Operated by MITCHELL EHRLICH OIL & GAS, LLC (P-5 570652) in the HARTLEY HUGOTON(KRIDER DOLOMITE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 212839District 10Field 39480500GasSaveExport
Value, all time
$1.6 M
Sep 2005 – Mar 2023
Value, last 12 filed months
$0
at the published price for each month
Months reported
211
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 22 leases and 22 wells, and the rule below applies to all of them.

Discovered
1989-10-24
as the register files it
Field class
Gas
the register's own label
Between wells
1,880 ft
minimum
From a lease line
990 ft
minimum

A drilling unit in this field needs at least 320 acres. The field rule took effect on 1994-01-10.

The Commission's schedule remark for this field reads: PER DOCKET 10-0202033 TEMPORARY RULES MADE PERMANENT EFF. 1/10/94

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction256,766 Mcf$1,611,750
Total$1,611,750

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.9913, -102.1555. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.99132, -102.15545 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,631 ft
1 wells filed one
Completion to plug
17.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,631 ft.

Completions filed
Sep 2005
1 of 1 wells
Plug dates filed
Mar 2023
1 of 1 wells

Last completion to plug: a median of 17.5 years across the 1 well that filed both dates, with the middle half between 17.5 years and 17.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3413293013,631 ftSep 2005Mar 2023Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (211)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

211 months

Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 20191359.012.30$30
Nov 201921755.302.75$597
Oct 201931753.472.42$767
Sep 201918055.052.66$478
Aug 201939253.112.30$903
Jul 201933956.272.46$834
Jun 201931052.782.49$772
May 201950358.482.74$1,378
Apr 201954562.632.75$1,499
Mar 201954456.803.06$1,666
Feb 2019050.852.79$0
Jan 201974646.033.23$2,408
Dec 201863946.594.19$2,675
Nov 201855452.934.24$2,347
Oct 201894261.443.40$3,201
Sep 20188959.543.11$277
Aug 201875759.403.07$2,321
Jul 201854265.142.93$1,589
Jun 201866960.183.08$2,058
May 201880365.382.90$2,329
Apr 201878463.842.90$2,274
Mar 201834261.222.79$953
Feb 201880261.782.77$2,218
Jan 201874262.874.01$2,975
Dec 201772557.272.92$2,118
Nov 201768855.423.12$2,145
Oct 201744249.292.98$1,319
Sep 201745547.523.09$1,405
Aug 201771845.373.00$2,157
Jul 201771543.873.09$2,207
Jun 201770342.493.09$2,170
May 201756445.373.26$1,841
Apr 201771547.933.21$2,296
Mar 201770546.772.98$2,103
Feb 201766350.452.95$1,958
Jan 201779949.413.42$2,732
Dec 201673448.763.72$2,733
Nov 201678042.492.64$2,063
Oct 201664746.193.09$1,999
Sep 201673741.553.10$2,285
Aug 2016041.442.92$0
Jul 201678841.622.92$2,304
Jun 201685345.352.69$2,291
May 201625042.521.99$498
Apr 201628836.561.99$573
Mar 201676533.011.79$1,372
Feb 201678626.472.06$1,622
Jan 201661027.352.36$1,442
Dec 201559532.362.00$1,191
Nov 201556438.792.17$1,222
Oct 201561443.552.43$1,490
Sep 201549042.992.76$1,352
Aug 201542740.162.87$1,227
Jul 201548248.152.95$1,420
Jun 201559456.152.88$1,712
May 201578155.212.96$2,308
Apr 201527749.822.71$750
Mar 201575542.892.93$2,216
Feb 201571944.662.98$2,140
Jan 201557743.433.10$1,789
Dec 201490354.693.59$3,243
Nov 201481270.464.25$3,452
Oct 201472078.303.90$2,809
Sep 201473786.164.05$2,981
Aug 20141,51789.394.04$6,121
Jul 20141,06796.564.18$4,460
Jun 2014898.164.74$38
May 2014094.734.73$0
Apr 201474695.944.81$3,588
Mar 201423595.895.06$1,188
Feb 201437797.406.19$2,334
Jan 201467590.404.86$3,281
Dec 201387491.824.35$3,806
Nov 201389288.853.74$3,335
Oct 201387897.423.78$3,318
Sep 2013817104.113.72$3,037
Aug 2013612104.253.52$2,156
Jul 20131,103102.523.72$4,101
Jun 20131,11494.403.93$4,382
May 201363694.834.15$2,639
Apr 20132393.964.28$99
Mar 201326793.623.91$1,045
Feb 201331191.233.42$1,064
Jan 201337591.603.42$1,282
Dec 201246286.773.42$1,580
Nov 201251286.953.62$1,856
Oct 201273389.383.40$2,492
Sep 201276094.672.92$2,218
Aug 201262192.662.91$1,806
Jul 201269985.133.02$2,112
Jun 201288179.822.52$2,219
May 201268891.612.49$1,712
Apr 2012772101.652.00$1,542
Mar 20121,991105.052.22$4,424
Feb 20121,942101.102.57$4,991
Jan 20122,02298.092.73$5,528
Dec 20111,76696.873.24$5,721
Nov 20112,12195.723.31$7,023
Oct 20111,63184.983.65$5,951
Sep 20111,78283.623.99$7,103
Aug 20112,06883.404.15$8,581
Jul 20112,01494.144.52$9,098
Jun 20111,95092.904.64$9,048
May 20111,23498.134.40$5,436
Apr 201185105.964.33$368
Mar 20111,01996.364.06$4,134
Feb 201192185.644.18$3,850
Jan 201197786.504.59$4,483
Dec 201093785.734.35$4,074
Nov 201097080.843.80$3,681
Oct 20101,08978.103.51$3,821
Sep 20101,01572.633.98$4,039
Aug 201088673.684.42$3,916
Jul 201046672.554.74$2,207
Jun 201094570.364.91$4,640
May 20101,07871.124.24$4,566
Apr 20101,08381.694.12$4,465
Mar 20101,00678.394.39$4,415
Feb 201080973.585.44$4,403
Jan 201090674.365.96$5,403
Dec 200990171.445.48$4,941
Nov 200993974.593.75$3,523
Oct 20091,08972.544.11$4,476
Sep 200980765.543.06$2,473
Aug 200996967.423.22$3,119
Jul 20091,12361.133.46$3,891
Jun 20091,25866.163.90$4,900
May 20091,15754.743.93$4,542
Apr 20091,15546.773.59$4,144
Mar 20091,25342.144.06$5,086
Feb 20091,13832.814.63$5,272
Jan 20091,36835.865.37$7,348
Dec 20081,02437.105.98$6,121
Nov 20081,28055.496.86$8,781
Oct 20081,45975.246.92$10,099
Sep 20081,289101.767.88$10,154
Aug 20081,090114.228.48$9,246
Jul 20081,282131.0811.39$14,601
Jun 20081,305131.3313.03$17,008
May 20081,402123.1711.57$16,227
Apr 20081,740110.3110.45$18,191
Mar 20084,191101.909.66$40,502
Feb 20084,32892.538.77$37,959
Jan 20083,64090.388.21$29,869
Dec 20074,07088.337.30$29,719
Nov 20075,15591.677.29$37,589
Oct 20073,99982.856.92$27,681
Sep 20073,65475.846.24$22,816
Aug 20073,87169.066.39$24,728
Jul 20074,04170.906.39$25,814
Jun 20073,97262.007.55$29,982
May 20074,16358.747.85$32,664
Apr 20073,81959.617.81$29,808
Mar 20074,24456.927.30$30,990
Feb 20073,90055.108.22$32,042
Jan 20073,70750.306.73$24,936
Dec 20064,11956.656.92$28,497
Nov 20064,32054.207.62$32,908
Oct 20064,88254.906.01$29,359
Sep 20064,48860.085.04$22,607
Aug 20065,18868.717.34$38,080
Jul 20064,78069.376.34$30,318
Jun 20065,22966.286.38$33,381
May 20065,79366.016.42$37,220
Apr 20064,38064.397.36$32,239
Mar 20065,66356.707.08$40,111
Feb 20065,31557.597.75$41,197
Jan 20066,18360.598.93$55,235
Dec 20056,63454.9413.42$88,998
Nov 20057,13854.6910.59$75,580
Oct 20055,78058.3413.80$79,739
Sep 200577661.4512.08$9,373

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2019 — as filed, then multipliedworked
Gas                   13 Mcf  × $  2.30 =        $30

────────────────────────────────────────────────────
Month total                                      $30

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/212839 is the state's own key, not one this site invented.