Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 234795District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.8 M
Dec 2007 – May 2026
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
222
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-16183503
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition15,804 bbl$1,256,600
GasProduction475,072 Mcf$2,538,983
Total$3,795,583

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6162, -100.3129. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.61619, -100.31292 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,710 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,710 ft.

Completions filed
Feb 2013
1 of 1 wells

1 well

42-48332466351A13,710 ftFeb 2013

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (222)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

222 months

May 202600106.413.05$0
Apr 202609198.932.87$261
Mar 20260089.753.15$0
Feb 202607863.503.75$293
Jan 202609959.138.00$792
Dec 2025013256.664.41$583
Nov 202507758.593.93$302
Oct 20258221459.383.30$5,576
Sep 2025030562.743.08$938
Aug 2025108463.933.01$893
Jul 2025010866.743.32$358
Jun 202506666.483.13$207
May 2025018260.553.23$588
Apr 2025011662.363.54$411
Mar 2025028567.704.27$1,216
Feb 2025080470.884.34$3,490
Jan 20250074.324.28$0
Dec 2024113068.993.12$7,796
Nov 2024037569.052.20$824
Oct 2024037071.372.28$844
Sep 2024028969.612.36$683
Aug 202410527775.632.06$8,513
Jul 2024052379.932.15$1,123
Jun 2024031878.082.63$838
May 202411030578.812.20$9,340
Apr 2024044384.451.66$735
Mar 2024721780.301.55$5,808
Feb 2024028376.091.78$505
Jan 2024023373.023.30$768
Dec 2023027571.262.61$718
Nov 202311630477.892.81$9,889
Oct 2023032685.443.09$1,006
Sep 2023030289.042.74$826
Aug 2023060280.522.67$1,609
Jul 2023017074.852.64$449
Jun 20230068.962.26$0
May 2023018970.622.23$421
Apr 202310727278.122.24$8,968
Mar 2023027472.852.39$656
Feb 2023032175.112.47$791
Jan 2023017476.533.39$589
Dec 2022026776.415.73$1,530
Nov 2022010785.005.65$604
Oct 2022027687.185.86$1,618
Sep 202216121284.888.16$15,396
Aug 2022044394.529.13$4,043
Jul 20220779101.587.54$5,875
Jun 2022072115.097.98$574
May 2022048109.378.43$405
Apr 20220172104.226.84$1,176
Mar 20220147108.885.08$746
Feb 202204891.054.86$233
Jan 202203181.844.54$141
Dec 202101671.323.90$62
Nov 2021011177.435.24$581
Oct 2021018079.795.71$1,029
Sep 2021026869.865.35$1,434
Aug 2021013166.024.22$553
Jul 202106770.783.98$267
Jun 2021051369.493.38$1,734
May 2021018463.483.02$555
Apr 2021021860.362.76$601
Mar 2021042161.302.72$1,144
Feb 2021015057.805.55$832
Jan 202107350.412.81$205
Dec 2020029344.642.68$784
Nov 2020036738.772.71$993
Oct 2020056236.972.48$1,393
Sep 2020076637.091.99$1,525
Aug 202001,04439.982.39$2,490
Jul 202001,19538.371.83$2,181
Jun 202001,25634.901.69$2,123
May 202002,11216.921.81$3,833
Apr 202001,89214.751.80$3,414
Mar 202001,63130.341.86$3,028
Feb 202001,16449.881.98$2,306
Jan 20201851,30957.252.09$13,333
Dec 201901,59959.012.30$3,685
Nov 201901,27155.302.75$3,496
Oct 20191991,30353.472.42$13,792
Sep 201901,76555.052.66$4,690
Aug 201902,30153.112.30$5,302
Jul 20191932,83556.272.46$17,834
Jun 201902,24452.782.49$5,590
May 201902,26458.482.74$6,204
Apr 20192002,67962.632.75$19,895
Mar 2019141,25856.803.06$4,647
Feb 20192021,30350.852.79$13,910
Jan 201921,68446.033.23$5,528
Dec 20183346.594.19$152
Nov 20181993,07052.934.24$23,541
Oct 20181681,93761.443.40$16,904
Sep 201802,63459.543.11$8,186
Aug 201822,58959.403.07$8,058
Jul 201802,30265.142.93$6,749
Jun 201801,97360.183.08$6,071
May 201872,79165.382.90$8,554
Apr 20181061,97963.842.90$12,508
Mar 2018281,78261.222.79$6,680
Feb 2018201,93761.782.77$6,594
Jan 20181091,95162.874.01$14,675
Dec 201791,67757.272.92$5,415
Nov 201781,16655.423.12$4,079
Oct 20171081,10949.292.98$8,632
Sep 2017111,49647.523.09$5,141
Aug 20171031,40745.373.00$8,900
Jul 2017141,27043.873.09$4,535
Jun 20171091,89842.493.09$10,491
May 20171081,89745.373.26$11,091
Apr 2017151,53347.933.21$5,642
Mar 20171061,49546.772.98$9,418
Feb 2017171,48950.452.95$5,254
Jan 20179762249.413.42$6,919
Dec 2016857048.763.72$2,512
Nov 201691,38542.492.64$4,045
Oct 20161991,82646.193.09$14,835
Sep 201631,71241.553.10$5,433
Aug 201641,67341.442.92$5,058
Jul 2016991,64141.622.92$8,919
Jun 201621,67045.352.69$4,576
May 2016971,68942.521.99$7,487
Apr 201631,93336.561.99$3,958
Mar 2016981,63933.011.79$6,175
Feb 201641,65226.472.06$3,515
Jan 20161971,72227.352.36$9,459
Dec 201562,27432.362.00$4,745
Nov 201582,16138.792.17$4,994
Oct 20151991,75843.552.43$12,932
Sep 201552,09942.992.76$6,005
Aug 201502,00340.162.87$5,754
Jul 20151112,06048.152.95$11,412
Jun 20151142,26856.152.88$12,939
May 2015982,22355.212.96$11,981
Apr 2015182,19249.822.71$6,830
Mar 2015252,39542.892.93$8,101
Feb 20151111,45944.662.98$9,300
Jan 20151272,69843.433.10$13,881
Dec 2014212,37454.693.59$9,674
Nov 20141112,71070.464.25$19,344
Oct 20141602,54978.303.90$22,472
Sep 2014223,05186.164.05$14,238
Aug 20141613,32089.394.04$27,788
Jul 20141416,10396.564.18$39,123
Jun 20142525,10698.164.74$48,923
May 20142947,71094.734.73$64,292
Apr 20144278,31495.944.81$80,949
Mar 201450410,04095.895.06$99,099
Feb 2014527,94297.406.19$54,242
Jan 201403,64390.404.86$17,708
Dec 201304,36091.824.35$18,986
Nov 2013535,34688.853.74$24,694
Oct 201305,97297.423.78$22,570
Sep 20131685,346104.113.72$37,366
Aug 201305,991104.253.52$21,104
Jul 201306,470102.523.72$24,054
Jun 20131594,31794.403.93$31,990
May 20132233,85294.834.15$37,129
Apr 2013781,32693.964.28$13,008
Mar 20134538293.623.91$5,708
Feb 2013241,10591.233.42$5,969
Jan 2013036591.603.42$1,248
Dec 2012042386.773.42$1,447
Nov 2012042486.953.62$1,537
Oct 20124248889.383.40$5,413
Sep 201201194.672.92$32
Aug 2012042792.662.91$1,242
Jul 2012063985.133.02$1,930
Jun 20121552879.822.52$2,527
May 20121757791.612.49$2,993
Apr 20120514101.652.00$1,026
Mar 201226523105.052.22$3,893
Feb 20120534101.102.57$1,373
Jan 2012045098.092.73$1,230
Dec 20113654496.873.24$5,250
Nov 20114264995.723.31$6,169
Oct 2011299384.983.65$3,793
Sep 2011461,10183.623.99$8,235
Aug 20115599583.404.15$8,716
Jul 201121,19194.144.52$5,568
Jun 2011421,31892.904.64$10,017
May 2011481,52498.134.40$11,423
Apr 2011871,060105.964.33$13,812
Mar 201105496.364.06$219
Feb 2011521,61085.644.18$11,183
Jan 2011621,87886.504.59$13,981
Dec 2010481,91885.734.35$12,454
Nov 2010441,63680.843.80$9,766
Oct 20101122,21378.103.51$16,512
Sep 2010662,51672.633.98$14,806
Aug 2010612,58573.684.42$15,919
Jul 20101172,61272.554.74$20,860
Jun 2010742,66970.364.91$18,313
May 20101352,62371.124.24$20,710
Apr 2010432,54781.694.12$14,013
Mar 2010862,52078.394.39$17,801
Feb 20101542,61373.585.44$25,552
Jan 2010363,02474.365.96$20,712
Dec 20091032,44871.445.48$20,783
Nov 20091042,56074.593.75$17,361
Oct 2009992,84372.544.11$18,867
Sep 20091252,72165.543.06$16,532
Aug 2009752,87467.423.22$14,306
Jul 20091453,00861.133.46$19,285
Jun 20091272,91566.163.90$19,756
May 20091433,05154.743.93$19,805
Apr 200903,34246.773.59$11,989
Mar 20091223,42842.144.06$19,055
Feb 20091323,28032.814.63$19,527
Jan 20091423,53835.865.37$24,095
Dec 20081515,22737.105.98$36,845
Nov 20081365,06855.496.86$42,315
Oct 20083308,02375.246.92$80,364
Sep 20081336,751101.767.88$66,712
Aug 20082197,326114.228.48$87,161
Jul 20083678,336131.0811.39$143,049
Jun 20083339,302131.3313.03$164,962
May 200844011,754123.1711.57$190,239
Apr 200838014,302110.3110.45$191,443
Mar 20086041,476101.909.66$75,812
Feb 200866421,42392.538.77$249,332
Jan 20081,25342,70690.388.21$463,680
Dec 20072694,72288.337.30$58,241

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   91 Mcf  × $  2.87 =       $261

────────────────────────────────────────────────────
Month total                                     $261

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/234795 is the state's own key, not one this site invented.