HEFLEY

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219954District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.7 M
Feb 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
244
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-12-07170411
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,398 bbl$245,574
GasProduction449,245 Mcf$2,450,831
Total$2,696,404

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6729, -100.2763. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.67290, -100.27625 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,880 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,880 ft.

Completions filed
Feb 2006
1 of 1 wells

1 well

42-211332614108 P11,880 ftFeb 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (244)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

244 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202328085.443.09$2,392
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 2020037234.901.69$629
May 2020038416.921.81$697
Apr 2020037214.751.80$671
Mar 2020038430.341.86$713
Feb 2020036049.881.98$713
Jan 2020038457.252.09$804
Dec 2019038459.012.30$885
Nov 2019037255.302.75$1,023
Oct 2019038453.472.42$929
Sep 2019037255.052.66$989
Aug 2019038453.112.30$885
Jul 2019038456.272.46$945
Jun 2019037252.782.49$927
May 2019038458.482.74$1,052
Apr 2019040862.632.75$1,122
Mar 2019048256.803.06$1,476
Feb 2019050950.852.79$1,421
Jan 2019062046.033.23$2,001
Dec 2018060546.594.19$2,532
Nov 2018072452.934.24$3,068
Oct 2018087261.443.40$2,963
Sep 2018073459.543.11$2,281
Aug 201801,05459.403.07$3,232
Jul 201801,16365.142.93$3,410
Jun 201801,25660.183.08$3,865
May 201801,32665.382.90$3,846
Apr 201801,43963.842.90$4,174
Mar 201801,62461.222.79$4,526
Feb 201801,25561.782.77$3,471
Jan 201801,65362.874.01$6,627
Dec 2017671,70757.272.92$8,824
Nov 201701,57255.423.12$4,902
Oct 201701,67549.292.98$4,998
Sep 201701,78747.523.09$5,517
Aug 201711,95045.373.00$5,904
Jul 201722,38243.873.09$7,442
Jun 201702,18942.493.09$6,758
May 201722,24545.373.26$7,417
Apr 201702,08847.933.21$6,706
Mar 201732,12946.772.98$6,493
Feb 201711,85450.452.95$5,525
Jan 201741,98449.413.42$6,981
Dec 201602,08248.763.72$7,751
Nov 201601,70342.492.64$4,503
Oct 201601,50046.193.09$4,635
Sep 201601,52841.553.10$4,738
Aug 201601,54441.442.92$4,515
Jul 20161891,47941.622.92$12,191
Jun 201601,50145.352.69$4,031
May 201601,50542.521.99$2,997
Apr 201601,44236.561.99$2,871
Mar 201601,37033.011.79$2,458
Feb 201601,30726.472.06$2,697
Jan 201601,52527.352.36$3,606
Dec 201501,44232.362.00$2,886
Nov 201501,39438.792.17$3,021
Oct 201501,51043.552.43$3,664
Sep 201501,51142.992.76$4,168
Aug 201501,59740.162.87$4,587
Jul 201501,56348.152.95$4,603
Jun 201501,61556.152.88$4,656
May 201501,75055.212.96$5,172
Apr 201501,33349.822.71$3,608
Mar 201501,23642.892.93$3,627
Feb 201501,56544.662.98$4,658
Jan 201501,34243.433.10$4,161
Dec 201401,27254.693.59$4,568
Nov 201401,27070.464.25$5,400
Oct 201401,36578.303.90$5,325
Sep 201401,23286.164.05$4,984
Aug 201401,37889.394.04$5,560
Jul 20141871,37496.564.18$23,799
Jun 201401,22198.164.74$5,784
May 201401,36594.734.73$6,452
Apr 201401,48895.944.81$7,156
Mar 201401,53795.895.06$7,772
Feb 201401,27797.406.19$7,907
Jan 201401,40990.404.86$6,849
Dec 201301,38891.824.35$6,044
Nov 201301,68488.853.74$6,295
Oct 201301,69297.423.78$6,395
Sep 201301,454104.113.72$5,406
Aug 201311,728104.253.52$6,191
Jul 201301,759102.523.72$6,540
Jun 201301,68294.403.93$6,616
May 201321,71794.834.15$7,314
Apr 201311,65493.964.28$7,177
Mar 201301,59593.623.91$6,241
Feb 201311,34691.233.42$4,694
Jan 201321,71191.603.42$6,035
Dec 20121861,77486.773.42$22,207
Nov 201202,03386.953.62$7,370
Oct 201201,80289.383.40$6,126
Sep 201201,90494.672.92$5,557
Aug 201242,24792.662.91$6,905
Jul 201202,23285.133.02$6,742
Jun 201222,16279.822.52$5,606
May 201222,22991.612.49$5,730
Apr 201202,110101.652.00$4,213
Mar 201202,020105.052.22$4,489
Feb 201201,983101.102.57$5,097
Jan 201202,06398.092.73$5,640
Dec 201102,07096.873.24$6,706
Nov 201102,04195.723.31$6,758
Oct 201102,24084.983.65$8,173
Sep 201102,21683.623.99$8,833
Aug 201102,27983.404.15$9,456
Jul 201102,32894.144.52$10,516
Jun 201102,27892.904.64$10,570
May 201102,38398.134.40$10,497
Apr 201101,884105.964.33$8,164
Mar 201101,78396.364.06$7,234
Feb 20111671,94085.644.18$22,411
Jan 201102,52686.504.59$11,591
Dec 201002,53585.734.35$11,022
Nov 201002,34180.843.80$8,885
Oct 201002,62278.103.51$9,200
Sep 201002,49672.633.98$9,933
Aug 201002,80673.684.42$12,401
Jul 201002,73372.554.74$12,945
Jun 201002,93170.364.91$14,392
May 201003,10471.124.24$13,146
Apr 20101842,97381.694.12$27,288
Mar 201002,72878.394.39$11,972
Feb 201002,52573.585.44$13,742
Jan 201002,85674.365.96$17,033
Dec 200902,65671.445.48$14,565
Nov 200902,46874.593.75$9,259
Oct 200902,34472.544.11$9,634
Sep 200901,86765.543.06$5,722
Aug 200903,16867.423.22$10,196
Jul 200902,98861.133.46$10,352
Jun 20091822,93366.163.90$23,465
May 200902,82654.743.93$11,094
Apr 200902,79146.773.59$10,013
Mar 200902,88142.144.06$11,694
Feb 200902,61932.814.63$12,134
Jan 200902,60235.865.37$13,975
Dec 200802,04437.105.98$12,217
Nov 200802,46755.496.86$16,925
Oct 200802,97675.246.92$20,600
Sep 200802,741101.767.88$21,591
Aug 200802,919114.228.48$24,762
Jul 20081823,257131.0811.39$60,952
Jun 200803,134131.3313.03$40,844
May 200803,444123.1711.57$39,862
Apr 200803,275110.3110.45$34,240
Mar 200803,296101.909.66$31,853
Feb 20081613,20692.538.77$43,016
Jan 200803,09390.388.21$25,380
Dec 200703,37588.337.30$24,644
Nov 200703,64791.677.29$26,593
Oct 200703,46682.856.92$23,992
Sep 200703,47875.846.24$21,717
Aug 20071653,90569.066.39$36,340
Jul 200703,89470.906.39$24,875
Jun 200703,96562.007.55$29,930
May 20071894,26458.747.85$44,558
Apr 200704,30059.617.81$33,562
Mar 200704,96856.927.30$36,276
Feb 20071934,44755.108.22$47,171
Jan 200705,37650.306.73$36,164
Dec 200605,83856.656.92$40,390
Nov 200606,05254.207.62$46,101
Oct 200606,79854.906.01$40,882
Sep 200606,84360.085.04$34,470
Aug 20061817,86668.717.34$70,172
Jul 200608,29869.376.34$52,632
Jun 20061898,72066.286.38$68,194
May 200618610,77766.016.42$81,520
Apr 200637113,40364.397.36$122,541
Mar 2006019,07156.707.08$135,078
Feb 200636338,80257.597.75$321,664

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            28 bbl  × $ 85.44 =     $2,392
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $2,392

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/219954 is the state's own key, not one this site invented.