PEAK-WALSER

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 213630District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.5 M
Aug 2005 – May 2026
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
250
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-03-22167548
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,392 bbl$145,535
GasProduction245,259 Mcf$1,395,892
Total$1,541,427

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6893, -100.3769. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.68934, -100.37687 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,209 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,209 ft.

Completions filed
Aug 2005
1 of 1 wells

1 well

42-211332875029 A13,209 ftAug 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (250)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

250 months

May 2026055106.413.05$168
Apr 2026015898.932.87$453
Mar 2026011189.753.15$350
Feb 2026011063.503.75$413
Jan 2026023459.138.00$1,872
Dec 2025015056.664.41$662
Nov 2025017358.593.93$679
Oct 2025233659.383.30$1,229
Sep 2025018662.743.08$572
Aug 2025036163.933.01$1,088
Jul 20250066.743.32$0
Jun 2025036166.483.13$1,129
May 20250060.553.23$0
Apr 2025013862.363.54$489
Mar 202503967.704.27$166
Feb 2025013470.884.34$582
Jan 2025030074.324.28$1,284
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 2024013671.372.28$310
Sep 2024018869.612.36$445
Aug 20240075.632.06$0
Jul 2024012079.932.15$258
Jun 2024023778.082.63$624
May 20240078.812.20$0
Apr 2024022484.451.66$372
Mar 20240080.301.55$0
Feb 20240676.091.78$11
Jan 202414073.023.30$1,022
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20235078.122.24$391
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 2022046084.888.16$3,755
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 202125070.783.98$1,770
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 202006239.982.39$148
Jul 2020013238.371.83$241
Jun 2020013734.901.69$232
May 2020014816.921.81$269
Apr 2020018914.751.80$341
Mar 2020032030.341.86$594
Feb 2020031649.881.98$626
Jan 2020028857.252.09$603
Dec 20192842059.012.30$2,620
Nov 2019042755.302.75$1,175
Oct 2019097753.472.42$2,363
Sep 2019381,31655.052.66$5,589
Aug 20194488553.112.30$4,376
Jul 2019080056.272.46$1,968
Jun 201901,28252.782.49$3,194
May 201901,91258.482.74$5,239
Apr 201901,91462.632.75$5,265
Mar 201902,48056.803.06$7,594
Feb 201902,47650.852.79$6,914
Jan 201902,81046.033.23$9,071
Dec 201802,81046.594.19$11,761
Nov 201802,56452.934.24$10,864
Oct 201802,40861.443.40$8,183
Sep 201802,06759.543.11$6,424
Aug 2018571,73959.403.07$8,719
Jul 201802,03365.142.93$5,961
Jun 201802,39060.183.08$7,354
May 201852,46265.382.90$7,469
Apr 201802,23263.842.90$6,475
Mar 201871,73361.222.79$5,258
Feb 201821,45861.782.77$4,157
Jan 2018552362.874.01$2,411
Dec 20171096057.272.92$3,377
Nov 2017591,25855.423.12$7,193
Oct 201701,57149.292.98$4,687
Sep 2017491,67847.523.09$7,509
Aug 201701,87945.373.00$5,645
Jul 2017511,94243.873.09$8,233
Jun 201751,88842.493.09$6,041
May 2017522,12745.373.26$9,300
Apr 2017572,17647.933.21$9,720
Mar 2017642,59846.772.98$10,745
Feb 2017672,48850.452.95$10,726
Jan 2017123,05849.413.42$11,048
Dec 2016112,73948.763.72$10,733
Nov 2016172,63442.492.64$7,688
Oct 2016522,90346.193.09$11,373
Sep 2016612,63041.553.10$10,689
Aug 2016162,98141.442.92$9,381
Jul 2016983,17641.622.92$13,366
Jun 2016224,02045.352.69$11,795
May 2016455,80442.521.99$13,469
Apr 2016665,33436.561.99$13,033
Mar 2016491033.011.79$1,765
Feb 20161751326.472.06$1,509
Jan 201681,26527.352.36$3,210
Dec 201503232.362.00$64
Nov 201501638.792.17$35
Oct 201501943.552.43$46
Sep 201501142.992.76$30
Aug 201502040.162.87$57
Jul 201501948.152.95$56
Jun 201502256.152.88$63
May 201501455.212.96$41
Apr 201501449.822.71$38
Mar 201501842.892.93$53
Feb 201503944.662.98$116
Jan 201506043.433.10$186
Dec 201402954.693.59$104
Nov 201402370.464.25$98
Oct 201402678.303.90$101
Sep 201402286.164.05$89
Aug 201401889.394.04$73
Jul 201404196.564.18$171
Jun 201401798.164.74$81
May 201402294.734.73$104
Apr 201405995.944.81$284
Mar 2014019595.895.06$986
Feb 2014040797.406.19$2,520
Jan 2014025290.404.86$1,225
Dec 2013012491.824.35$540
Nov 201302388.853.74$86
Oct 20130697.423.78$23
Sep 201307104.113.72$26
Aug 20131013104.253.52$1,088
Jul 201300102.523.72$0
Jun 2013171994.403.93$1,680
May 2013353994.834.15$3,481
Apr 2013536593.964.28$5,258
Mar 20137465893.623.91$9,503
Feb 2013641,23291.233.42$10,052
Jan 20130291.603.42$7
Dec 20120686.773.42$21
Nov 201202086.953.62$73
Oct 2012011889.383.40$401
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 2012096101.652.00$192
Mar 20128615105.052.22$2,207
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20114192.904.64$376
May 20117098.134.40$687
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 201019073.684.42$1,400
Jul 20100572.554.74$24
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20101341281.694.12$2,761
Mar 20102082078.394.39$5,167
Feb 20104651373.585.44$6,177
Jan 2010016574.365.96$984
Dec 2009020271.445.48$1,108
Nov 2009015574.593.75$581
Oct 2009020772.544.11$851
Sep 2009018665.543.06$570
Aug 2009027067.423.22$869
Jul 2009028461.133.46$984
Jun 2009027566.163.90$1,071
May 2009014354.743.93$561
Apr 200902446.773.59$86
Mar 2009213442.144.06$1,023
Feb 2009025732.814.63$1,191
Jan 20090035.865.37$0
Dec 200808337.105.98$496
Nov 2008040655.496.86$2,785
Oct 2008063475.246.92$4,389
Sep 200820585101.767.88$6,643
Aug 20080634114.228.48$5,378
Jul 20080652131.0811.39$7,426
Jun 20080517131.3313.03$6,738
May 20080556123.1711.57$6,435
Apr 20080614110.3110.45$6,419
Mar 200837656101.909.66$10,110
Feb 2008074092.538.77$6,490
Jan 2008193290.388.21$7,738
Dec 200711,15488.337.30$8,515
Nov 200751,50191.677.29$11,403
Oct 200751,39682.856.92$10,077
Sep 2007452,06675.846.24$16,313
Aug 200782,36669.066.39$15,666
Jul 200752,08970.906.39$13,699
Jun 200761,52962.007.55$11,914
May 200721,58558.747.85$12,554
Apr 2007121,69659.617.81$13,953
Mar 2007143,56756.927.30$26,843
Feb 200735,21355.108.22$42,995
Jan 200713,94350.306.73$26,574
Dec 200626,18556.656.92$42,904
Nov 2006376,02254.207.62$47,878
Oct 200685,94454.906.01$36,185
Sep 200635,80860.085.04$29,436
Aug 2006275,55868.717.34$42,650
Jul 200636,21569.376.34$39,628
Jun 200697,49766.286.38$48,456
May 2006116,90466.016.42$45,084
Apr 200632,91264.397.36$21,627
Mar 200602,50756.707.08$17,757
Feb 200601,63857.597.75$12,696
Jan 200611,28360.598.93$11,522
Dec 200502,28454.9413.42$30,641
Nov 20051053554.6910.59$6,212
Oct 2005602558.3413.80$3,845
Sep 2005499,14061.4512.08$113,413
Aug 200553824,83861.519.80$276,426

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   55 Mcf  × $  3.05 =       $168

────────────────────────────────────────────────────
Month total                                     $168

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/213630 is the state's own key, not one this site invented.