun 201602,36845.352.69$6,360
May 201602,25642.521.99$4,492
Apr 201602,50236.561.99$4,982
Mar 201602,76033.011.79$4,951
Feb 201602,61226.472.06$5,390
Jan 20161952,78327.352.36$11,913
Dec 201503,13232.362.00$6,268
Nov 201502,88338.792.17$6,248
Oct 201503,38743.552.43$8,219
Sep 201503,34342.992.76$9,221
Aug 201503,29740.162.87$9,471
Jul 20151773,23048.152.95$18,035
Jun 201503,11656.152.88$8,983
May 201503,20455.212.96$9,469
Apr 201502,82249.822.71$7,638
Mar 201503,09342.892.93$9,077
Feb 201512,86744.662.98$8,577
Jan 201533,28143.433.10$10,303
Dec 201403,70554.693.59$13,306
Nov 20141713,74670.464.25$27,976
Oct 201404,44678.303.90$17,344
Sep 201424,68786.164.05$19,133
Aug 201434,89589.394.04$20,020
Jul 201435,19796.564.18$22,011
Jun 201434,23998.164.74$20,374
May 20141164,15494.734.73$30,623
Apr 201414,30295.944.81$20,785
Mar 201434,23495.895.06$21,698
Feb 201433,59997.406.19$22,577
Jan 201443,88490.404.86$19,241
Dec 201354,43791.824.35$19,780
Nov 201343,90788.853.74$14,961
Oct 201314,18397.423.78$15,906
Sep 201334,684104.113.72$17,726
Aug 201384,931104.253.52$18,204
Jul 2013264,395102.523.72$19,005
Jun 2013174,39294.403.93$18,880
May 2013254,68394.834.15$21,801
Apr 2013234,60893.964.28$21,895
Mar 2013334,70393.623.91$21,492
Feb 201344,07091.233.42$14,284
Jan 201315,26391.603.42$18,091
Dec 201223,81586.773.42$13,221
Nov 201214,98586.953.62$18,157
Oct 201215,27489.383.40$18,019
Sep 201215,21594.672.92$15,314
Aug 201225,23992.662.91$15,421
Jul 201235,07085.133.02$15,571
Jun 201275,52579.822.52$14,476
May 20122015,54191.612.49$32,201
Apr 201275,828101.652.00$12,349
Mar 2012124,746105.052.22$11,807
Feb 2012124,691101.102.57$13,270
Jan 2012105,89398.092.73$17,093
Dec 201165,87996.873.24$19,628
Nov 201165,30195.723.31$18,127
Oct 201166,15484.983.65$22,963
Sep 201176,34483.623.99$25,871
Aug 201166,63283.404.15$28,019
Jul 201166,78594.144.52$31,214
Jun 201136,54392.904.64$30,637
May 201157,18398.134.40$32,130
Apr 201146,810105.964.33$29,933
Mar 201157,24296.364.06$29,865
Feb 201144,77285.644.18$20,289
Jan 201136,63586.504.59$30,706
Dec 201067,18985.734.35$31,770
Nov 201066,84180.843.80$26,449
Oct 201087,33778.103.51$26,370
Sep 201057,46672.633.98$30,074
Aug 201057,77973.684.42$34,747
Jul 201058,08172.554.74$38,638
Jun 201067,87270.364.91$39,077
May 201088,35071.124.24$35,933
Apr 2010108,40181.694.12$35,452
Mar 2010199,25078.394.39$42,085
Feb 201089,42073.585.44$51,856
Jan 201035,16674.365.96$31,034
Dec 200968,44571.445.48$46,739
Nov 200968,92074.593.75$33,911
Oct 200959,52372.544.11$39,505
Sep 20091929,40165.543.06$41,395
Aug 2009129,96367.423.22$32,875
Jul 2009810,52761.133.46$36,960
Jun 20091010,58766.163.90$41,898
May 20091111,72454.743.93$46,628
Apr 20091211,91146.773.59$43,292
Mar 200920612,54242.144.06$59,589
Feb 200920911,91432.814.63$62,055
Jan 200919812,51635.865.37$74,324
Dec 200819712,44337.105.98$81,682
Nov 200819413,47655.496.86$103,215
Oct 200818714,41375.246.92$113,836
Sep 200837214,748101.767.88$154,026
Aug 200819316,368114.228.48$160,895
Jul 200838417,121131.0811.39$245,333
Jun 200837017,336131.3313.03$274,526
May 200818618,927123.1711.57$241,976
Apr 200837219,589110.3110.45$245,836
Mar 200836721,339101.909.66$243,619
Feb 200836521,42992.538.77$221,718
Jan 200836224,39990.388.21$232,929
Dec 200736927,28688.337.30$231,835
Nov 200773929,47091.677.29$282,631
Oct 200792633,59182.856.92$309,235
Sep 200790836,76275.846.24$298,411
Aug 20071,45744,68969.066.39$386,091
Jul 20071,91655,83870.906.39$492,534
Jun 20071,63459,23462.007.55$548,433

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             2 bbl  × $106.41 =       $213
Gas                1,968 Mcf  × $  3.05 =     $5,994

────────────────────────────────────────────────────
Month total                                   $6,207

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/229598 is the state's own key, not one this site invented.