HEFLEY

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219957District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.1 M
Mar 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
243
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-12-07170410
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,002 bbl$217,406
GasProduction302,664 Mcf$1,921,932
Total$2,139,337

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6743, -100.2844. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.67432, -100.28438 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,885 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,885 ft.

Completions filed
Mar 2006
1 of 1 wells

1 well

42-211334774119P11,885 ftMar 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (243)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

243 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202325085.443.09$2,136
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 2016804726.472.06$2,215
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 201508742.992.76$240
Aug 2015017540.162.87$503
Jul 2015010848.152.95$318
Jun 201506556.152.88$187
May 2015016355.212.96$482
Apr 2015011949.822.71$322
Mar 2015037342.892.93$1,095
Feb 2015059544.662.98$1,771
Jan 2015028243.433.10$874
Dec 2014025254.693.59$905
Nov 2014030670.464.25$1,301
Oct 2014037678.303.90$1,467
Sep 2014043786.164.05$1,768
Aug 201417750889.394.04$17,872
Jul 2014039296.564.18$1,638
Jun 2014043598.164.74$2,061
May 2014050694.734.73$2,392
Apr 2014052595.944.81$2,525
Mar 2014054495.895.06$2,751
Feb 201419240497.406.19$21,202
Jan 2014039790.404.86$1,930
Dec 2013060391.824.35$2,626
Nov 2013034688.853.74$1,293
Oct 2013092897.423.78$3,507
Sep 201301,103104.113.72$4,101
Aug 201301,106104.253.52$3,896
Jul 201301,193102.523.72$4,435
Jun 201301,01394.403.93$3,985
May 2013095894.834.15$3,975
Apr 201301,05993.964.28$4,535
Mar 201301,07093.623.91$4,187
Feb 2013091091.233.42$3,112
Jan 2013094091.603.42$3,215
Dec 2012089486.773.42$3,058
Nov 2012097386.953.62$3,527
Oct 201201,20789.383.40$4,103
Sep 201201,20494.672.92$3,514
Aug 201241,20192.662.91$3,863
Jul 201201,33985.133.02$4,045
Jun 201221,42279.822.52$3,742
May 201221,47791.612.49$3,858
Apr 201201,454101.652.00$2,903
Mar 201201,249105.052.22$2,775
Feb 201201,417101.102.57$3,642
Jan 201201,45798.092.73$3,984
Dec 201101,44596.873.24$4,681
Nov 201101,91295.723.31$6,331
Oct 20111351,82284.983.65$18,120
Sep 201101,86183.623.99$7,418
Aug 201101,97083.404.15$8,174
Jul 201101,50394.144.52$6,789
Jun 201101,44492.904.64$6,700
May 201101,44698.134.40$6,369
Apr 201101,307105.964.33$5,664
Mar 2011093196.364.06$3,777
Feb 2011098385.644.18$4,109
Jan 201101,51986.504.59$6,970
Dec 201001,38985.734.35$6,039
Nov 201001,24580.843.80$4,725
Oct 20101931,45378.103.51$20,172
Sep 201001,33572.633.98$5,313
Aug 201001,28473.684.42$5,674
Jul 201001,05472.554.74$4,992
Jun 2010067970.364.91$3,334
May 2010059871.124.24$2,533
Apr 2010054381.694.12$2,239
Mar 2010053378.394.39$2,339
Feb 2010041273.585.44$2,242
Jan 2010043874.365.96$2,612
Dec 2009029671.445.48$1,623
Nov 2009026974.593.75$1,009
Oct 2009020072.544.11$822
Sep 200901,68065.543.06$5,149
Aug 200901,84567.423.22$5,938
Jul 200902,27561.133.46$7,882
Jun 200902,42866.163.90$9,457
May 200902,58554.743.93$10,148
Apr 200902,53546.773.59$9,094
Mar 200902,54742.144.06$10,338
Feb 200902,31632.814.63$10,730
Jan 200902,80135.865.37$15,044
Dec 20081792,53437.105.98$21,787
Nov 200802,63455.496.86$18,070
Oct 200803,05575.246.92$21,147
Sep 200803,111101.767.88$24,506
Aug 200803,397114.228.48$28,817
Jul 200803,545131.0811.39$40,376
Jun 20081863,509131.3313.03$70,159
May 200803,734123.1711.57$43,218
Apr 200803,655110.3110.45$38,213
Mar 200803,604101.909.66$34,829
Feb 200803,30792.538.77$29,004
Jan 200803,19090.388.21$26,176
Dec 20071833,45988.337.30$41,422
Nov 200703,80091.677.29$27,708
Oct 200704,06082.856.92$28,103
Sep 200704,16975.846.24$26,032
Aug 20071784,54269.066.39$41,307
Jul 200705,09270.906.39$32,527
Jun 200705,00062.007.55$37,742
May 200705,21558.747.85$40,918
Apr 20071795,35359.617.81$52,451
Mar 200705,75056.927.30$41,986
Feb 200705,07655.108.22$41,704
Jan 200705,79350.306.73$38,969
Dec 200606,48056.656.92$44,831
Nov 20061816,80754.207.62$61,662
Oct 200607,73154.906.01$46,493
Sep 20061838,35860.085.04$53,096
Aug 200609,51468.717.34$69,832
Jul 2006010,50669.376.34$66,637
Jun 20061859,88266.286.38$75,347
May 200636312,97066.016.42$107,294
Apr 200637518,15464.397.36$157,768
Mar 2006031,17656.707.08$220,817

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            25 bbl  × $ 85.44 =     $2,136
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $2,136

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/219957 is the state's own key, not one this site invented.