HEFLEY

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228059District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.5 M
Mar 2007 – May 2026
Value, last 12 filed months
$27 k
at the published price for each month
Months reported
231
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-09-27174538
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,451 bbl$327,793
GasProduction609,794 Mcf$3,217,623
Total$3,545,416

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6717, -100.2741. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.67168, -100.27414 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,876 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,876 ft.

Completions filed
Mar 2007
1 of 1 wells

1 well

42-211336924124P11,876 ftMar 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (231)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

231 months

May 202600106.413.05$0
Apr 2026059498.932.87$1,705
Mar 2026069489.753.15$2,186
Feb 2026062963.503.75$2,359
Jan 2026062059.138.00$4,959
Dec 2025071356.664.41$3,147
Nov 2025067658.593.93$2,654
Oct 2025071759.383.30$2,370
Sep 2025069462.743.08$2,135
Aug 2025056963.933.01$1,715
Jul 2025064666.743.32$2,142
Jun 2025062266.483.13$1,946
May 2025064160.553.23$2,072
Apr 2025060962.363.54$2,158
Mar 2025063667.704.27$2,715
Feb 2025054570.884.34$2,366
Jan 2025063274.324.28$2,704
Dec 2024063668.993.12$1,985
Nov 2024071369.052.20$1,567
Oct 2024071171.372.28$1,622
Sep 2024069169.612.36$1,634
Aug 202418772575.632.06$15,639
Jul 2024075279.932.15$1,614
Jun 2024069978.082.63$1,841
May 2024072578.812.20$1,594
Apr 2024075884.451.66$1,258
Mar 2024073180.301.55$1,129
Feb 2024080576.091.78$1,436
Jan 2024060873.023.30$2,005
Dec 2023077771.262.61$2,029
Nov 2023075077.892.81$2,106
Oct 2023177585.443.09$2,478
Sep 2023075989.042.74$2,076
Aug 2023075280.522.67$2,010
Jul 2023077174.852.64$2,037
Jun 2023075868.962.26$1,712
May 2023080470.622.23$1,791
Apr 2023177878.122.24$1,819
Mar 2023081472.852.39$1,948
Feb 2023066375.112.47$1,635
Jan 2023077076.533.39$2,609
Dec 2022069376.415.73$3,970
Nov 2022079685.005.65$4,494
Oct 2022084187.185.86$4,931
Sep 2022182384.888.16$6,804
Aug 2022083594.529.13$7,621
Jul 20220809101.587.54$6,102
Jun 20220837115.097.98$6,677
May 20220859109.378.43$7,244
Apr 202200104.226.84$0
Mar 20220923108.885.08$4,686
Feb 2022172991.054.86$3,633
Jan 2022079281.844.54$3,594
Dec 2021085571.323.90$3,334
Nov 2021084277.435.24$4,409
Oct 2021087279.795.71$4,982
Sep 2021085569.865.35$4,575
Aug 2021089666.024.22$3,782
Jul 202101,27870.783.98$5,089
Jun 202101,25269.493.38$4,233
May 202101,31863.483.02$3,977
Apr 202101,33760.362.76$3,688
Mar 202101,55861.302.72$4,233
Feb 2021058257.805.55$3,229
Jan 202101,34150.412.81$3,769
Dec 202001,26644.642.68$3,387
Nov 202001,29638.772.71$3,508
Oct 20201901,30536.972.48$10,259
Sep 202011,30937.091.99$2,643
Aug 202011,40739.982.39$3,396
Jul 202001,33138.371.83$2,429
Jun 202001,34234.901.69$2,268
May 202001,38616.921.81$2,515
Apr 202001,35214.751.80$2,440
Mar 202001,40030.341.86$2,599
Feb 202001,39249.881.98$2,757
Jan 202001,06457.252.09$2,229
Dec 201901,22159.012.30$2,814
Nov 201901,12855.302.75$3,103
Oct 201901,23753.472.42$2,992
Sep 201901,39455.052.66$3,704
Aug 201901,50053.112.30$3,457
Jul 201901,49956.272.46$3,688
Jun 201901,48852.782.49$3,707
May 201901,53358.482.74$4,201
Apr 201901,41962.632.75$3,903
Mar 201901,52356.803.06$4,664
Feb 201901,13050.852.79$3,155
Jan 201901,45746.033.23$4,703
Dec 201801,49146.594.19$6,240
Nov 201801,47352.934.24$6,241
Oct 201801,59161.443.40$5,406
Sep 201801,56359.543.11$4,858
Aug 201801,58259.403.07$4,851
Jul 201801,59365.142.93$4,670
Jun 201801,45960.183.08$4,489
May 201801,45465.382.90$4,218
Apr 201801,56063.842.90$4,525
Mar 201801,62661.222.79$4,531
Feb 20181621,40761.782.77$13,900
Jan 201801,49562.874.01$5,994
Dec 201701,61857.272.92$4,727
Nov 201721,59655.423.12$5,088
Oct 201701,74949.292.98$5,218
Sep 201701,72047.523.09$5,310
Aug 201711,80145.373.00$5,456
Jul 201722,01443.873.09$6,306
Jun 201732,05442.493.09$6,469
May 201721,95545.373.26$6,471
Apr 201721,80547.933.21$5,893
Mar 201781,87346.772.98$5,963
Feb 201711,67650.452.95$4,999
Jan 201721,83849.413.42$6,383
Dec 201601,71748.763.72$6,392
Nov 201601,45642.492.64$3,850
Oct 201601,60046.193.09$4,944
Sep 201601,57841.553.10$4,893
Aug 201601,65841.442.92$4,849
Jul 201601,70641.622.92$4,989
Jun 201601,48145.352.69$3,978
May 201601,63242.521.99$3,249
Apr 201601,57336.561.99$3,132
Mar 20161861,60333.011.79$9,016
Feb 201601,48426.472.06$3,062
Jan 201601,60927.352.36$3,804
Dec 201501,53732.362.00$3,076
Nov 201501,54738.792.17$3,353
Oct 201501,64343.552.43$3,987
Sep 201501,71442.992.76$4,728
Aug 201501,81340.162.87$5,208
Jul 201501,85348.152.95$5,457
Jun 201501,77256.152.88$5,108
May 201501,83355.212.96$5,417
Apr 201501,74549.822.71$4,723
Mar 20151731,87942.892.93$12,934
Feb 201501,99344.662.98$5,932
Jan 201501,93443.433.10$5,997
Dec 201401,87954.693.59$6,748
Nov 201401,81070.464.25$7,696
Oct 201401,96378.303.90$7,658
Sep 201401,89386.164.05$7,658
Aug 201401,99389.394.04$8,042
Jul 201401,97596.564.18$8,255
Jun 201401,82498.164.74$8,640
May 201402,07194.734.73$9,789
Apr 201402,05395.944.81$9,873
Mar 201401,91795.895.06$9,694
Feb 20141921,59197.406.19$28,552
Jan 201402,24490.404.86$10,907
Dec 201301,99191.824.35$8,670
Nov 201302,23888.853.74$8,366
Oct 201302,19397.423.78$8,288
Sep 201302,054104.113.72$7,636
Aug 201312,338104.253.52$8,340
Jul 201302,394102.523.72$8,900
Jun 201302,32094.403.93$9,126
May 201322,36594.834.15$10,002
Apr 201322,35093.964.28$10,252
Mar 201312,36493.623.91$9,344
Feb 201322,00391.233.42$7,033
Jan 201352,49391.603.42$8,984
Dec 201202,45686.773.42$8,400
Nov 201202,44286.953.62$8,852
Oct 20121922,45789.383.40$25,514
Sep 20121962,41494.672.92$25,600
Aug 201242,81792.662.91$8,563
Jul 201202,69385.133.02$8,135
Jun 201222,71579.822.52$6,999
May 201222,50991.612.49$6,426
Apr 201202,640101.652.00$5,272
Mar 201202,530105.052.22$5,622
Feb 201202,482101.102.57$6,379
Jan 201202,81198.092.73$7,686
Dec 201102,87996.873.24$9,327
Nov 201102,59795.723.31$8,599
Oct 201102,89684.983.65$10,566
Sep 20111582,77283.623.99$24,261
Aug 201102,32283.404.15$9,635
Jul 201102,80294.144.52$12,657
Jun 201102,70692.904.64$12,556
May 201103,05198.134.40$13,439
Apr 201102,809105.964.33$12,172
Mar 201102,30796.364.06$9,360
Feb 20111702,17485.644.18$23,646
Jan 201102,93286.504.59$13,454
Dec 201003,17885.734.35$13,817
Nov 201003,09380.843.80$11,739
Oct 201003,22778.103.51$11,323
Sep 201003,21372.633.98$12,786
Aug 201003,21573.684.42$14,208
Jul 201003,25172.554.74$15,398
Jun 201003,38270.364.91$16,607
May 201003,66371.124.24$15,514
Apr 20101673,57681.694.12$28,385
Mar 201003,77578.394.39$16,567
Feb 201003,37573.585.44$18,368
Jan 201003,94374.365.96$23,516
Dec 200903,66971.445.48$20,120
Nov 20091694,10874.593.75$28,017
Oct 200904,40672.544.11$18,110
Sep 200903,90265.543.06$11,959
Aug 200903,92567.423.22$12,633
Jul 200904,66661.133.46$16,165
Jun 200904,67766.163.90$18,217
May 200904,90254.743.93$19,244
Apr 200904,85946.773.59$17,432
Mar 20091854,97742.144.06$27,998
Feb 200904,75032.814.63$22,007
Jan 200905,27635.865.37$28,337
Dec 200805,42837.105.98$32,444
Nov 200805,58055.496.86$38,281
Oct 200805,97675.246.92$41,366
Sep 20081905,921101.767.88$65,975
Aug 200806,428114.228.48$54,529
Jul 200806,559131.0811.39$74,703
Jun 200806,264131.3313.03$81,636
May 20081866,910123.1711.57$102,888
Apr 200807,086110.3110.45$74,083
Mar 20081877,619101.909.66$92,686
Feb 200807,21592.538.77$63,280
Jan 200807,97290.388.21$65,416
Dec 200708,83488.337.30$64,506
Nov 20071739,24191.677.29$83,242
Oct 200713810,45982.856.92$83,830
Sep 2007010,84275.846.24$67,699
Aug 200711511,74269.066.39$82,949
Jul 200717513,63970.906.39$99,533
Jun 200736315,96062.007.55$142,979
May 200718120,94358.747.85$174,957
Apr 200718125,11059.617.81$206,778
Mar 200718532,91256.927.30$250,853

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                  594 Mcf  × $  2.87 =     $1,705

────────────────────────────────────────────────────
Month total                                   $1,705

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/228059 is the state's own key, not one this site invented.