VANDIVER

Operated by UNIT PETROLEUM COMPANY (P-5 877099) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 223086District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.7 M
Apr 2006 – Dec 2021
Value, last 12 filed months
$20 k
at the published price for each month
Months reported
189
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-05-19182977
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,649 bbl$309,495
GasProduction606,657 Mcf$3,382,496
Total$3,691,991

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6601, -100.3147. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.66012, -100.31465 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,900 ft
1 wells filed one
Completion to plug
15.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,900 ft.

Completions filed
Apr 2006
1 of 1 wells
Plug dates filed
Dec 2021
1 of 1 wells

Last completion to plug: a median of 15.7 years across the 1 well that filed both dates, with the middle half between 15.7 years and 15.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-211334575418P11,900 ftApr 2006Dec 2021Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (189)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

189 months

Dec 2021150071.323.90$10,698
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20216066.024.22$396
Jul 2021038470.783.98$1,529
Jun 2021037269.493.38$1,258
May 2021041963.483.02$1,264
Apr 2021045860.362.76$1,263
Mar 2021038461.302.72$1,043
Feb 2021034757.805.55$1,925
Jan 2021038450.412.81$1,079
Dec 2020038444.642.68$1,027
Nov 2020037238.772.71$1,007
Oct 2020086036.972.48$2,131
Sep 20205593237.091.99$3,896
Aug 2020098939.982.39$2,359
Jul 202001,00638.371.83$1,836
Jun 2020099834.901.69$1,687
May 202001,02616.921.81$1,862
Apr 202001,01214.751.80$1,826
Mar 202001,05530.341.86$1,958
Feb 202001,03849.881.98$2,056
Jan 2020079657.252.09$1,667
Dec 2019092259.012.30$2,125
Nov 2019089355.302.75$2,456
Oct 2019091253.472.42$2,206
Sep 2019092455.052.66$2,455
Aug 2019199753.112.30$2,351
Jul 201971,01156.272.46$2,881
Jun 201941,06052.782.49$2,852
May 20192187258.482.74$3,618
Apr 201961,07962.632.75$3,344
Mar 201911,28956.803.06$4,004
Feb 201901,10650.852.79$3,088
Jan 201901,38646.033.23$4,474
Dec 20181251,13046.594.19$10,553
Nov 201801,18552.934.24$5,021
Oct 201801,58361.443.40$5,379
Sep 201801,30859.543.11$4,065
Aug 201801,35959.403.07$4,167
Jul 201801,55665.142.93$4,562
Jun 201801,16260.183.08$3,575
May 2018082565.382.90$2,393
Apr 201801,21063.842.90$3,510
Mar 201801,36361.222.79$3,798
Feb 201801,35961.782.77$3,759
Jan 201801,63562.874.01$6,555
Dec 2017092957.272.92$2,714
Nov 2017072355.423.12$2,255
Oct 201702,96549.292.98$8,847
Sep 2017069947.523.09$2,158
Aug 201701,25445.373.00$3,768
Jul 2017038443.873.09$1,186
Jun 2017086142.493.09$2,658
May 201701,00045.373.26$3,263
Apr 201701,67047.933.21$5,363
Mar 201701,60946.772.98$4,801
Feb 201701,38550.452.95$4,089
Jan 201701,79249.413.42$6,126
Dec 201601,88248.763.72$7,006
Nov 201601,55242.492.64$4,104
Oct 201601,52146.193.09$4,700
Sep 201601,42741.553.10$4,425
Aug 201601,47841.442.92$4,322
Jul 201601,54741.622.92$4,524
Jun 201601,40045.352.69$3,760
May 201601,52342.521.99$3,032
Apr 201601,42136.561.99$2,829
Mar 201601,52433.011.79$2,734
Feb 201601,38126.472.06$2,850
Jan 201601,41527.352.36$3,346
Dec 20151891,35332.362.00$8,824
Nov 201501,56338.792.17$3,388
Oct 201511,50943.552.43$3,705
Sep 201501,46742.992.76$4,047
Aug 201501,57840.162.87$4,533
Jul 201521,64548.152.95$4,941
Jun 201501,57156.152.88$4,529
May 201501,61555.212.96$4,773
Apr 201501,57849.822.71$4,271
Mar 201501,64242.892.93$4,819
Feb 201511,75444.662.98$5,265
Jan 201521,56043.433.10$4,924
Dec 201401,63654.693.59$5,875
Nov 201401,91770.464.25$8,151
Oct 201401,99878.303.90$7,794
Sep 201401,87186.164.05$7,569
Aug 201401,92089.394.04$7,747
Jul 201401,90296.564.18$7,950
Jun 201401,74398.164.74$8,256
May 201401,85094.734.73$8,744
Apr 201411,72395.944.81$8,382
Mar 201401,64095.895.06$8,293
Feb 201401,64497.406.19$10,180
Jan 201411,68190.404.86$8,261
Dec 201301,70991.824.35$7,442
Nov 201301,70188.853.74$6,359
Oct 201301,82797.423.78$6,905
Sep 201301,406104.113.72$5,227
Aug 201301,860104.253.52$6,552
Jul 201301,896102.523.72$7,049
Jun 201301,94694.403.93$7,654
May 201301,55194.834.15$6,435
Apr 201302,11793.964.28$9,066
Mar 201302,26393.623.91$8,855
Feb 201312,06591.233.42$7,153
Jan 201302,41091.603.42$8,242
Dec 201202,56186.773.42$8,759
Nov 201202,63486.953.62$9,548
Oct 201203,00389.383.40$10,209
Sep 201202,77694.672.92$8,101
Aug 201242,97992.662.91$9,034
Jul 201202,93685.133.02$8,869
Jun 201222,84679.822.52$7,329
May 20121752,76391.612.49$22,907
Apr 201202,408101.652.00$4,808
Mar 201202,392105.052.22$5,315
Feb 201202,250101.102.57$5,783
Jan 201202,32998.092.73$6,368
Dec 201102,29896.873.24$7,445
Nov 201102,19095.723.31$7,252
Oct 201102,47384.983.65$9,023
Sep 201102,47783.623.99$9,873
Aug 201102,60383.404.15$10,801
Jul 201102,20194.144.52$9,942
Jun 201102,34792.904.64$10,890
May 201102,48298.134.40$10,933
Apr 201102,467105.964.33$10,690
Mar 20111342,35096.364.06$22,447
Feb 201102,00685.644.18$8,385
Jan 201102,66386.504.59$12,220
Dec 201002,73385.734.35$11,882
Nov 201003,13280.843.80$11,887
Oct 201003,08078.103.51$10,807
Sep 201003,05972.633.98$12,173
Aug 201002,69573.684.42$11,910
Jul 201002,59772.554.74$12,301
Jun 201002,79670.364.91$13,729
May 20101902,93471.124.24$25,939
Apr 201002,73881.694.12$11,288
Mar 201003,06278.394.39$13,438
Feb 201002,85573.585.44$15,538
Jan 201002,68874.365.96$16,031
Dec 200903,04171.445.48$16,676
Nov 200903,09574.593.75$11,611
Oct 200903,19972.544.11$13,149
Sep 200903,11565.543.06$9,547
Aug 200903,29367.423.22$10,599
Jul 200903,42661.133.46$11,869
Jun 20091873,38966.163.90$25,572
May 200903,31954.743.93$13,030
Apr 200903,43746.773.59$12,330
Mar 200903,13742.144.06$12,733
Feb 200903,04332.814.63$14,098
Jan 200903,35935.865.37$18,041
Dec 200803,66937.105.98$21,930
Nov 200804,06955.496.86$27,915
Oct 200804,43575.246.92$30,699
Sep 20081734,371101.767.88$52,035
Aug 200804,807114.228.48$40,778
Jul 200804,917131.0811.39$56,002
Jun 200804,745131.3313.03$61,840
May 200804,644123.1711.57$53,751
Apr 200804,796110.3110.45$50,142
Mar 20081775,343101.909.66$69,671
Feb 200804,91892.538.77$43,134
Jan 200805,29690.388.21$43,458
Dec 200705,78888.337.30$42,264
Nov 200705,77391.677.29$42,095
Oct 20071806,35882.856.92$58,923
Sep 200706,39775.846.24$39,944
Aug 200706,99069.066.39$44,652
Jul 200707,41070.906.39$47,335
Jun 20071757,46962.007.55$67,229
May 20071718,45558.747.85$76,385
Apr 200708,37759.617.81$65,384
Mar 20071819,18456.927.30$77,364
Feb 200708,37555.108.22$68,809
Jan 200731610,05850.306.73$83,553
Dec 200618011,36256.656.92$88,804
Nov 200619111,99254.207.62$101,701
Oct 2006014,04154.906.01$84,440
Sep 200618815,45560.085.04$89,145
Aug 200618618,06368.717.34$145,361
Jul 200619021,79869.376.34$151,440
Jun 200635024,62666.286.38$180,407
May 200653335,79766.016.42$265,179
Apr 200619235,42864.397.36$273,130

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2021 — as filed, then multipliedworked
Condensate           150 bbl  × $ 71.32 =    $10,698
Gas                    0 Mcf  × $  3.90 =         $0

────────────────────────────────────────────────────
Month total                                  $10,698

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/223086 is the state's own key, not one this site invented.