FINSTERWALD-DOBBS

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215065District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.6 M
Dec 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
246
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-10-13168963
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8,145 bbl$540,495
GasProduction321,076 Mcf$2,026,271
Total$2,566,767

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6182, -100.3203. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.61819, -100.32031 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,564 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,564 ft.

Completions filed
May 2013
1 of 1 wells

1 well

42-48331947605113,564 ftMay 2013

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (246)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

246 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 201953058.482.74$3,099
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 201878065.382.90$5,100
Apr 20180263.842.90$6
Mar 20180061.222.79$0
Feb 20180161.782.77$3
Jan 2018385562.874.01$3,617
Dec 2017247457.272.92$1,499
Nov 2017192855.423.12$2,949
Oct 2017951,08649.292.98$7,923
Sep 201711,41847.523.09$4,425
Aug 201711,45345.373.00$4,411
Jul 201711,69143.873.09$5,264
Jun 201721,55942.493.09$4,898
May 201771,41945.373.26$4,948
Apr 2017724447.933.21$1,119
Mar 20179125346.772.98$5,011
Feb 2017817350.452.95$914
Jan 2017940349.413.42$1,822
Dec 201663248.763.72$412
Nov 201672642.492.64$366
Oct 2016926146.193.09$1,222
Sep 2016437641.553.10$1,332
Aug 20169538441.442.92$5,060
Jul 2016045441.622.92$1,328
Jun 2016543745.352.69$1,400
May 2016024642.521.99$490
Apr 2016104136.561.99$447
Mar 20169835833.011.79$3,877
Feb 20161666626.472.06$1,798
Jan 2016201,21027.352.36$3,408
Dec 20151222132.362.00$831
Nov 2015971,55738.792.17$7,137
Oct 20155054343.552.43$3,495
Sep 2015331,27642.992.76$4,938
Aug 201501,10540.162.87$3,174
Jul 20152181448.152.95$3,408
Jun 201521,28156.152.88$3,805
May 2015058655.212.96$1,732
Apr 201501,10049.822.71$2,977
Mar 20157976442.892.93$5,630
Feb 201516370244.662.98$9,369
Jan 201551,40143.433.10$4,561
Dec 2014151054.693.59$1,886
Nov 2014140070.464.25$1,771
Oct 201411,17978.303.90$4,678
Sep 201431,68286.164.05$7,063
Aug 2014872,18989.394.04$16,610
Jul 201441,58696.564.18$7,015
Jun 2014121,81398.164.74$9,766
May 2014331,82894.734.73$11,766
Apr 2014911,14995.944.81$14,256
Mar 2014414995.895.06$4,179
Feb 20140097.406.19$0
Jan 201401,09190.404.86$5,303
Dec 201381,18191.824.35$5,877
Nov 2013037388.853.74$1,394
Oct 2013109097.423.78$10,619
Sep 201301,610104.113.72$5,986
Aug 201302,434104.253.52$8,574
Jul 2013803,896102.523.72$22,686
Jun 20131013,79194.403.93$24,446
May 2013834,04194.834.15$24,637
Apr 2013145893.964.28$2,055
Mar 2013137493.623.91$1,557
Feb 2013335891.233.42$1,498
Jan 20132452491.603.42$3,990
Dec 2012582786.773.42$3,262
Nov 2012149086.953.62$1,863
Oct 2012161889.383.40$2,190
Sep 201225994.672.92$2,393
Aug 2012098592.662.91$2,865
Jul 201211,14685.133.02$3,547
Jun 2012201,01879.822.52$4,161
May 2012341,09091.612.49$5,827
Apr 20121952101.652.00$2,003
Mar 201201,494105.052.22$3,320
Feb 2012391,592101.102.57$8,035
Jan 201211,06198.092.73$2,999
Dec 201101,17596.873.24$3,807
Nov 2011311,14695.723.31$6,762
Oct 201112,10784.983.65$7,772
Sep 201111,91583.623.99$7,716
Aug 20112529683.404.15$3,313
Jul 201131,73594.144.52$8,120
Jun 201101,33292.904.64$6,180
May 2011241,77698.134.40$10,178
Apr 201121352105.964.33$3,750
Mar 20114242096.364.06$5,751
Feb 201121,12085.644.18$4,853
Jan 201152,11786.504.59$10,147
Dec 2010281,34485.734.35$8,244
Nov 2010602,17380.843.80$13,098
Oct 20103173378.103.51$4,993
Sep 2010166472.633.98$2,715
Aug 20102659873.684.42$4,558
Jul 20102950172.554.74$4,477
Jun 20103054870.364.91$4,802
May 2010781871.124.24$3,962
Apr 20101694381.694.12$5,195
Mar 20102743278.394.39$4,012
Feb 2010154073.585.44$3,012
Jan 2010163574.365.96$3,862
Dec 20092868371.445.48$5,746
Nov 20092765774.593.75$4,479
Oct 20092669972.544.11$4,759
Sep 2009376065.543.06$2,526
Aug 2009091367.423.22$2,938
Jul 2009231,11361.133.46$5,262
Jun 20092092066.163.90$4,907
May 20091999854.743.93$4,958
Apr 2009271,12346.773.59$5,292
Mar 20093059942.144.06$3,696
Feb 20093590832.814.63$5,355
Jan 20091983435.865.37$5,161
Dec 20081114837.105.98$1,293
Nov 20082531555.496.86$3,548
Oct 20084287975.246.92$9,245
Sep 2008391,078101.767.88$12,460
Aug 200859956114.228.48$14,849
Jul 2008451,203131.0811.39$19,600
Jun 2008391,178131.3313.03$20,474
May 2008551,353123.1711.57$22,434
Apr 2008471,419110.3110.45$20,020
Mar 20084710,844101.909.66$109,586
Feb 2008771,67792.538.77$21,833
Jan 20085795290.388.21$12,964
Dec 2007211,82788.337.30$15,196
Nov 2007802,52791.677.29$25,760
Oct 20071392,73382.856.92$30,434
Sep 2007332,56375.846.24$18,507
Aug 2007413,05469.066.39$22,340
Jul 2007483,11170.906.39$23,276
Jun 2007463,08862.007.55$26,162
May 20071233,00758.747.85$30,819
Apr 2007453,20359.617.81$27,683
Mar 20072234,34956.927.30$44,449
Feb 2007602,86155.108.22$26,812
Jan 20071853,95350.306.73$35,897
Dec 2006844,80356.656.92$37,988
Nov 20061245,32054.207.62$47,246
Oct 20061216,86454.906.01$47,922
Sep 20062637,51860.085.04$53,671
Aug 20062058,76368.717.34$78,405
Jul 200632611,70369.376.34$96,844
Jun 200614312,91566.286.38$91,926
May 200618012,76166.016.42$93,871
Apr 200629713,24164.397.36$116,584
Mar 200629716,14856.707.08$131,215
Feb 200660418,05257.597.75$174,708
Jan 20061,04632,88960.598.93$357,185
Dec 20052964,59654.9413.42$77,919

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2019 — as filed, then multipliedworked
Condensate            53 bbl  × $ 58.48 =     $3,099
Gas                    0 Mcf  × $  2.74 =         $0

────────────────────────────────────────────────────
Month total                                   $3,099

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/215065 is the state's own key, not one this site invented.