PEAK-WALSER

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 218313District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
Mar 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
243
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-11-21170473
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,519 bbl$143,864
GasProduction195,940 Mcf$1,155,437
Total$1,299,301

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6839, -100.3748. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.68394, -100.37483 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,800 ft.

Completions filed
Mar 2006
1 of 1 wells

1 well

42-21133320112912,800 ftMar 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (243)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

243 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20191062.632.75$63
Mar 20191056.803.06$57
Feb 20192050.852.79$102
Jan 20190046.033.23$0
Dec 201801946.594.19$80
Nov 201847452.934.24$525
Oct 2018610561.443.40$725
Sep 2018711259.543.11$765
Aug 2018197559.403.07$1,359
Jul 20181211865.142.93$1,128
Jun 20181112460.183.08$1,044
May 2018717765.382.90$971
Apr 20181119063.842.90$1,253
Mar 2018020361.222.79$566
Feb 2018515861.782.77$746
Jan 2018012962.874.01$517
Dec 2017521457.272.92$912
Nov 2017729755.423.12$1,314
Oct 2017828349.292.98$1,239
Sep 2017811447.523.09$732
Aug 2017820645.373.00$982
Jul 2017920643.873.09$1,031
Jun 20171126842.493.09$1,295
May 20174694945.373.26$5,184
Apr 20171021,15947.933.21$8,611
Mar 2017611,43746.772.98$7,141
Feb 2017521,33150.452.95$6,553
Jan 20171181,85849.413.42$12,183
Dec 2016662,28048.763.72$11,706
Nov 2016622,45742.492.64$9,132
Oct 20161133,80446.193.09$16,975
Sep 20161995,09841.553.10$24,075
Aug 2016816,77441.442.92$23,166
Jul 20161396,13341.622.92$23,720
Jun 20161337,03345.352.69$24,921
May 20161076,46042.521.99$17,412
Apr 201602,38736.561.99$4,753
Mar 201607633.011.79$136
Feb 201607426.472.06$153
Jan 201607827.352.36$184
Dec 201595632.362.00$403
Nov 201508238.792.17$178
Oct 2015021943.552.43$531
Sep 2015022942.992.76$632
Aug 2015041640.162.87$1,195
Jul 201508048.152.95$236
Jun 201504256.152.88$121
May 201503955.212.96$115
Apr 201506449.822.71$173
Mar 201514842.892.93$184
Feb 201505144.662.98$152
Jan 201503143.433.10$96
Dec 201401954.693.59$68
Nov 201404170.464.25$174
Oct 201403578.303.90$137
Sep 20140186.164.05$4
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 201402097.406.19$124
Jan 201408890.404.86$428
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120986.953.62$33
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20121091.612.49$92
Apr 2012024101.652.00$48
Mar 2012120105.052.22$149
Feb 2012137101.102.57$196
Jan 20120098.092.73$0
Dec 2011314096.873.24$744
Nov 2011018895.723.31$623
Oct 2011016284.983.65$591
Sep 2011418383.623.99$1,064
Aug 2011225883.404.15$1,237
Jul 2011016694.144.52$750
Jun 2011019292.904.64$891
May 2011321398.134.40$1,233
Apr 20110297105.964.33$1,287
Mar 201153396.364.06$616
Feb 201191,09585.644.18$5,348
Jan 201117186.504.59$412
Dec 2010310085.734.35$692
Nov 2010014880.843.80$562
Oct 2010721678.103.51$1,305
Sep 2010119472.633.98$1,173
Aug 201051,23373.684.42$5,817
Jul 20100072.554.74$0
Jun 20102170.364.91$146
May 201005871.124.24$246
Apr 2010324281.694.12$1,243
Mar 2010026178.394.39$1,145
Feb 2010325473.585.44$1,603
Jan 2010027474.365.96$1,634
Dec 2009329071.445.48$1,805
Nov 2009025074.593.75$938
Oct 2009232672.544.11$1,485
Sep 2009230165.543.06$1,054
Aug 2009026367.423.22$846
Jul 2009521061.133.46$1,033
Jun 20091064966.163.90$3,189
May 2009762,00554.743.93$12,031
Apr 200901,47246.773.59$5,281
Mar 200981,15942.144.06$5,042
Feb 2009151,41032.814.63$7,025
Jan 2009131,19335.865.37$6,874
Dec 200801,25337.105.98$7,489
Nov 2008202,20455.496.86$16,230
Oct 2008231,86175.246.92$14,612
Sep 2008181,971101.767.88$17,357
Aug 2008122,109114.228.48$19,261
Jul 2008282,135131.0811.39$27,987
Jun 200802,141131.3313.03$27,903
May 2008272,214123.1711.57$28,951
Apr 200802,252110.3110.45$23,544
Mar 2008592,459101.909.66$29,776
Feb 2008292,26192.538.77$22,514
Jan 2008222,60190.388.21$23,331
Dec 200702,02588.337.30$14,786
Nov 2007222,22891.677.29$18,263
Oct 200712,96182.856.92$20,579
Sep 2007173,36875.846.24$22,320
Aug 200793,76369.066.39$24,659
Jul 2007243,83070.906.39$26,167
Jun 200703,99362.007.55$30,141
May 200714,53058.747.85$35,602
Apr 200714,58259.617.81$35,823
Mar 2007392,33656.927.30$19,277
Feb 2007064755.108.22$5,316
Jan 2007097450.306.73$6,552
Dec 200601,28556.656.92$8,890
Nov 2006742,64354.207.62$24,144
Oct 2006132,16354.906.01$13,722
Sep 2006186860.085.04$4,432
Aug 20061523,30468.717.34$34,695
Jul 200664,08569.376.34$26,326
Jun 20061025,94366.286.38$44,700
May 20062919,39166.016.42$126,501
Apr 200610625,98164.397.36$198,058
Mar 2006556156.707.08$3,551

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2019 — as filed, then multipliedworked
Condensate             1 bbl  × $ 62.63 =        $63
Gas                    0 Mcf  × $  2.75 =         $0

────────────────────────────────────────────────────
Month total                                      $63

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/218313 is the state's own key, not one this site invented.