JOHN C. VISE

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 227892District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.9 M
Mar 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
231
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-08-20176448
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7,576 bbl$563,053
GasProduction399,803 Mcf$2,328,098
Total$2,891,152

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6208, -100.3097. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.62077, -100.30966 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,700 ft.

Completions filed
Apr 2013
1 of 1 wells

1 well

42-211338201852A13,700 ftApr 2013

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (231)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

231 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 202326070.622.23$1,836
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 2021019160.362.76$527
Mar 2021021961.302.72$595
Feb 2021020457.805.55$1,132
Jan 2021027250.412.81$764
Dec 2020015844.642.68$423
Nov 2020036838.772.71$996
Oct 2020022936.972.48$568
Sep 2020059137.091.99$1,177
Aug 20207752339.982.39$4,326
Jul 2020030638.371.83$558
Jun 2020039534.901.69$668
May 2020033016.921.81$599
Apr 2020062614.751.80$1,130
Mar 2020012730.341.86$236
Feb 2020015749.881.98$311
Jan 2020024757.252.09$517
Dec 2019014559.012.30$334
Nov 2019016055.302.75$440
Oct 2019011853.472.42$285
Sep 2019017155.052.66$454
Aug 2019020053.112.30$461
Jul 2019037356.272.46$918
Jun 2019019852.782.49$493
May 2019033958.482.74$929
Apr 201902462.632.75$66
Mar 201906756.803.06$205
Feb 201908150.852.79$226
Jan 2019013646.033.23$439
Dec 201809346.594.19$389
Nov 2018010752.934.24$453
Oct 2018012161.443.40$411
Sep 2018011559.543.11$357
Aug 2018019659.403.07$601
Jul 2018021465.142.93$627
Jun 2018016960.183.08$520
May 2018020865.382.90$603
Apr 2018017563.842.90$508
Mar 2018015961.222.79$443
Feb 2018013861.782.77$382
Jan 2018022062.874.01$882
Dec 2017019057.272.92$555
Nov 2017015355.423.12$477
Oct 2017012949.292.98$385
Sep 201708347.523.09$256
Aug 2017015645.373.00$469
Jul 2017010743.873.09$330
Jun 2017018542.493.09$571
May 2017025445.373.26$829
Apr 2017039147.933.21$1,256
Mar 2017031646.772.98$943
Feb 2017019750.452.95$582
Jan 2017019649.413.42$670
Dec 2016028448.763.72$1,057
Nov 2016013242.492.64$349
Oct 2016015946.193.09$491
Sep 2016017041.553.10$527
Aug 2016024541.442.92$716
Jul 2016028641.622.92$836
Jun 2016022745.352.69$610
May 2016628742.521.99$827
Apr 2016025636.561.99$510
Mar 2016048033.011.79$861
Feb 20162089826.472.06$2,383
Jan 2016062127.352.36$1,468
Dec 2015026832.362.00$536
Nov 2015035538.792.17$769
Oct 20150043.552.43$0
Sep 2015190842.992.76$2,548
Aug 201501,25140.162.87$3,593
Jul 201541,28248.152.95$3,968
Jun 201531,34656.152.88$4,049
May 201501,50255.212.96$4,439
Apr 201581,40549.822.71$4,201
Mar 2015971,52342.892.93$8,630
Feb 2015111,29644.662.98$4,348
Jan 2015111,04443.433.10$3,715
Dec 201491,35754.693.59$5,366
Nov 201491,59570.464.25$7,416
Oct 2014141,90278.303.90$8,516
Sep 201481,89986.164.05$8,372
Aug 20141172,13289.394.04$19,062
Jul 2014211,79096.564.18$9,509
Jun 2014231,43898.164.74$9,069
May 2014462,16194.734.73$14,572
Apr 20141021,41295.944.81$16,576
Mar 20141727995.895.06$3,041
Feb 2014050097.406.19$3,096
Jan 2014067190.404.86$3,262
Dec 2013064791.824.35$2,817
Nov 2013096888.853.74$3,619
Oct 201351,08997.423.78$4,603
Sep 20130965104.113.72$3,588
Aug 20130805104.253.52$2,836
Jul 2013320102.523.72$3,281
Jun 2013182094.403.93$1,778
May 201301,72994.834.15$7,174
Apr 201310283393.964.28$13,151
Mar 2013131,11293.623.91$5,568
Feb 201301,21791.233.42$4,162
Jan 201301,12691.603.42$3,851
Dec 201201,30886.773.42$4,474
Nov 201201,16886.953.62$4,234
Oct 201201,23389.383.40$4,192
Sep 20125437694.672.92$6,210
Aug 201201,35092.662.91$3,926
Jul 201201,36985.133.02$4,135
Jun 201201,35979.822.52$3,423
May 2012631,64391.612.49$9,860
Apr 2012641,458101.652.00$9,417
Mar 201212,260105.052.22$5,127
Feb 201222,165101.102.57$5,767
Jan 2012712,04798.092.73$12,561
Dec 201102,20296.873.24$7,134
Nov 20111012,43595.723.31$17,731
Oct 201182,83684.983.65$11,027
Sep 20111133,77483.623.99$24,491
Aug 201173,40283.404.15$14,700
Jul 2011103,58794.144.52$17,145
Jun 20111053,32492.904.64$25,177
May 201103,35398.134.40$14,769
Apr 2011952,604105.964.33$21,350
Mar 2011892,82196.364.06$20,022
Feb 201172,93385.644.18$12,859
Jan 2011123,63086.504.59$17,695
Dec 20101043,83785.734.35$25,598
Nov 2010163,75480.843.80$15,541
Oct 2010123,85778.103.51$14,471
Sep 2010933,62072.633.98$21,160
Aug 201093,59673.684.42$16,555
Jul 2010133,66072.554.74$18,279
Jun 2010983,55570.364.91$24,352
May 2010293,67171.124.24$17,610
Apr 20101253,82681.694.12$25,985
Mar 20101074,13278.394.39$26,522
Feb 2010533,86073.585.44$24,907
Jan 2010303,84374.365.96$25,151
Dec 20091294,33171.445.48$32,966
Nov 2009374,27074.593.75$18,779
Oct 20091134,46072.544.11$26,529
Sep 20091194,24465.543.06$20,806
Aug 200904,19167.423.22$13,489
Jul 20091193,95261.133.46$20,966
Jun 200943,08566.163.90$12,281
May 2009693,58754.743.93$17,859
Apr 200991,51146.773.59$5,842
Mar 2009923,00242.144.06$16,062
Feb 2009752,60632.814.63$14,534
Jan 200902,89535.865.37$15,549
Dec 20081562,97037.105.98$23,540
Nov 2008203,83055.496.86$27,385
Oct 2008293,93575.246.92$29,420
Sep 2008994,914101.767.88$48,782
Aug 2008993,766114.228.48$43,255
Jul 2008583,730131.0811.39$50,085
Jun 2008303,518131.3313.03$49,789
May 2008983,915123.1711.57$57,384
Apr 2008244,065110.3110.45$45,146
Mar 20081104,976101.909.66$59,297
Feb 20081914,69092.538.77$58,807
Jan 20081905,79190.388.21$64,692
Dec 20071136,67788.337.30$58,737
Nov 20071136,63891.677.29$58,761
Oct 20072198,10982.856.92$74,274
Sep 20072439,64075.846.24$78,623
Aug 200723013,98069.066.39$105,187
Jul 200728215,28170.906.39$117,608
Jun 200741118,41962.007.55$164,517
May 200776030,58458.747.85$284,613
Apr 200750228,41159.617.81$251,678
Mar 200754214,88356.927.30$139,526

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2023 — as filed, then multipliedworked
Condensate            26 bbl  × $ 70.62 =     $1,836
Gas                    0 Mcf  × $  2.23 =         $0

────────────────────────────────────────────────────
Month total                                   $1,836

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/227892 is the state's own key, not one this site invented.