PEAK-WALSER

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 230133District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.8 M
Jun 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
228
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-12-07179220
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5,080 bbl$425,484
GasProduction551,259 Mcf$3,382,926
Total$3,808,410

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6789, -100.3769. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.67891, -100.37694 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,115 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,115 ft.

Completions filed
Jun 2007
1 of 1 wells

1 well

42-21133868142913,115 ftJun 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (228)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

228 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20191162.632.75$65
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20161045.352.69$45
May 20162042.521.99$85
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 201516032.362.00$518
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20151071,42642.892.93$8,774
Feb 201511,39644.662.98$4,199
Jan 201511,40743.433.10$4,406
Dec 201411,86554.693.59$6,753
Nov 201401,95570.464.25$8,312
Oct 201402,11878.303.90$8,262
Sep 201401,95986.164.05$7,925
Aug 201432,16289.394.04$8,992
Jul 201491,88296.564.18$8,735
Jun 201471,67898.164.74$8,636
May 2014141,68594.734.73$9,290
Apr 2014131,77895.944.81$9,798
Mar 201401,59095.895.06$8,040
Feb 2014941,51997.406.19$18,561
Jan 201401,74590.404.86$8,482
Dec 201301,40191.824.35$6,101
Nov 201301,71088.853.74$6,392
Oct 201301,74497.423.78$6,591
Sep 201301,604104.113.72$5,963
Aug 201301,945104.253.52$6,851
Jul 201301,962102.523.72$7,294
Jun 201371,72994.403.93$7,462
May 2013922,07294.834.15$17,321
Apr 2013221,99793.964.28$10,619
Mar 2013182,11793.623.91$9,969
Feb 2013882,15791.233.42$15,405
Jan 2013142,44591.603.42$9,644
Dec 201292,26186.773.42$8,514
Nov 2012411,98186.953.62$10,746
Oct 2012972,38789.383.40$16,785
Sep 201203494.672.92$99
Aug 201292,49192.662.91$8,078
Jul 2012752,43885.133.02$13,749
Jun 2012122,49779.822.52$7,248
May 2012772,61891.612.49$13,568
Apr 201252,610101.652.00$5,720
Mar 2012762,745105.052.22$14,083
Feb 2012672,713101.102.57$13,747
Jan 201203,14198.092.73$8,588
Dec 2011563,15396.873.24$15,640
Nov 2011113,13595.723.31$11,434
Oct 2011103,35884.983.65$13,102
Sep 2011723,01383.623.99$18,030
Aug 2011273,16583.404.15$15,384
Jul 2011142,85494.144.52$14,210
Jun 201173,23792.904.64$15,670
May 2011713,68398.134.40$23,190
Apr 201183,651105.964.33$16,668
Mar 2011653,64196.364.06$21,036
Feb 201112,57485.644.18$10,845
Jan 201154,21986.504.59$19,793
Dec 2010714,19485.734.35$24,321
Nov 201074,04980.843.80$15,933
Oct 2010764,20978.103.51$20,705
Sep 2010724,22372.633.98$22,035
Aug 2010604,63973.684.42$24,922
Jul 201074,73772.554.74$22,945
Jun 2010804,56370.364.91$28,035
May 2010184,81571.124.24$21,673
Apr 2010784,68881.694.12$25,699
Mar 2010214,91478.394.39$23,212
Feb 20101114,39473.585.44$32,081
Jan 2010354,89074.365.96$31,767
Dec 2009745,09271.445.48$33,210
Nov 2009244,87774.593.75$20,086
Oct 2009505,08872.544.11$24,540
Sep 2009624,90265.543.06$19,087
Aug 200905,10867.423.22$16,440
Jul 2009615,08161.133.46$21,332
Jun 2009545,22966.163.90$23,940
May 2009545,22554.743.93$23,468
Apr 2009244,88146.773.59$18,633
Mar 2009495,21342.144.06$23,224
Feb 2009835,13432.814.63$26,509
Jan 2009757,99835.865.37$45,647
Dec 2008106,46137.105.98$38,989
Nov 2008938,62955.496.86$64,359
Oct 20081178,71275.246.92$69,107
Sep 20081048,609101.767.88$78,397
Aug 20087510,655114.228.48$98,953
Jul 200816210,798131.0811.39$144,218
Jun 20082211,270131.3313.03$149,767
May 200816812,393123.1711.57$164,133
Apr 20081612,291110.3110.45$130,266
Mar 200831812,505101.909.66$153,253
Feb 200818612,99692.538.77$131,193
Jan 200818412,26190.388.21$117,240
Dec 20074014,57488.337.30$109,952
Nov 200718816,03191.677.29$134,127
Oct 20077119,46782.856.92$140,633
Sep 200721825,60275.846.24$176,396
Aug 200722238,94569.066.39$264,110
Jul 200722572,06670.906.39$476,306
Jun 2007892,20362.007.55$22,147

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2019 — as filed, then multipliedworked
Condensate             1 bbl  × $ 62.63 =        $63
Gas                    1 Mcf  × $  2.75 =         $3

────────────────────────────────────────────────────
Month total                                      $65

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/230133 is the state's own key, not one this site invented.