Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219970District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.6 M
May 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
241
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-12-07170405
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,152 bbl$75,854
GasProduction241,598 Mcf$1,507,020
Total$1,582,874

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6864, -100.2952. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.68636, -100.29517 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,850 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,850 ft.

Completions filed
May 2006
1 of 1 wells

1 well

42-211335294224P11,850 ftMay 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (241)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

241 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 201977055.052.66$4,239
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 2015029942.992.76$825
Aug 2015043740.162.87$1,255
Jul 2015041648.152.95$1,225
Jun 2015036856.152.88$1,061
May 2015023955.212.96$706
Apr 2015034749.822.71$939
Mar 2015038242.892.93$1,121
Feb 2015085044.662.98$2,530
Jan 2015028143.433.10$871
Dec 2014030754.693.59$1,103
Nov 2014035070.464.25$1,488
Oct 2014082378.303.90$3,210
Sep 2014021386.164.05$862
Aug 2014029789.394.04$1,198
Jul 201416925396.564.18$17,376
Jun 2014046998.164.74$2,222
May 2014015594.734.73$733
Apr 2014033195.944.81$1,592
Mar 2014044895.895.06$2,265
Feb 2014025997.406.19$1,604
Jan 2014036690.404.86$1,779
Dec 2013033091.824.35$1,437
Nov 2013048788.853.74$1,821
Oct 2013044297.423.78$1,670
Sep 20130458104.113.72$1,703
Aug 20130482104.253.52$1,698
Jul 20130409102.523.72$1,521
Jun 2013047194.403.93$1,853
May 2013053994.834.15$2,236
Apr 2013061193.964.28$2,617
Mar 2013062993.623.91$2,461
Feb 2013060091.233.42$2,052
Jan 2013548991.603.42$2,130
Dec 2012059186.773.42$2,021
Nov 2012064986.953.62$2,353
Oct 2012073089.383.40$2,482
Sep 2012066094.672.92$1,926
Aug 2012480592.662.91$2,712
Jul 2012074585.133.02$2,251
Jun 2012271579.822.52$1,961
May 2012271591.612.49$1,962
Apr 20120688101.652.00$1,374
Mar 20120642105.052.22$1,427
Feb 20120576101.102.57$1,480
Jan 2012064498.092.73$1,761
Dec 2011068196.873.24$2,206
Nov 2011070295.723.31$2,325
Oct 2011074484.983.65$2,715
Sep 2011074183.623.99$2,953
Aug 2011051083.404.15$2,116
Jul 2011068794.144.52$3,103
Jun 2011081092.904.64$3,758
May 2011031098.134.40$1,365
Apr 20110843105.964.33$3,653
Mar 201101,24496.364.06$5,047
Feb 201101,12385.644.18$4,694
Jan 201101,42186.504.59$6,521
Dec 201001,42285.734.35$6,183
Nov 201001,42980.843.80$5,424
Oct 201001,46378.103.51$5,134
Sep 201001,46172.633.98$5,814
Aug 201001,45173.684.42$6,412
Jul 201001,45272.554.74$6,877
Jun 201001,45670.364.91$7,150
May 201001,53071.124.24$6,480
Apr 201001,47781.694.12$6,089
Mar 201001,60878.394.39$7,057
Feb 201001,44673.585.44$7,870
Jan 201001,69674.365.96$10,115
Dec 200901,24571.445.48$6,827
Nov 2009067474.593.75$2,529
Oct 200901,40072.544.11$5,754
Sep 200901,30865.543.06$4,009
Aug 200901,23767.423.22$3,981
Jul 200901,34361.133.46$4,653
Jun 200901,35466.163.90$5,274
May 200901,66054.743.93$6,517
Apr 20091701,64146.773.59$13,838
Mar 200901,67442.144.06$6,795
Feb 200901,38332.814.63$6,407
Jan 200901,71835.865.37$9,227
Dec 200801,51537.105.98$9,055
Nov 200801,75055.496.86$12,006
Oct 200802,05375.246.92$14,211
Sep 200801,932101.767.88$15,219
Aug 200802,288114.228.48$19,409
Jul 200802,312131.0811.39$26,332
Jun 200802,366131.3313.03$30,835
May 200802,521123.1711.57$29,179
Apr 200802,505110.3110.45$26,189
Mar 200802,597101.909.66$25,098
Feb 200802,53192.538.77$22,198
Jan 200802,59290.388.21$21,269
Dec 200702,94688.337.30$21,512
Nov 200703,00591.677.29$21,912
Oct 200703,26982.856.92$22,628
Sep 200703,31775.846.24$20,712
Aug 20071883,48069.066.39$35,213
Jul 200703,75370.906.39$23,974
Jun 200703,84362.007.55$29,009
May 200704,09258.747.85$32,107
Apr 200704,06459.617.81$31,720
Mar 20071684,55056.927.30$42,787
Feb 200704,29955.108.22$35,321
Jan 200705,19850.306.73$34,966
Dec 200605,72856.656.92$39,629
Nov 200606,15954.207.62$46,916
Oct 200606,56754.906.01$39,493
Sep 20061847,27860.085.04$47,715
Aug 20061838,95368.717.34$78,288
Jul 2006011,34069.376.34$71,927
Jun 2006015,90766.286.38$101,548
May 2006040,54766.016.42$260,514

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2019 — as filed, then multipliedworked
Condensate            77 bbl  × $ 55.05 =     $4,239
Gas                    0 Mcf  × $  2.66 =         $0

────────────────────────────────────────────────────
Month total                                   $4,239

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/219970 is the state's own key, not one this site invented.