Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 220665District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.6 M
Jun 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
240
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-12-07171048
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,203 bbl$88,975
GasProduction249,722 Mcf$1,524,447
Total$1,613,422

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6888, -100.2938. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.68876, -100.29383 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,794 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,794 ft.

Completions filed
Jun 2006
1 of 1 wells

1 well

42-211335474217P11,794 ftJun 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 2023138085.443.09$11,791
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 2015047342.992.76$1,305
Aug 2015067340.162.87$1,933
Jul 2015072548.152.95$2,135
Jun 2015071456.152.88$2,058
May 2015076355.212.96$2,255
Apr 2015083749.822.71$2,265
Mar 2015072342.892.93$2,122
Feb 201501,00044.662.98$2,976
Jan 201501,07943.433.10$3,346
Dec 2014059054.693.59$2,119
Nov 2014067070.464.25$2,849
Oct 2014090678.303.90$3,534
Sep 2014045186.164.05$1,824
Aug 20140089.394.04$0
Jul 2014020696.564.18$861
Jun 201408598.164.74$403
May 201409094.734.73$425
Apr 2014029595.944.81$1,419
Mar 2014056295.895.06$2,842
Feb 2014045397.406.19$2,805
Jan 2014063290.404.86$3,072
Dec 2013067291.824.35$2,926
Nov 2013075488.853.74$2,819
Oct 2013080297.423.78$3,031
Sep 20130730104.113.72$2,714
Aug 20130799104.253.52$2,815
Jul 20130789102.523.72$2,933
Jun 2013077694.403.93$3,052
May 201301,06094.834.15$4,398
Apr 201301,11593.964.28$4,775
Mar 201301,31293.623.91$5,134
Feb 2013072991.233.42$2,493
Jan 201301,26191.603.42$4,313
Dec 2012096886.773.42$3,311
Nov 2012193886.953.62$3,487
Oct 2012092589.383.40$3,145
Sep 2012077494.672.92$2,259
Aug 2012476992.662.91$2,607
Jul 2012075385.133.02$2,275
Jun 2012281279.822.52$2,205
May 2012285491.612.49$2,308
Apr 20120853101.652.00$1,703
Mar 20120887105.052.22$1,971
Feb 20120990101.102.57$2,545
Jan 201201,50498.092.73$4,112
Dec 201101,44296.873.24$4,672
Nov 201101,38995.723.31$4,599
Oct 201101,47384.983.65$5,374
Sep 201101,42883.623.99$5,692
Aug 201101,12483.404.15$4,664
Jul 201101,02794.144.52$4,639
Jun 2011095092.904.64$4,408
May 201101,00698.134.40$4,431
Apr 20110948105.964.33$4,108
Mar 2011090396.364.06$3,664
Feb 2011089485.644.18$3,737
Jan 2011099986.504.59$4,584
Dec 201001,18485.734.35$5,148
Nov 201001,18280.843.80$4,486
Oct 201001,11678.103.51$3,916
Sep 201001,27672.633.98$5,078
Aug 2010097473.684.42$4,304
Jul 2010071972.554.74$3,406
Jun 2010073170.364.91$3,590
May 2010094171.124.24$3,985
Apr 2010096581.694.12$3,978
Mar 201018844878.394.39$16,703
Feb 201001,34173.585.44$7,298
Jan 201001,66774.365.96$9,942
Dec 200901,79771.445.48$9,854
Nov 200901,79474.593.75$6,730
Oct 200901,93372.544.11$7,945
Sep 200901,97265.543.06$6,044
Aug 200901,89767.423.22$6,105
Jul 200902,12361.133.46$7,355
Jun 200902,10166.163.90$8,183
May 200902,22354.743.93$8,727
Apr 200902,24846.773.59$8,065
Mar 200902,25342.144.06$9,145
Feb 200902,09932.814.63$9,725
Jan 200902,22835.865.37$11,967
Dec 200802,35937.105.98$14,100
Nov 200802,50755.496.86$17,199
Oct 200802,76275.246.92$19,119
Sep 200802,724101.767.88$21,457
Aug 200802,966114.228.48$25,161
Jul 200802,987131.0811.39$34,020
Jun 200802,972131.3313.03$38,733
May 200803,140123.1711.57$36,343
Apr 20081683,128110.3110.45$51,235
Mar 200803,431101.909.66$33,157
Feb 200803,36392.538.77$29,495
Jan 200803,63190.388.21$29,795
Dec 200703,79688.337.30$27,718
Nov 200703,92791.677.29$28,635
Oct 200704,11282.856.92$28,463
Sep 200703,94475.846.24$24,627
Aug 200704,05469.066.39$25,897
Jul 20071774,02070.906.39$38,229
Jun 200703,53762.007.55$26,699
May 20071893,78458.747.85$40,792
Apr 200703,71159.617.81$28,965
Mar 200703,92556.927.30$28,660
Feb 200703,65855.108.22$30,054
Jan 200704,16950.306.73$28,044
Dec 20061765,08656.656.92$45,158
Nov 200605,90654.207.62$44,989
Oct 200606,59754.906.01$39,673
Sep 20061587,60160.085.04$47,780
Aug 2006010,12168.717.34$74,287
Jul 2006016,05469.376.34$101,827
Jun 2006031,20266.286.38$199,190

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate           138 bbl  × $ 85.44 =    $11,791
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                  $11,791

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/220665 is the state's own key, not one this site invented.