CARR 12

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228064District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.8 M
Aug 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
238
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-08-14174417
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,011 bbl$76,552
GasProduction322,480 Mcf$1,727,565
Total$1,804,117

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6842, -100.3297. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.68424, -100.32972 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,706 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,706 ft.

Completions filed
Aug 2006
1 of 1 wells

1 well

42-211336071225P11,706 ftAug 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (238)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

238 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202338085.443.09$3,247
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 2020037234.901.69$629
May 2020038416.921.81$697
Apr 2020037214.751.80$671
Mar 2020038430.341.86$713
Feb 2020036049.881.98$713
Jan 2020038457.252.09$804
Dec 2019038459.012.30$885
Nov 2019037255.302.75$1,023
Oct 2019038453.472.42$929
Sep 2019037255.052.66$989
Aug 2019038453.112.30$885
Jul 2019038456.272.46$945
Jun 2019037252.782.49$927
May 2019038458.482.74$1,052
Apr 201915537262.632.75$10,731
Mar 2019087356.803.06$2,673
Feb 2019081750.852.79$2,281
Jan 2019094546.033.23$3,051
Dec 2018096746.594.19$4,047
Nov 2018093952.934.24$3,979
Oct 2018091661.443.40$3,113
Sep 2018079759.543.11$2,477
Aug 2018084759.403.07$2,597
Jul 2018093165.142.93$2,730
Jun 2018089960.183.08$2,766
May 2018089165.382.90$2,585
Apr 2018082563.842.90$2,393
Mar 2018092861.222.79$2,586
Feb 2018081661.782.77$2,257
Jan 2018093762.874.01$3,757
Dec 2017094957.272.92$2,773
Nov 2017093155.423.12$2,903
Oct 201701,06349.292.98$3,172
Sep 2017098047.523.09$3,026
Aug 2017099945.373.00$3,001
Jul 201701,09843.873.09$3,390
Jun 201701,06942.493.09$3,300
May 201701,09845.373.26$3,583
Apr 2017099347.933.21$3,189
Mar 201701,04446.772.98$3,115
Feb 2017096050.452.95$2,835
Jan 201701,05949.413.42$3,621
Dec 201601,04448.763.72$3,887
Nov 2016069342.492.64$1,833
Oct 2016075646.193.09$2,336
Sep 2016073741.553.10$2,285
Aug 2016065541.442.92$1,915
Jul 2016037941.622.92$1,108
Jun 2016070145.352.69$1,883
May 2016074642.521.99$1,485
Apr 2016073936.561.99$1,471
Mar 2016074333.011.79$1,333
Feb 2016089226.472.06$1,841
Jan 2016090027.352.36$2,128
Dec 201501,11432.362.00$2,230
Nov 201501,15538.792.17$2,503
Oct 201501,16043.552.43$2,815
Sep 201501,14342.992.76$3,153
Aug 201501,55240.162.87$4,458
Jul 201501,08048.152.95$3,181
Jun 201501,03256.152.88$2,975
May 201501,04155.212.96$3,077
Apr 201501,07649.822.71$2,912
Mar 2015095142.892.93$2,791
Feb 201501,31044.662.98$3,899
Jan 201511,12643.433.10$3,535
Dec 201401,04854.693.59$3,764
Nov 2014093470.464.25$3,971
Oct 2014091478.303.90$3,565
Sep 2014098886.164.05$3,997
Aug 201401,16689.394.04$4,705
Jul 201401,21596.564.18$5,078
Jun 201401,18498.164.74$5,608
May 201401,22594.734.73$5,790
Apr 201401,25295.944.81$6,021
Mar 201401,27395.895.06$6,437
Feb 201401,21497.406.19$7,517
Jan 201421,25190.404.86$6,262
Dec 201301,37391.824.35$5,979
Nov 201301,35788.853.74$5,073
Oct 201301,39697.423.78$5,276
Sep 201301,363104.113.72$5,067
Aug 201301,435104.253.52$5,055
Jul 201301,442102.523.72$5,361
Jun 201301,39794.403.93$5,495
May 201301,39694.834.15$5,792
Apr 201301,31793.964.28$5,640
Mar 201301,47293.623.91$5,760
Feb 201301,76491.233.42$6,033
Jan 201301,49991.603.42$5,126
Dec 201201,53986.773.42$5,264
Nov 201211,41686.953.62$5,220
Oct 201211,59689.383.40$5,515
Sep 201221,34894.672.92$4,123
Aug 201211,13592.662.91$3,393
Jul 201251,38085.133.02$4,594
Jun 201231,42479.822.52$3,827
May 201231,44891.612.49$3,878
Apr 201201,481101.652.00$2,957
Mar 201231,290105.052.22$3,182
Feb 201201,538101.102.57$3,953
Jan 201202,09598.092.73$5,728
Dec 201101,53896.873.24$4,983
Nov 201101,35895.723.31$4,497
Oct 201101,60284.983.65$5,845
Sep 201101,50583.623.99$5,999
Aug 201101,04283.404.15$4,324
Jul 201101,24994.144.52$5,642
Jun 201101,36792.904.64$6,343
May 201101,88998.134.40$8,321
Apr 201101,921105.964.33$8,324
Mar 201101,06696.364.06$4,325
Feb 201101,08785.644.18$4,544
Jan 201101,72786.504.59$7,925
Dec 201001,88285.734.35$8,182
Nov 201001,96580.843.80$7,458
Oct 201001,93178.103.51$6,776
Sep 201001,79272.633.98$7,131
Aug 201001,93473.684.42$8,547
Jul 201001,80372.554.74$8,540
Jun 201001,88770.364.91$9,266
May 2010751,95671.124.24$13,618
Apr 201001,97481.694.12$8,138
Mar 201002,14278.394.39$9,401
Feb 201001,89873.585.44$10,330
Jan 201002,35274.365.96$14,028
Dec 200902,18571.445.48$11,982
Nov 200902,00974.593.75$7,537
Oct 200902,07072.544.11$8,508
Sep 200902,14465.543.06$6,571
Aug 200902,21467.423.22$7,126
Jul 200901,83361.133.46$6,350
Jun 200902,00566.163.90$7,809
May 20091702,47454.743.93$19,018
Apr 200902,44046.773.59$8,754
Mar 200902,50242.144.06$10,156
Feb 200902,25032.814.63$10,424
Jan 200902,27335.865.37$12,208
Dec 200802,54537.105.98$15,212
Nov 200801055.496.86$69
Oct 200803475.246.92$235
Sep 200802,572101.767.88$20,260
Aug 200802,593114.228.48$21,996
Jul 200803,064131.0811.39$34,897
Jun 20081873,291131.3313.03$67,449
May 200803,336123.1711.57$38,612
Apr 200803,411110.3110.45$35,662
Mar 200803,588101.909.66$34,675
Feb 200803,55892.538.77$31,206
Jan 200803,57390.388.21$29,319
Dec 200703,29088.337.30$24,023
Nov 200703,75791.677.29$27,395
Oct 200703,65882.856.92$25,321
Sep 200703,79975.846.24$23,722
Aug 20071754,68269.066.39$41,994
Jul 200704,89570.906.39$31,269
Jun 200704,96862.007.55$37,501
May 200705,42658.747.85$42,574
Apr 200705,46259.617.81$42,632
Mar 200706,25056.927.30$45,637
Feb 200706,13555.108.22$50,405
Jan 200707,65350.306.73$51,481
Dec 200608,93356.656.92$61,802
Nov 200609,84354.207.62$74,979
Oct 200618912,91454.906.01$88,038
Sep 2006024,92960.085.04$125,572
Aug 200604,52068.717.34$33,176

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            38 bbl  × $ 85.44 =     $3,247
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $3,247

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/228064 is the state's own key, not one this site invented.