FINSTERWALD DOBBS

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235161District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.0 M
Jan 2008 – May 2026
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
221
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-30183617
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10,349 bbl$837,003
GasProduction383,614 Mcf$2,132,798
Total$2,969,801

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6132, -100.3225. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.61317, -100.32253 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,644 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,644 ft.

Completions filed
Apr 2013
1 of 1 wells

1 well

42-48332467851A13,644 ftApr 2013

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (221)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

221 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 2025164063.933.01$10,485
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 202006438.371.83$117
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 2020013130.341.86$243
Feb 2020011549.881.98$228
Jan 2020025957.252.09$543
Dec 201906659.012.30$152
Nov 2019021455.302.75$589
Oct 2019014053.472.42$339
Sep 2019062355.052.66$1,655
Aug 2019037253.112.30$857
Jul 2019037656.272.46$925
Jun 201908352.782.49$207
May 20193367058.482.74$19,841
Apr 201905262.632.75$143
Mar 2019023256.803.06$710
Feb 2019012750.852.79$355
Jan 20196746.033.23$299
Dec 2018321046.594.19$1,019
Nov 20183952.934.24$197
Oct 2018160161.443.40$2,104
Sep 201801,17559.543.11$3,652
Aug 201831,85959.403.07$5,879
Jul 201802,47265.142.93$7,248
Jun 2018097360.183.08$2,994
May 201811585065.382.90$9,984
Apr 201801,11863.842.90$3,243
Mar 2018251,30861.222.79$5,176
Feb 2018011461.782.77$315
Jan 2018447262.874.01$2,144
Dec 2017569457.272.92$2,314
Nov 2017691855.423.12$3,195
Oct 20171041,01649.292.98$8,158
Sep 201741,09047.523.09$3,555
Aug 201731,16745.373.00$3,642
Jul 201741,17743.873.09$3,809
Jun 201741,18242.493.09$3,819
May 201771,14445.373.26$4,051
Apr 2017691747.933.21$3,233
Mar 20179183946.772.98$6,759
Feb 2017873650.452.95$2,577
Jan 2017884249.413.42$3,274
Dec 2016361348.763.72$2,428
Nov 201651,14842.492.64$3,248
Oct 201681,15646.193.09$3,942
Sep 201661,17241.553.10$3,883
Aug 20161051,23541.442.92$7,963
Jul 2016101,26641.622.92$4,118
Jun 2016101,30245.352.69$3,950
May 2016111,24642.521.99$2,949
Apr 2016101,17836.561.99$2,711
Mar 20161151,33333.011.79$6,188
Feb 2016101,24326.472.06$2,830
Jan 201681,56727.352.36$3,924
Dec 2015141,42132.362.00$3,297
Nov 20151331,10938.792.17$7,563
Oct 20151068643.552.43$2,100
Sep 2015121,36542.992.76$4,281
Aug 201501,26840.162.87$3,642
Jul 2015131,22848.152.95$4,243
Jun 2015101,30356.152.88$4,318
May 201501,44255.212.96$4,262
Apr 201591,21949.822.71$3,748
Mar 20151321,45142.892.93$9,920
Feb 20152481,04244.662.98$14,177
Jan 2015121,20943.433.10$4,270
Dec 201461,30554.693.59$5,015
Nov 201451,51270.464.25$6,781
Oct 2014111,73578.303.90$7,629
Sep 201482,05186.164.05$8,986
Aug 20141312,20889.394.04$20,620
Jul 2014152,40596.564.18$11,500
Jun 2014222,41898.164.74$13,613
May 2014331,54494.734.73$10,424
Apr 20141692,41695.944.81$27,833
Mar 2014482,74695.895.06$18,489
Feb 201401,13597.406.19$7,028
Jan 201401,39590.404.86$6,781
Dec 20131551,73191.824.35$21,770
Nov 201302,93588.853.74$10,972
Oct 20132152,82397.423.78$31,614
Sep 201302,774104.113.72$10,313
Aug 201303,333104.253.52$11,741
Jul 2013704,115102.523.72$22,475
Jun 2013962,65494.403.93$19,502
May 2013952,62394.834.15$19,892
Apr 20131224593.964.28$2,177
Mar 201302793.623.91$106
Feb 2013233191.233.42$1,314
Jan 2013611,64691.603.42$11,217
Dec 201202,33186.773.42$7,972
Nov 201202,31486.953.62$8,388
Oct 201202,39789.383.40$8,149
Sep 2012753294.672.92$7,194
Aug 201202,39492.662.91$6,962
Jul 201202,22185.133.02$6,709
Jun 2012383,01579.822.52$10,628
May 2012622,42391.612.49$11,709
Apr 201202,430101.652.00$4,852
Mar 201202,646105.052.22$5,880
Feb 2012712,404101.102.57$13,357
Jan 201201,83098.092.73$5,003
Dec 201102,12196.873.24$6,871
Nov 2011572,00995.723.31$12,108
Oct 201102,70184.983.65$9,855
Sep 201102,71683.623.99$10,825
Aug 2011602,64383.404.15$15,971
Jul 201132,84894.144.52$13,148
Jun 201102,77292.904.64$12,862
May 2011642,63898.134.40$17,900
Apr 2011832,352105.964.33$18,987
Mar 20111083,66196.364.06$25,261
Feb 2011132,69985.644.18$12,395
Jan 2011202,53286.504.59$13,349
Dec 2010742,47385.734.35$17,096
Nov 20101072,33480.843.80$17,508
Oct 20101202,40378.103.51$17,804
Sep 2010172,32872.633.98$10,499
Aug 20101152,28973.684.42$18,589
Jul 20101242,32072.554.74$19,985
Jun 20101362,33970.364.91$21,054
May 2010292,59571.124.24$13,053
Apr 2010442,57981.694.12$14,227
Mar 20101452,53778.394.39$22,501
Feb 2010521,99773.585.44$14,695
Jan 2010362,50574.365.96$17,617
Dec 20091703,08071.445.48$29,035
Nov 20091642,67574.593.75$22,268
Oct 20091802,86872.544.11$24,845
Sep 2009572,89765.543.06$12,614
Aug 200906,22767.423.22$20,042
Jul 20091997,63161.133.46$38,602
Jun 20091837,10366.163.90$39,773
May 20092097,66554.743.93$41,532
Apr 2009617,45646.773.59$29,601
Mar 20091716,77542.144.06$34,706
Feb 20091635,26232.814.63$29,727
Jan 20091586,48735.865.37$40,508
Dec 20081354,66237.105.98$32,874
Nov 20081555,12855.496.86$43,781
Oct 20081703,91775.246.92$39,904
Sep 20081764,352101.767.88$52,191
Aug 20083055,054114.228.48$77,710
Jul 20082035,839131.0811.39$93,112
Jun 20082066,495131.3313.03$111,701
May 20083519,033123.1711.57$147,783
Apr 200836413,213110.3110.45$178,293
Mar 200870017,867101.909.66$243,998
Feb 200878636,41792.538.77$392,127
Jan 200847215,56090.388.21$170,341

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2025 — as filed, then multipliedworked
Condensate           164 bbl  × $ 63.93 =    $10,485
Gas                    0 Mcf  × $  3.01 =         $0

────────────────────────────────────────────────────
Month total                                  $10,485

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/235161 is the state's own key, not one this site invented.