HEFLEY

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 230926District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.6 M
Jul 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-12-18177081
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6,008 bbl$501,595
GasProduction540,834 Mcf$3,131,987
Total$3,633,582

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6712, -100.2862. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.67116, -100.28623 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,880 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,880 ft.

Completions filed
Jul 2007
1 of 1 wells

1 well

42-211336494121P11,880 ftJul 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202340085.443.09$3,418
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 2018038446.594.19$1,607
Nov 2018037252.934.24$1,576
Oct 2018038461.443.40$1,305
Sep 2018037259.543.11$1,156
Aug 2018038459.403.07$1,178
Jul 2018038465.142.93$1,126
Jun 2018037260.183.08$1,145
May 2018038465.382.90$1,114
Apr 2018037263.842.90$1,079
Mar 2018038461.222.79$1,070
Feb 2018034761.782.77$960
Jan 2018038462.874.01$1,540
Dec 2017038457.272.92$1,122
Nov 2017037255.423.12$1,160
Oct 2017038449.292.98$1,146
Sep 2017037247.523.09$1,148
Aug 2017038445.373.00$1,154
Jul 2017038443.873.09$1,186
Jun 2017037242.493.09$1,148
May 2017038445.373.26$1,253
Apr 2017237247.933.21$1,291
Mar 2017997046.772.98$3,315
Feb 2017082650.452.95$2,439
Jan 2017196449.413.42$3,345
Dec 201601,01948.763.72$3,794
Nov 2016068142.492.64$1,801
Oct 2016073646.193.09$2,274
Sep 2016073641.553.10$2,282
Aug 2016072141.442.92$2,108
Jul 2016070541.622.92$2,062
Jun 2016067045.352.69$1,800
May 2016067142.521.99$1,336
Apr 2016063036.561.99$1,254
Mar 2016064233.011.79$1,152
Feb 201612345326.472.06$4,191
Jan 2016062127.352.36$1,468
Dec 2015056732.362.00$1,135
Nov 2015058238.792.17$1,261
Oct 2015051643.552.43$1,252
Sep 2015051042.992.76$1,407
Aug 2015076140.162.87$2,186
Jul 2015091448.152.95$2,692
Jun 2015093056.152.88$2,681
May 201501,18355.212.96$3,496
Apr 2015281,35049.822.71$5,049
Mar 201501,65542.892.93$4,857
Feb 201501,72844.662.98$5,143
Jan 201501,35043.433.10$4,186
Dec 201401,73754.693.59$6,238
Nov 201401,79370.464.25$7,624
Oct 201401,82778.303.90$7,127
Sep 201401,87386.164.05$7,577
Aug 201401,99489.394.04$8,046
Jul 201402,17296.564.18$9,078
Jun 201401,89698.164.74$8,981
May 201402,27594.734.73$10,753
Apr 20141932,09995.944.81$28,611
Mar 201402,16395.895.06$10,938
Feb 201401,72797.406.19$10,694
Jan 201402,22390.404.86$10,805
Dec 201302,04591.824.35$8,905
Nov 201302,20588.853.74$8,243
Oct 20131962,43597.423.78$28,297
Sep 201302,362104.113.72$8,781
Aug 201312,527104.253.52$9,006
Jul 201302,545102.523.72$9,462
Jun 201302,43494.403.93$9,574
May 201322,38894.834.15$10,098
Apr 201322,66993.964.28$11,618
Mar 201312,83793.623.91$11,194
Feb 201301,58291.233.42$5,410
Jan 201302,81291.603.42$9,617
Dec 201202,81186.773.42$9,614
Nov 201202,86186.953.62$10,371
Oct 20121883,01989.383.40$27,067
Sep 20121812,89094.672.92$25,569
Aug 201243,05192.662.91$9,243
Jul 201203,15285.133.02$9,522
Jun 201222,92579.822.52$7,528
May 201222,88391.612.49$7,357
Apr 201202,758101.652.00$5,507
Mar 20121792,729105.052.22$24,868
Feb 201202,569101.102.57$6,603
Jan 201203,07098.092.73$8,394
Dec 201102,25596.873.24$7,306
Nov 20111963,07295.723.31$28,933
Oct 201103,43284.983.65$12,522
Sep 201103,72083.623.99$14,827
Aug 201103,21183.404.15$13,323
Jul 201103,69094.144.52$16,669
Jun 20111883,47192.904.64$33,570
May 201103,56298.134.40$15,690
Apr 201103,544105.964.33$15,357
Mar 201102,54796.364.06$10,334
Feb 20111652,58885.644.18$24,948
Jan 201103,74386.504.59$17,176
Dec 201003,75185.734.35$16,308
Nov 201003,53180.843.80$13,401
Oct 201003,66778.103.51$12,867
Sep 20101923,69772.633.98$28,657
Aug 201003,76073.684.42$16,617
Jul 201003,52172.554.74$16,677
Jun 201003,89370.364.91$19,116
May 20101824,10671.124.24$30,334
Apr 201004,09481.694.12$16,878
Mar 201004,50278.394.39$19,758
Feb 201004,16273.585.44$22,651
Jan 201005,02374.365.96$29,958
Dec 200904,94871.445.48$27,134
Nov 20091805,32074.593.75$33,384
Oct 200905,60072.544.11$23,017
Sep 200905,61165.543.06$17,196
Aug 20091925,82167.423.22$31,680
Jul 200905,68261.133.46$19,685
Jun 20091885,79266.163.90$34,998
May 200905,13754.743.93$20,167
Apr 200906,47046.773.59$23,211
Mar 200906,74942.144.06$27,394
Feb 20091836,43332.814.63$35,808
Jan 200907,07235.865.37$37,984
Dec 20081857,18937.105.98$49,833
Nov 200807,50355.496.86$51,473
Oct 200808,09275.246.92$56,013
Sep 20081688,140101.767.88$81,215
Aug 200808,918114.228.48$75,652
Jul 20081139,032131.0811.39$117,681
Jun 20081929,371131.3313.03$147,344
May 200817710,190123.1711.57$139,743
Apr 200818310,622110.3110.45$131,238
Mar 2008011,879101.909.66$114,799
Feb 200817712,08492.538.77$122,362
Jan 200818313,29390.388.21$125,618
Dec 200718014,87688.337.30$124,524
Nov 200736516,68191.677.29$155,092
Oct 2007020,41982.856.92$141,340
Sep 200753825,99075.846.24$203,088
Aug 200772745,66669.066.39$341,918
Jul 2007025,35270.906.39$161,947

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            40 bbl  × $ 85.44 =     $3,418
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $3,418

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/230926 is the state's own key, not one this site invented.