PEAK-WALSER

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 214434District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
Apr 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
254
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-03-22167973
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,997 bbl$108,614
GasProduction150,754 Mcf$1,131,677
Total$1,240,291

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6903, -100.3734. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.69029, -100.37340 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,038 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,038 ft.

Completions filed
Apr 2005
1 of 1 wells

1 well

42-21133197602913,038 ftApr 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (254)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

254 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20161046.193.09$46
Sep 20161041.553.10$42
Aug 20160041.442.92$0
Jul 20164041.622.92$166
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 201602536.561.99$50
Mar 2016010333.011.79$185
Feb 20161812726.472.06$739
Jan 20162615327.352.36$1,073
Dec 2015014232.362.00$284
Nov 201509538.792.17$206
Oct 201508443.552.43$204
Sep 201508342.992.76$229
Aug 201506740.162.87$192
Jul 201505048.152.95$147
Jun 201506656.152.88$190
May 201506555.212.96$192
Apr 201505949.822.71$160
Mar 201505242.892.93$153
Feb 20150844.662.98$24
Jan 201504943.433.10$152
Dec 201406454.693.59$230
Nov 201409470.464.25$400
Oct 201408378.303.90$324
Sep 201406486.164.05$259
Aug 201406089.394.04$242
Jul 201403996.564.18$163
Jun 201405698.164.74$265
May 201404894.734.73$227
Apr 201405395.944.81$255
Mar 201408195.895.06$410
Feb 201402597.406.19$155
Jan 201406390.404.86$306
Dec 201304291.824.35$183
Nov 201304588.853.74$168
Oct 201303997.423.78$147
Sep 2013040104.113.72$149
Aug 20131046104.253.52$1,205
Jul 2013093102.523.72$346
Jun 201307194.403.93$279
May 201308294.834.15$340
Apr 201305393.964.28$227
Mar 201307493.623.91$290
Feb 201303791.233.42$127
Jan 201302291.603.42$75
Dec 201203486.773.42$116
Nov 201202586.953.62$91
Oct 201214889.383.40$253
Sep 20120094.672.92$0
Aug 201208792.662.91$253
Jul 2012011085.133.02$332
Jun 2012010579.822.52$265
May 2012012791.612.49$316
Apr 2012081101.652.00$162
Mar 20120215105.052.22$478
Feb 2012090101.102.57$231
Jan 2012017698.092.73$481
Dec 201107996.873.24$256
Nov 2011016195.723.31$533
Oct 2011014484.983.65$525
Sep 2011018083.623.99$717
Aug 2011014583.404.15$602
Jul 2011012394.144.52$556
Jun 20111624192.904.64$2,605
May 2011179498.134.40$2,082
Apr 20111154105.964.33$773
Mar 2011016796.364.06$678
Feb 2011019085.644.18$794
Jan 2011024186.504.59$1,106
Dec 201002585.734.35$109
Nov 2010022780.843.80$862
Oct 2010015478.103.51$540
Sep 2010015272.633.98$605
Aug 2010153473.684.42$1,255
Jul 2010015172.554.74$715
Jun 2010022370.364.91$1,095
May 2010028771.124.24$1,216
Apr 20101522681.694.12$2,157
Mar 2010022378.394.39$979
Feb 2010021573.585.44$1,170
Jan 2010022074.365.96$1,312
Dec 2009030571.445.48$1,673
Nov 2009031174.593.75$1,167
Oct 2009034372.544.11$1,410
Sep 2009030665.543.06$938
Aug 2009034767.423.22$1,117
Jul 2009034961.133.46$1,209
Jun 2009038766.163.90$1,507
May 2009036954.743.93$1,449
Apr 2009018646.773.59$667
Mar 20091331642.144.06$1,830
Feb 2009145732.814.63$2,150
Jan 2009056135.865.37$3,013
Dec 2008035937.105.98$2,146
Nov 2008039355.496.86$2,696
Oct 2008131375.246.92$2,242
Sep 200816325101.767.88$4,188
Aug 20080434114.228.48$3,682
Jul 20080462131.0811.39$5,262
Jun 20081405131.3313.03$5,410
May 20081432123.1711.57$5,123
Apr 20081481110.3110.45$5,139
Mar 200824591101.909.66$8,157
Feb 2008360092.538.77$5,540
Jan 2008378490.388.21$6,704
Dec 2007489788.337.30$6,903
Nov 2007293191.677.29$6,972
Oct 2007495982.856.92$6,970
Sep 2007291,02775.846.24$8,612
Aug 200721,09969.066.39$7,158
Jul 200711,12470.906.39$7,251
Jun 200721,13062.007.55$8,654
May 200731,15158.747.85$9,207
Apr 200751,02859.617.81$8,322
Mar 200732,29956.927.30$16,958
Feb 200713,43655.108.22$28,285
Jan 200713,36950.306.73$22,713
Dec 200614,37356.656.92$30,311
Nov 2006314,34454.207.62$34,771
Oct 200644,18154.906.01$25,363
Sep 200614,07260.085.04$20,572
Aug 2006293,67768.717.34$28,981
Jul 200623,81669.376.34$24,343
Jun 200643,95166.286.38$25,488
May 200644,11766.016.42$26,716
Apr 200663,97864.397.36$29,666
Mar 2006194,03356.707.08$29,643
Feb 2006104,12057.597.75$32,511
Jan 2006754,38960.598.93$43,753
Dec 2005243,92954.9413.42$54,028
Nov 2005352,85054.6910.59$32,091
Oct 2005153,50558.3413.80$49,229
Sep 2005703,72761.4512.08$49,320
Aug 2005424,32561.519.80$44,955
Jul 20051277,93955.697.84$69,343
Jun 200528011,01052.337.38$95,918
May 200528817,25645.226.65$127,796
Apr 200568411,14049.207.36$115,649

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2016 — as filed, then multipliedworked
Condensate             1 bbl  × $ 46.19 =        $46
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                      $46

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/214434 is the state's own key, not one this site invented.