VANDIVER

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 230209District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.0 M
Mar 2007 – May 2026
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
231
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-12-12175911
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,220 bbl$165,281
GasProduction377,715 Mcf$1,821,284
Total$1,986,565

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6591, -100.3123. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.65910, -100.31234 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,925 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,925 ft.

Completions filed
Mar 2007
1 of 1 wells

1 well

42-211333695424P11,925 ftMar 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (231)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

231 months

May 202600106.413.05$0
Apr 2026019998.932.87$571
Mar 2026013089.753.15$409
Feb 2026019863.503.75$743
Jan 2026026359.138.00$2,103
Dec 2025030256.664.41$1,333
Nov 2025023858.593.93$934
Oct 2025027959.383.30$922
Sep 2025023162.743.08$711
Aug 2025030363.933.01$913
Jul 2025024566.743.32$812
Jun 2025022566.483.13$704
May 2025020460.553.23$659
Apr 2025017362.363.54$613
Mar 2025015867.704.27$674
Feb 2025017670.884.34$764
Jan 202506474.324.28$274
Dec 2024025668.993.12$799
Nov 2024022869.052.20$501
Oct 2024017871.372.28$406
Sep 2024021969.612.36$518
Aug 2024024575.632.06$506
Jul 2024028079.932.15$601
Jun 2024023578.082.63$619
May 2024028778.812.20$631
Apr 2024028384.451.66$470
Mar 2024028580.301.55$440
Feb 2024025876.091.78$460
Jan 2024022773.023.30$749
Dec 2023025171.262.61$655
Nov 2023020977.892.81$587
Oct 2023025685.443.09$790
Sep 2023025989.042.74$708
Aug 2023027980.522.67$746
Jul 2023028174.852.64$742
Jun 2023027368.962.26$617
May 2023022170.622.23$492
Apr 2023027878.122.24$622
Mar 2023032272.852.39$771
Feb 2023027875.112.47$685
Jan 202303776.533.39$125
Dec 2022013076.415.73$745
Nov 2022018485.005.65$1,039
Oct 2022019187.185.86$1,120
Sep 2022016684.888.16$1,355
Aug 2022017994.529.13$1,634
Jul 20220287101.587.54$2,165
Jun 20220271115.097.98$2,162
May 20220218109.378.43$1,838
Apr 202200104.226.84$0
Mar 20220248108.885.08$1,259
Feb 2022022891.054.86$1,108
Jan 2022026181.844.54$1,184
Dec 2021039171.323.90$1,525
Nov 2021037777.435.24$1,974
Oct 2021029079.795.71$1,657
Sep 2021029969.865.35$1,600
Aug 2021423966.024.22$1,273
Jul 2021057870.783.98$2,302
Jun 2021064469.493.38$2,177
May 2021090463.483.02$2,728
Apr 2021090460.362.76$2,494
Mar 2021084661.302.72$2,299
Feb 2021045857.805.55$2,541
Jan 2021091050.412.81$2,557
Dec 2020090944.642.68$2,432
Nov 2020083938.772.71$2,271
Oct 2020091836.972.48$2,275
Sep 20208289337.091.99$4,819
Aug 2020062539.982.39$1,491
Jul 2020070338.371.83$1,283
Jun 2020092634.901.69$1,565
May 2020094816.921.81$1,720
Apr 2020098914.751.80$1,785
Mar 2020089630.341.86$1,663
Feb 202001,12149.881.98$2,220
Jan 2020076357.252.09$1,598
Dec 201901,01859.012.30$2,346
Nov 2019098555.302.75$2,709
Oct 2019096653.472.42$2,336
Sep 2019092355.052.66$2,453
Aug 2019193053.112.30$2,196
Jul 2019095756.272.46$2,354
Jun 201901,12752.782.49$2,808
May 201921,18758.482.74$3,370
Apr 2019391162.632.75$2,694
Mar 2019077656.803.06$2,376
Feb 2019035650.852.79$994
Jan 201901,03046.033.23$3,325
Dec 201818295646.594.19$12,481
Nov 201801,09052.934.24$4,619
Oct 201862,02361.443.40$7,243
Sep 201862,08459.543.11$6,834
Aug 201802,02859.403.07$6,219
Jul 201831,58265.142.93$4,834
Jun 201801,68860.183.08$5,194
May 201801,17565.382.90$3,408
Apr 201811,20163.842.90$3,548
Mar 201801,24461.222.79$3,467
Feb 2018057061.782.77$1,577
Jan 2018186762.874.01$3,539
Dec 20171882,25157.272.92$17,343
Nov 201712,94155.423.12$9,227
Oct 201703,94249.292.98$11,762
Sep 201722,37747.523.09$7,434
Aug 2017180845.373.00$2,473
Jul 201722,64943.873.09$8,266
Jun 201702,62942.493.09$8,116
May 201702,59045.373.26$8,452
Apr 201702,48547.933.21$7,981
Mar 201722,58846.772.98$7,815
Feb 201721,37550.452.95$4,161
Jan 201721,73849.413.42$6,041
Dec 201601,71448.763.72$6,381
Nov 201601,45442.492.64$3,845
Oct 201601,19046.193.09$3,677
Sep 201601,15841.553.10$3,591
Aug 201601,34141.442.92$3,922
Jul 2016080641.622.92$2,357
Jun 201601,36245.352.69$3,658
May 201601,48342.521.99$2,953
Apr 201601,34836.561.99$2,684
Mar 201601,58933.011.79$2,851
Feb 201601,54326.472.06$3,184
Jan 201601,72127.352.36$4,069
Dec 201501,64532.362.00$3,292
Nov 201501,72738.792.17$3,743
Oct 201501,78843.552.43$4,339
Sep 201511,73042.992.76$4,815
Aug 201501,73040.162.87$4,969
Jul 201521,49648.152.95$4,502
Jun 201511,43956.152.88$4,205
May 201501,47855.212.96$4,368
Apr 201501,36449.822.71$3,692
Mar 201501,52342.892.93$4,470
Feb 201501,37344.662.98$4,086
Jan 201501,23943.433.10$3,842
Dec 201401,39454.693.59$5,006
Nov 201401,36870.464.25$5,817
Oct 201401,13178.303.90$4,412
Sep 2014098886.164.05$3,997
Aug 201401,10589.394.04$4,459
Jul 201401,21296.564.18$5,066
Jun 201401,21198.164.74$5,736
May 201401,32494.734.73$6,258
Apr 201401,27295.944.81$6,117
Mar 201401,11195.895.06$5,618
Feb 2014082497.406.19$5,102
Jan 2014094690.404.86$4,598
Dec 2013282091.824.35$3,754
Nov 201301,69688.853.74$6,340
Oct 201301,68297.423.78$6,357
Sep 201301,691104.113.72$6,287
Aug 201311,842104.253.52$6,593
Jul 201311,889102.523.72$7,125
Jun 201311,82194.403.93$7,257
May 201331,82194.834.15$7,840
Apr 201321,78993.964.28$7,849
Mar 201301,82093.623.91$7,121
Feb 20131931,55991.233.42$22,939
Jan 201301,73491.603.42$5,930
Dec 201201,59886.773.42$5,465
Nov 201201,84986.953.62$6,703
Oct 201201,98589.383.40$6,748
Sep 201201,92994.672.92$5,630
Aug 201241,89192.662.91$5,870
Jul 201201,95185.133.02$5,894
Jun 201221,96279.822.52$5,102
May 201222,01691.612.49$5,200
Apr 201201,924101.652.00$3,842
Mar 201201,881105.052.22$4,180
Feb 201201,851101.102.57$4,758
Jan 201202,01598.092.73$5,509
Dec 201101,99396.873.24$6,457
Nov 20111891,65795.723.31$23,578
Oct 201101,64184.983.65$5,987
Sep 201101,72483.623.99$6,872
Aug 201101,52283.404.15$6,315
Jul 201101,83794.144.52$8,298
Jun 201101,45292.904.64$6,737
May 201101,68398.134.40$7,413
Apr 201101,695105.964.33$7,345
Mar 201101,74796.364.06$7,088
Feb 201101,68685.644.18$7,047
Jan 201102,49786.504.59$11,458
Dec 201002,45885.734.35$10,687
Nov 201002,44680.843.80$9,283
Oct 201002,54778.103.51$8,937
Sep 201002,53372.633.98$10,080
Aug 201002,54573.684.42$11,247
Jul 201002,49172.554.74$11,799
Jun 201002,38970.364.91$11,731
May 201002,82971.124.24$11,981
Apr 201002,74681.694.12$11,321
Mar 20101952,86378.394.39$27,851
Feb 201002,37973.585.44$12,947
Jan 201002,68974.365.96$16,037
Dec 200902,82371.445.48$15,481
Nov 200903,03874.593.75$11,397
Oct 200903,17772.544.11$13,058
Sep 200902,99265.543.06$9,170
Aug 200903,29967.423.22$10,618
Jul 200903,14861.133.46$10,906
Jun 200903,41266.163.90$13,290
May 200903,11054.743.93$12,209
Apr 20091733,41346.773.59$20,335
Mar 200903,63242.144.06$14,742
Feb 200903,31032.814.63$15,335
Jan 200903,52435.865.37$18,927
Dec 200803,46637.105.98$20,717
Nov 200803,76455.496.86$25,822
Oct 200803,97275.246.92$27,494
Sep 20081783,781101.767.88$47,897
Aug 200803,845114.228.48$32,617
Jul 200804,140131.0811.39$47,152
Jun 200803,955131.3313.03$51,544
May 200804,315123.1711.57$49,943
Apr 20081724,171110.3110.45$62,581
Mar 200803,486101.909.66$33,689
Feb 200804,06692.538.77$35,661
Jan 2008734,23890.388.21$41,374
Dec 200704,47888.337.30$32,698
Nov 200704,50291.677.29$32,827
Oct 20071725,11882.856.92$49,677
Sep 200705,27175.846.24$32,913
Aug 200705,62669.066.39$35,939
Jul 200706,53970.906.39$41,771
Jun 20071868,16262.007.55$73,142
May 20071769,41858.747.85$84,235
Apr 200709,99759.617.81$78,029
Mar 200703,24256.927.30$23,673

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                  199 Mcf  × $  2.87 =       $571

────────────────────────────────────────────────────
Month total                                     $571

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/230209 is the state's own key, not one this site invented.