PEAK BOURASSA

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228140District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.7 M
Mar 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
231
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-08-20176399
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,857 bbl$265,680
GasProduction414,069 Mcf$2,387,569
Total$2,653,249

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7055, -100.3073. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.70547, -100.30730 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,925 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,925 ft.

Completions filed
Mar 2007
1 of 1 wells

1 well

42-21133806707A12,925 ftMar 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (231)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

231 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 202212081.844.54$982
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200416.921.81$7
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190559.012.30$12
Nov 20190455.302.75$11
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190356.272.46$7
Jun 20190552.782.49$12
May 20190758.482.74$19
Apr 201901062.632.75$28
Mar 201907556.803.06$230
Feb 201904750.852.79$131
Jan 2019010146.033.23$326
Dec 20188711146.594.19$4,518
Nov 2018045652.934.24$1,932
Oct 201831,35661.443.40$4,792
Sep 201801,05559.543.11$3,279
Aug 2018111,29659.403.07$4,628
Jul 201801,21865.142.93$3,571
Jun 201851,01660.183.08$3,427
May 201831,10565.382.90$3,402
Apr 20181191,11263.842.90$10,823
Mar 201801,03161.222.79$2,873
Feb 2018369061.782.77$2,094
Jan 201801,01562.874.01$4,069
Dec 201721,09557.272.92$3,314
Nov 20171141,29955.423.12$10,369
Oct 201721,27549.292.98$3,903
Sep 201721,19747.523.09$3,791
Aug 201701,33345.373.00$4,005
Jul 201741,51143.873.09$4,840
Jun 20171131,21442.493.09$8,549
May 201761,36045.373.26$4,710
Apr 201701,24547.933.21$3,998
Mar 201731,29746.772.98$4,010
Feb 2017397150.452.95$3,018
Jan 2017392549.413.42$3,311
Dec 201631,06848.763.72$4,122
Nov 20161171,42342.492.64$8,734
Oct 201631,57646.193.09$5,009
Sep 201601,58141.553.10$4,902
Aug 201641,37541.442.92$4,187
Jul 201601,34141.622.92$3,922
Jun 201631,70345.352.69$4,710
May 201641,62842.521.99$3,411
Apr 201662,06236.561.99$4,325
Mar 2016791,77633.011.79$5,794
Feb 201641,87026.472.06$3,965
Jan 201642,10827.352.36$5,093
Dec 201551,98232.362.00$4,129
Nov 20151391,64038.792.17$8,946
Oct 201581,36343.552.43$3,656
Sep 201501,47042.992.76$4,055
Aug 201502,28440.162.87$6,561
Jul 20151392,34648.152.95$13,602
Jun 20151172,74956.152.88$14,495
May 201502,92955.212.96$8,657
Apr 201562,85749.822.71$8,032
Mar 20151273,10542.892.93$14,559
Feb 201502,47244.662.98$7,357
Jan 201502,72443.433.10$8,446
Dec 2014132,37454.693.59$9,237
Nov 20141072,99870.464.25$20,286
Oct 201403,16578.303.90$12,347
Sep 2014352,74486.164.05$14,116
Aug 2014142,08289.394.04$9,653
Jul 20141042,44696.564.18$20,266
Jun 2014223,11698.164.74$16,920
May 2014373,82094.734.73$21,560
Apr 2014261,96595.944.81$11,944
Mar 201401,03795.895.06$5,244
Feb 2014082797.406.19$5,121
Jan 201401,00090.404.86$4,861
Dec 2013296091.824.35$4,364
Nov 201321,02088.853.74$3,991
Oct 2013097697.423.78$3,689
Sep 20132953104.113.72$3,751
Aug 201324968104.253.52$5,912
Jul 201321,045102.523.72$4,090
Jun 2013394794.403.93$4,008
May 2013321,07094.834.15$7,474
Apr 201321,06793.964.28$4,757
Mar 201301,00893.623.91$3,944
Feb 2013087891.233.42$3,003
Jan 2013098191.603.42$3,355
Dec 201201,10786.773.42$3,786
Nov 201201,11486.953.62$4,038
Oct 201201,13189.383.40$3,845
Sep 20120094.672.92$0
Aug 201201,06792.662.91$3,103
Jul 201211,05885.133.02$3,281
Jun 201201,44279.822.52$3,632
May 2012090191.612.49$2,242
Apr 20121011,443101.652.00$13,148
Mar 2012111,771105.052.22$5,091
Feb 201251,610101.102.57$4,644
Jan 201261,89998.092.73$5,781
Dec 201101,99696.873.24$6,467
Nov 201152,11995.723.31$7,495
Oct 201132,27684.983.65$8,559
Sep 201172,37783.623.99$10,060
Aug 201102,30483.404.15$9,560
Jul 201182,03394.144.52$9,937
Jun 201151,63892.904.64$8,065
May 201121,54698.134.40$7,006
Apr 2011841,468105.964.33$15,262
Mar 201121,58196.364.06$6,607
Feb 201121,79885.644.18$7,687
Jan 201162,03686.504.59$9,862
Dec 201042,09185.734.35$9,434
Nov 201042,24780.843.80$8,851
Oct 201062,13778.103.51$7,967
Sep 201052,23472.633.98$9,253
Aug 201062,27673.684.42$10,501
Jul 201032,28572.554.74$11,041
Jun 2010132,23170.364.91$11,870
May 2010112,30471.124.24$10,540
Apr 2010112,34181.694.12$10,550
Mar 2010892,48178.394.39$17,865
Feb 2010112,19173.585.44$12,734
Jan 2010112,52474.365.96$15,871
Dec 2009122,59771.445.48$15,099
Nov 2009102,49274.593.75$10,095
Oct 200972,52272.544.11$10,874
Sep 2009152,50365.543.06$8,654
Aug 200902,39867.423.22$7,718
Jul 2009142,45461.133.46$9,358
Jun 200992,23066.163.90$9,281
May 20091322,42354.743.93$16,738
Apr 200962,70346.773.59$9,978
Mar 200973,28842.144.06$13,641
Feb 200992,88932.814.63$13,680
Jan 200983,83735.865.37$20,895
Dec 200814,68837.105.98$28,058
Nov 200834,87155.496.86$33,583
Oct 200865,19575.246.92$36,411
Sep 200835,407101.767.88$42,897
Aug 200875,750114.228.48$49,577
Jul 200896,080131.0811.39$70,427
Jun 20081346,332131.3313.03$100,121
May 2008128,173123.1711.57$96,075
Apr 20081195,371110.3110.45$69,280
Mar 2008136,912101.909.66$68,123
Feb 2008167,38192.538.77$66,216
Jan 200898,45690.388.21$70,201
Dec 2007108,66988.337.30$64,184
Nov 20071158,58491.677.29$73,134
Oct 200778,22082.856.92$57,479
Sep 20071449,16075.846.24$68,117
Aug 20071110,07569.066.39$65,118
Jul 200714910,58070.906.39$78,149
Jun 20072011,49962.007.55$88,040
May 200720814,64858.747.85$127,150
Apr 200720820,18959.617.81$169,978
Mar 200731227,11356.927.30$215,737

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2022 — as filed, then multipliedworked
Condensate            12 bbl  × $ 81.84 =       $982
Gas                    0 Mcf  × $  4.54 =         $0

────────────────────────────────────────────────────
Month total                                     $982

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/228140 is the state's own key, not one this site invented.