BOYD

Operated by LASATER & CO, INC. (P-5 487415) in the HARTLEY HUGOTON(KRIDER DOLOMITE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236812District 10Field 39480500GasSaveExport
Value, all time
$104 k
Apr 2008 – Apr 2023
Value, last 12 filed months
$0
at the published price for each month
Months reported
181
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 22 leases and 22 wells, and the rule below applies to all of them.

Discovered
1989-10-24
as the register files it
Field class
Gas
the register's own label
Between wells
1,880 ft
minimum
From a lease line
990 ft
minimum

A drilling unit in this field needs at least 320 acres. The field rule took effect on 1994-01-10.

The Commission's schedule remark for this field reads: PER DOCKET 10-0202033 TEMPORARY RULES MADE PERMANENT EFF. 1/10/94

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction26,047 Mcf$104,063
Total$104,063

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.9813, -102.1332. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.98131, -102.13321 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,620 ft
1 wells filed one
Completion to plug
15.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,620 ft.

Completions filed
Apr 2008
1 of 1 wells
Plug dates filed
May 2023
1 of 1 wells

Last completion to plug: a median of 15.1 years across the 1 well that filed both dates, with the middle half between 15.1 years and 15.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3413301524143,620 ftApr 2008May 2023Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (181)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

181 months

Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020357.252.09$6
Dec 2019059.012.30$0
Nov 2019255.302.75$6
Oct 20192153.472.42$51
Sep 201910255.052.66$271
Aug 201920253.112.30$465
Jul 20199256.272.46$226
Jun 2019052.782.49$0
May 20198058.482.74$219
Apr 201915462.632.75$424
Mar 20196756.803.06$205
Feb 201914350.852.79$399
Jan 201912246.033.23$394
Dec 201812446.594.19$519
Nov 20189252.934.24$390
Oct 20182061.443.40$68
Sep 2018059.543.11$0
Aug 201812559.403.07$383
Jul 201815665.142.93$457
Jun 2018060.183.08$0
May 201812565.382.90$363
Apr 201814263.842.90$412
Mar 20181661.222.79$45
Feb 20181661.782.77$44
Jan 2018362.874.01$12
Dec 2017057.272.92$0
Nov 201714155.423.12$440
Oct 201711249.292.98$334
Sep 201714747.523.09$454
Aug 20178645.373.00$258
Jul 201711443.873.09$352
Jun 201713142.493.09$404
May 201710245.373.26$333
Apr 201716647.933.21$533
Mar 201720346.772.98$606
Feb 201719950.452.95$588
Jan 201725749.413.42$879
Dec 201626648.763.72$990
Nov 201618042.492.64$476
Oct 201611246.193.09$346
Sep 201611741.553.10$363
Aug 201617841.442.92$521
Jul 20164941.622.92$143
Jun 201621445.352.69$575
May 20165842.521.99$115
Apr 201616036.561.99$319
Mar 20168433.011.79$151
Feb 201665626.472.06$1,354
Jan 201657827.352.36$1,367
Dec 201532532.362.00$650
Nov 20158438.792.17$182
Oct 201510943.552.43$265
Sep 20157842.992.76$215
Aug 201512540.162.87$359
Jul 201523448.152.95$689
Jun 201550656.152.88$1,459
May 201555055.212.96$1,626
Apr 201550149.822.71$1,356
Mar 201577442.892.93$2,271
Feb 201591444.662.98$2,720
Jan 20151,08443.433.10$3,361
Dec 20141,07554.693.59$3,861
Nov 201427570.464.25$1,169
Oct 2014378.303.90$12
Sep 20147586.164.05$303
Aug 20146689.394.04$266
Jul 20149896.564.18$410
Jun 20142598.164.74$118
May 20144294.734.73$199
Apr 20145595.944.81$265
Mar 201411495.895.06$576
Feb 201412397.406.19$762
Jan 201414690.404.86$710
Dec 201314691.824.35$636
Nov 201313788.853.74$512
Oct 201313097.423.78$491
Sep 201389104.113.72$331
Aug 201385104.253.52$299
Jul 2013102102.523.72$379
Jun 201311994.403.93$468
May 20138794.834.15$361
Apr 201310493.964.28$445
Mar 201313493.623.91$524
Feb 201314091.233.42$479
Jan 201315991.603.42$544
Dec 201216686.773.42$568
Nov 201213086.953.62$471
Oct 201214189.383.40$479
Sep 201216094.672.92$467
Aug 20128592.662.91$247
Jul 201211485.133.02$344
Jun 201215179.822.52$380
May 201211091.612.49$274
Apr 2012197101.652.00$393
Mar 2012305105.052.22$678
Feb 2012295101.102.57$758
Jan 201223998.092.73$653
Dec 20118496.873.24$272
Nov 201131095.723.31$1,027
Oct 201128584.983.65$1,040
Sep 201123883.623.99$949
Aug 201123183.404.15$958
Jul 201122094.144.52$994
Jun 201120692.904.64$956
May 201122298.134.40$978
Apr 201178105.964.33$338
Mar 201121796.364.06$880
Feb 201112085.644.18$502
Jan 201121686.504.59$991
Dec 201022585.734.35$978
Nov 201020580.843.80$778
Oct 201016178.103.51$565
Sep 201019072.633.98$756
Aug 201015373.684.42$676
Jul 20105872.554.74$275
Jun 201014370.364.91$702
May 201023871.124.24$1,008
Apr 201025181.694.12$1,035
Mar 201020678.394.39$904
Feb 20105373.585.44$288
Jan 201021574.365.96$1,282
Dec 200921571.445.48$1,179
Nov 200925974.593.75$972
Oct 2009072.544.11$0
Sep 2009065.543.06$0
Aug 2009067.423.22$0
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 2009054.743.93$0
Apr 200931046.773.59$1,112
Mar 200932342.144.06$1,311
Feb 200930132.814.63$1,395
Jan 200932635.865.37$1,751
Dec 200832437.105.98$1,937
Nov 200835055.496.86$2,401
Oct 200834175.246.92$2,360
Sep 2008387101.767.88$3,048
Aug 2008348114.228.48$2,952
Jul 2008384131.0811.39$4,374
Jun 2008445131.3313.03$5,800
May 2008133123.1711.57$1,539
Apr 200853110.3110.45$554

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2020 — as filed, then multipliedworked
Gas                    3 Mcf  × $  2.09 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/236812 is the state's own key, not one this site invented.