BYRUM 4

Operated by BCE-MACH III LLC (P-5 40209) in the RED DEER CREEK (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228700District 10Field 752003002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.4 M
Jun 2007 – May 2026
Value, last 12 filed months
$225
at the published price for each month
Months reported
228
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 157 leases and 157 wells, and the rule below applies to all of them.

Discovered
1978-03-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2008-09-09.

The Commission's schedule remark for this field reads: AND PLAT AS LONG AS THE ALLOCATION IS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-09-27177473
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6,389 bbl$513,390
GasProduction165,382 Mcf$877,886
Total$1,391,276

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7564, -100.5929. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.75638, -100.59293 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,072 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,072 ft.

Completions filed
Jun 2007
1 of 1 wells

1 well

42-393319651911,072 ftJun 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (228)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

228 months

May 2026074106.413.05$225
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 201855959.543.11$3,303
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 201511813843.552.43$5,474
Sep 2015385242.992.76$2,479
Aug 2015286240.162.87$2,556
Jul 201518783448.152.95$11,460
Jun 2015641156.152.88$1,522
May 2015833555.212.96$1,432
Apr 2015123849.822.71$694
Mar 2015015042.892.93$440
Feb 2015148444.662.98$1,485
Jan 201531,64343.433.10$5,225
Dec 201491,33954.693.59$5,301
Nov 201419188470.464.25$17,216
Oct 2014284578.303.90$3,453
Sep 2014355586.164.05$2,504
Aug 2014190289.394.04$3,729
Jul 201441,21896.564.18$5,477
Jun 201411,06898.164.74$5,157
May 2014395594.734.73$4,798
Apr 201421,18995.944.81$5,910
Mar 201451,25995.895.06$6,846
Feb 201411,46697.406.19$9,175
Jan 201401,22290.404.86$5,940
Dec 2013296491.824.35$4,381
Nov 201391,24188.853.74$5,439
Oct 2013070397.423.78$2,657
Sep 20130869104.113.72$3,231
Aug 201301,208104.253.52$4,255
Jul 20131731,241102.523.72$22,350
Jun 2013076994.403.93$3,025
May 201301,11494.834.15$4,622
Apr 2013095493.964.28$4,086
Mar 201301,03093.623.91$4,030
Feb 201318195891.233.42$19,789
Jan 2013059791.603.42$2,042
Dec 2012086886.773.42$2,969
Nov 2012087086.953.62$3,154
Oct 201217188389.383.40$18,286
Sep 201201,43094.672.92$4,173
Aug 201201,50092.662.91$4,362
Jul 201201,62985.133.02$4,921
Jun 20121831,27879.822.52$17,826
May 201201,22291.612.49$3,041
Apr 201201,557101.652.00$3,109
Mar 201201,328105.052.22$2,951
Feb 20121871,317101.102.57$22,291
Jan 201201,42898.092.73$3,904
Dec 201101,60196.873.24$5,187
Nov 20111792,01895.723.31$23,816
Oct 201102,21084.983.65$8,063
Sep 201101,87183.623.99$7,457
Aug 201101,71683.404.15$7,120
Jul 20111701,75794.144.52$23,941
Jun 201102,15492.904.64$9,994
May 201102,56298.134.40$11,285
Apr 20111772,576105.964.33$29,917
Mar 201102,88696.364.06$11,709
Feb 20111792,03085.644.18$23,815
Jan 201102,94986.504.59$13,532
Dec 20101793,01185.734.35$28,437
Nov 20101853,00380.843.80$26,353
Oct 201004,20278.103.51$14,744
Sep 20103335,17872.633.98$44,791
Aug 20101683,36373.684.42$27,241
Jul 201001,56072.554.74$7,389
Jun 201004470.364.91$216
May 201007271.124.24$305
Apr 2010011181.694.12$458
Mar 20101668978.394.39$13,403
Feb 2010011173.585.44$604
Jan 2010014474.365.96$859
Dec 2009013271.445.48$724
Nov 2009013174.593.75$491
Oct 200909172.544.11$374
Sep 2009013265.543.06$405
Aug 2009054267.423.22$1,744
Jul 2009075661.133.46$2,619
Jun 2009080566.163.90$3,135
May 2009074454.743.93$2,921
Apr 2009082246.773.59$2,949
Mar 2009065042.144.06$2,638
Feb 2009073732.814.63$3,415
Jan 200901,89135.865.37$10,157
Dec 2008075137.105.98$4,489
Nov 2008065755.496.86$4,507
Oct 2008092375.246.92$6,389
Sep 2008175836101.767.88$24,393
Aug 200801,962114.228.48$16,644
Jul 200801,859131.0811.39$21,173
Jun 20080935131.3313.03$12,186
May 20081801,511123.1711.57$39,659
Apr 200801,649110.3110.45$17,240
Mar 20081781,822101.909.66$35,746
Feb 200801,87792.538.77$16,462
Jan 20081922,52490.388.21$38,064
Dec 200733,18988.337.30$23,551
Nov 20071983,64591.677.29$44,729
Oct 20071845,12682.856.92$50,726
Sep 20073706,02275.846.24$65,663
Aug 20073637,97169.066.39$75,987
Jul 20075518,21070.906.39$91,511
Jun 200774713,37262.007.55$147,252

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   74 Mcf  × $  3.05 =       $225

────────────────────────────────────────────────────
Month total                                     $225

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/228700 is the state's own key, not one this site invented.