PEAK BOURASSA

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 230444District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.6 M
Jul 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-12-07179222
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,446 bbl$185,369
GasProduction399,070 Mcf$2,409,881
Total$2,595,251

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6966, -100.3054. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.69664, -100.30544 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,989 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,989 ft.

Completions filed
Jul 2007
1 of 1 wells

1 well

42-21133914120712,989 ftJul 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 2024013076.091.78$232
Jan 2024012773.023.30$419
Dec 2023014071.262.61$366
Nov 202315212977.892.81$12,201
Oct 2023015085.443.09$463
Sep 2023013789.042.74$375
Aug 2023014680.522.67$390
Jul 2023014874.852.64$391
Jun 2023015768.962.26$355
May 2023018570.622.23$412
Apr 2023016578.122.24$369
Mar 2023030572.852.39$730
Feb 2023025275.112.47$621
Jan 2023031476.533.39$1,064
Dec 2022027876.415.73$1,593
Nov 2022025885.005.65$1,457
Oct 2022024587.185.86$1,437
Sep 2022023884.888.16$1,943
Aug 2022020394.529.13$1,853
Jul 20220172101.587.54$1,297
Jun 20220156115.097.98$1,244
May 20220205109.378.43$1,729
Apr 20220207104.226.84$1,415
Mar 20220212108.885.08$1,076
Feb 2022025491.054.86$1,234
Jan 2022021581.844.54$976
Dec 2021022471.323.90$873
Nov 2021023677.435.24$1,236
Oct 2021026979.795.71$1,537
Sep 2021043469.865.35$2,322
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 2020842136.972.48$3,158
Sep 202005437.091.99$108
Aug 2020020139.982.39$479
Jul 2020020538.371.83$374
Jun 2020021934.901.69$370
May 2020022116.921.81$401
Apr 2020019614.751.80$354
Mar 2020019730.341.86$366
Feb 2020018749.881.98$370
Jan 2020020357.252.09$425
Dec 2019018759.012.30$431
Nov 2019018755.302.75$514
Oct 2019025653.472.42$619
Sep 2019016855.052.66$446
Aug 2019017353.112.30$399
Jul 2019017456.272.46$428
Jun 2019017652.782.49$438
May 2019018858.482.74$515
Apr 2019218762.632.75$640
Mar 2019018456.803.06$563
Feb 2019016750.852.79$466
Jan 2019018846.033.23$607
Dec 2018018146.594.19$758
Nov 2018017552.934.24$742
Oct 2018029361.443.40$996
Sep 2018026959.543.11$836
Aug 201807759.403.07$236
Jul 2018013965.142.93$408
Jun 2018017760.183.08$545
May 2018018865.382.90$545
Apr 2018015663.842.90$453
Mar 2018010461.222.79$290
Feb 2018011861.782.77$326
Jan 201807762.874.01$309
Dec 201709957.272.92$289
Nov 2017010655.423.12$331
Oct 2017010349.292.98$307
Sep 2017016847.523.09$519
Aug 2017017845.373.00$535
Jul 2017019043.873.09$587
Jun 2017013942.493.09$429
May 2017016545.373.26$538
Apr 201709347.933.21$299
Mar 2017011446.772.98$340
Feb 201709850.452.95$289
Jan 2017010649.413.42$362
Dec 201608348.763.72$309
Nov 2016014842.492.64$391
Oct 201602646.193.09$80
Sep 201603541.553.10$109
Aug 20160441.442.92$12
Jul 20160441.622.92$12
Jun 20160045.352.69$0
May 201606042.521.99$119
Apr 201611,30436.561.99$2,633
Mar 201611,38433.011.79$2,516
Feb 201601,22326.472.06$2,524
Jan 201611,29627.352.36$3,092
Dec 201511,32832.362.00$2,690
Nov 201511,34038.792.17$2,943
Oct 201511,39143.552.43$3,419
Sep 201501,30442.992.76$3,597
Aug 201501,45440.162.87$4,177
Jul 201521,50048.152.95$4,514
Jun 201511,41256.152.88$4,127
May 201501,45555.212.96$4,300
Apr 201511,39349.822.71$3,820
Mar 201541,45042.892.93$4,427
Feb 201501,28044.662.98$3,810
Jan 20151671,64743.433.10$12,360
Dec 201451,57354.693.59$5,923
Nov 201401,46970.464.25$6,246
Oct 201401,51778.303.90$5,918
Sep 201461,41986.164.05$6,257
Aug 201441,43289.394.04$6,136
Jul 201441,43196.564.18$6,367
Jun 201481,29598.164.74$6,920
May 201401,02794.734.73$4,854
Apr 2014089295.944.81$4,290
Mar 201401,35195.895.06$6,832
Feb 2014094697.406.19$5,858
Jan 2014093690.404.86$4,550
Dec 2013285591.824.35$3,907
Nov 2013281188.853.74$3,209
Oct 2013079397.423.78$2,997
Sep 201327747104.113.72$5,588
Aug 20130735104.253.52$2,589
Jul 20131746102.523.72$2,876
Jun 2013173894.403.93$2,997
May 2013174694.834.15$3,190
Apr 2013073993.964.28$3,165
Mar 2013076893.623.91$3,005
Feb 2013075591.233.42$2,582
Jan 2013077391.603.42$2,644
Dec 20123661986.773.42$5,241
Nov 2012040986.953.62$1,483
Oct 2012062189.383.40$2,111
Sep 20120794.672.92$20
Aug 2012048492.662.91$1,408
Jul 20128464585.133.02$9,099
Jun 201211,86379.822.52$4,773
May 201281,24091.612.49$3,818
Apr 201221,931101.652.00$4,059
Mar 201292,475105.052.22$6,445
Feb 201252,162101.102.57$6,062
Jan 201282,52398.092.73$7,683
Dec 201102,62996.873.24$8,517
Nov 201172,65595.723.31$9,461
Oct 201142,65984.983.65$10,041
Sep 201192,57283.623.99$11,004
Aug 201172,84883.404.15$12,401
Jul 201172,84794.144.52$13,520
Jun 2011102,72492.904.64$13,568
May 2011592,73998.134.40$17,854
Apr 2011102,355105.964.33$11,264
Mar 201102,44296.364.06$9,908
Feb 201162,11785.644.18$9,363
Jan 2011122,49586.504.59$12,487
Dec 201042,35385.734.35$10,573
Nov 201032,23780.843.80$8,733
Oct 2010982,36478.103.51$15,949
Sep 201022,52372.633.98$10,185
Aug 2010942,70073.684.42$18,858
Jul 201032,64372.554.74$12,736
Jun 2010132,58870.364.91$13,623
May 20101142,98171.124.24$20,733
Apr 20101173,03981.694.12$22,087
Mar 2010153,34278.394.39$15,843
Feb 20101202,99573.585.44$25,129
Jan 20101863,43974.365.96$34,341
Dec 2009153,46771.445.48$20,084
Nov 2009143,19674.593.75$13,034
Oct 200993,34272.544.11$14,389
Sep 2009133,42365.543.06$11,343
Aug 200903,67067.423.22$11,812
Jul 2009123,68961.133.46$13,514
Jun 200963,59166.163.90$14,384
May 20091803,82854.743.93$24,881
Apr 200943,89946.773.59$14,175
Mar 200973,82142.144.06$15,804
Feb 200973,67632.814.63$17,261
Jan 200977,51535.865.37$40,614
Dec 2008210,07337.105.98$60,282
Nov 200839,03055.496.86$62,116
Oct 2008510,05775.246.92$69,991
Sep 200814610,101101.767.88$94,423
Aug 2008710,413114.228.48$89,133
Jul 200889,416131.0811.39$108,292
Jun 200879,444131.3313.03$123,999
May 2008159,436123.1711.57$111,063
Apr 2008108,861110.3110.45$93,744
Mar 2008168,640101.909.66$85,128
Feb 20081398,29492.538.77$85,605
Jan 20081210,22090.388.21$84,947
Dec 20071612,01388.337.30$89,132
Nov 20071413,06491.677.29$96,542
Oct 20074315,81882.856.92$113,054
Sep 200710019,55575.846.24$129,689
Aug 20076236,33769.066.39$236,400
Jul 2007341,15870.906.39$9,808

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 76.09 =         $0
Gas                  130 Mcf  × $  1.78 =       $232

────────────────────────────────────────────────────
Month total                                     $232

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/230444 is the state's own key, not one this site invented.