HELTON

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 230221District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$7.4 M
Jul 2007 – May 2026
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-12-07179223
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition13,687 bbl$1,026,345
GasProduction1,189,250 Mcf$6,369,341
Total$7,395,686

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6132, -100.3359. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.61318, -100.33595 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,540 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,540 ft.

Completions filed
Jul 2007
1 of 1 wells

1 well

42-483323659060A13,540 ftJul 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

May 202600106.413.05$0
Apr 2026046798.932.87$1,340
Mar 2026036289.753.15$1,140
Feb 2026035263.503.75$1,320
Jan 2026016459.138.00$1,312
Dec 2025022756.664.41$1,002
Nov 2025022058.593.93$864
Oct 2025019059.383.30$628
Sep 2025031662.743.08$972
Aug 2025015963.933.01$479
Jul 202502166.743.32$70
Jun 20250066.483.13$0
May 2025042860.553.23$1,383
Apr 2025010062.363.54$354
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 202503474.324.28$145
Dec 2024018268.993.12$568
Nov 202403769.052.20$81
Oct 2024011371.372.28$258
Sep 2024018969.612.36$447
Aug 2024015875.632.06$326
Jul 2024019979.932.15$427
Jun 2024011178.082.63$292
May 202409278.812.20$202
Apr 202408884.451.66$146
Mar 202404280.301.55$65
Feb 2024013176.091.78$234
Jan 2024014573.023.30$478
Dec 202305571.262.61$144
Nov 202307077.892.81$197
Oct 2023011585.443.09$355
Sep 2023012989.042.74$353
Aug 2023010180.522.67$270
Jul 2023011574.852.64$304
Jun 2023012668.962.26$285
May 202309270.622.23$205
Apr 2023021178.122.24$472
Mar 2023037172.852.39$888
Feb 202301875.112.47$44
Jan 202308376.533.39$281
Dec 2022016976.415.73$968
Nov 2022010385.005.65$582
Oct 2022021787.185.86$1,272
Sep 2022033984.888.16$2,767
Aug 2022020394.529.13$1,853
Jul 20220227101.587.54$1,712
Jun 20220332115.097.98$2,648
May 20220490109.378.43$4,132
Apr 20220469104.226.84$3,207
Mar 20220157108.885.08$797
Feb 2022021191.054.86$1,025
Jan 2022033081.844.54$1,497
Dec 2021044771.323.90$1,743
Nov 2021029377.435.24$1,534
Oct 2021031079.795.71$1,771
Sep 2021040769.865.35$2,178
Aug 2021035566.024.22$1,498
Jul 2021039870.783.98$1,585
Jun 20211899269.493.38$4,604
May 202101,11163.483.02$3,353
Apr 202101,21360.362.76$3,346
Mar 202101,16961.302.72$3,176
Feb 2021098457.805.55$5,459
Jan 2021034050.412.81$955
Dec 2020010444.642.68$278
Nov 2020048838.772.71$1,321
Oct 2020072736.972.48$1,802
Sep 2020751,10537.091.99$4,982
Aug 202001,09039.982.39$2,600
Jul 202001,40238.371.83$2,559
Jun 202001,34934.901.69$2,280
May 202002,06816.921.81$3,753
Apr 2020092314.751.80$1,665
Mar 2020081030.341.86$1,504
Feb 202001,37649.881.98$2,725
Jan 202001,40357.252.09$2,939
Dec 201901,37959.012.30$3,178
Nov 201901,45455.302.75$4,000
Oct 201901,61753.472.42$3,911
Sep 201901,55155.052.66$4,121
Aug 201901,78053.112.30$4,102
Jul 2019921,69456.272.46$9,344
Jun 201901,62852.782.49$4,056
May 201901,63658.482.74$4,483
Apr 2019731,79662.632.75$9,512
Mar 2019212,26156.803.06$8,116
Feb 2019131,60550.852.79$5,143
Jan 2019202,56646.033.23$9,204
Dec 2018172,16346.594.19$9,845
Nov 2018822,50952.934.24$14,972
Oct 2018782,47061.443.40$13,186
Sep 201802,52159.543.11$7,835
Aug 201882,79659.403.07$9,049
Jul 2018792,76865.142.93$13,262
Jun 2018863,21160.183.08$15,055
May 2018253,63265.382.90$12,170
Apr 201804,20563.842.90$12,198
Mar 20181014,31761.222.79$18,214
Feb 2018204,22561.782.77$12,922
Jan 20181084,55962.874.01$25,068
Dec 2017114,82957.272.92$14,738
Nov 2017134,38755.423.12$14,401
Oct 20171044,40349.292.98$18,263
Sep 2017124,33947.523.09$13,966
Aug 2017134,11345.373.00$12,947
Jul 20171034,23043.873.09$17,578
Jun 2017154,38442.493.09$14,172
May 20171884,73345.373.26$23,975
Apr 2017164,51347.933.21$15,261
Mar 20171094,91546.772.98$19,763
Feb 20171054,13950.452.95$17,518
Jan 2017194,84449.413.42$17,499
Dec 2016983,65748.763.72$18,393
Nov 2016144,40842.492.64$12,251
Oct 20161104,60346.193.09$19,305
Sep 2016114,44541.553.10$14,239
Aug 2016934,58541.442.92$17,262
Jul 20161614,96241.622.92$21,211
Jun 2016135,01545.352.69$14,059
May 2016114,88742.521.99$10,198
Apr 2016764,67636.561.99$12,089
Mar 2016134,65033.011.79$8,771
Feb 2016784,36226.472.06$11,066
Jan 2016784,13227.352.36$11,903
Dec 2015184,66632.362.00$9,921
Nov 2015104,49538.792.17$10,130
Oct 20151045,26843.552.43$17,312
Sep 20151104,88442.992.76$18,201
Aug 201504,19540.162.87$12,050
Jul 2015104,21348.152.95$12,889
Jun 20151024,13856.152.88$17,657
May 201504,27955.212.96$12,646
Apr 2015243,90749.822.71$11,770
Mar 20151234,11942.892.93$17,364
Feb 20151053,66044.662.98$15,582
Jan 2015964,18843.433.10$17,155
Dec 2014244,14254.693.59$16,188
Nov 2014634,08770.464.25$21,816
Oct 2014395,44478.303.90$24,291
Sep 2014284,74486.164.05$21,604
Aug 2014175,88889.394.04$25,278
Jul 201406,12796.564.18$25,608
Jun 2014235,19898.164.74$26,880
May 201405,49794.734.73$25,982
Apr 2014685,53995.944.81$33,162
Mar 201405,51195.895.06$27,868
Feb 201402,72397.406.19$16,861
Jan 201403,09890.404.86$15,059
Dec 201303,42191.824.35$14,897
Nov 2013523,48588.853.74$17,648
Oct 2013603,23497.423.78$18,068
Sep 2013623,816104.113.72$20,642
Aug 201303,760104.253.52$13,245
Jul 2013655,805102.523.72$28,245
Jun 2013235,69294.403.93$24,560
May 2013326,08894.834.15$28,294
Apr 2013975,04993.964.28$30,737
Mar 20131016,06693.623.91$33,191
Feb 2013425,37991.233.42$22,227
Jan 2013965,62991.603.42$28,044
Dec 2012906,31086.773.42$29,391
Nov 2012246,29286.953.62$24,895
Oct 2012896,56889.383.40$30,284
Sep 201204194.672.92$120
Aug 2012615,70992.662.91$22,255
Jul 2012136,84785.133.02$21,790
Jun 2012776,53979.822.52$22,618
May 2012807,05091.612.49$24,871
Apr 2012147,470101.652.00$16,339
Mar 20121887,824105.052.22$37,135
Feb 2012267,978101.102.57$23,134
Jan 20121077,41198.092.73$30,758
Dec 20111016,99496.873.24$32,443
Nov 20111196,88695.723.31$34,192
Oct 20111177,35784.983.65$36,785
Sep 20111027,51183.623.99$38,467
Aug 2011136,75483.404.15$29,109
Jul 2011217,18194.144.52$34,415
Jun 2011197,35292.904.64$35,878
May 2011897,37498.134.40$41,215
Apr 201106,597105.964.33$28,587
Mar 20111136,67796.364.06$37,980
Feb 20111065,48485.644.18$32,001
Jan 2011267,29886.504.59$35,738
Dec 20101097,87885.734.35$43,596
Nov 20101157,78280.843.80$38,832
Oct 2010957,55478.103.51$33,926
Sep 2010157,21572.633.98$29,801
Aug 2010896,58173.684.42$35,641
Jul 2010996,66572.554.74$38,751
Jun 20101146,27970.364.91$38,853
May 20101247,04071.124.24$38,635
Apr 2010367,81781.694.12$35,168
Mar 20102108,64878.394.39$54,415
Feb 20101487,59973.585.44$52,246
Jan 20101338,89974.365.96$62,964
Dec 20091388,53871.445.48$56,679
Nov 20091188,56174.593.75$40,918
Oct 20091289,57972.544.11$48,657
Sep 20091489,39165.543.06$38,481
Aug 2009859,86667.423.22$37,484
Jul 20091518,64261.133.46$39,171
Jun 20091548,25166.163.90$42,326
May 20091759,30354.743.93$46,101
Apr 20091568,74846.773.59$38,680
Mar 20091518,94942.144.06$42,687
Feb 20091408,05932.814.63$41,931
Jan 20092087,90235.865.37$49,901
Dec 20081227,38937.105.98$48,691
Nov 20081189,03355.496.86$68,517
Oct 200821012,22075.246.92$100,387
Sep 200820514,881101.767.88$138,080
Aug 200821718,030114.228.48$177,735
Jul 200840919,897131.0811.39$280,227
Jun 20086921,264131.3313.03$286,188
May 200820823,911123.1711.57$302,372
Apr 200818725,767110.3110.45$290,018
Mar 200830823,521101.909.66$258,694
Feb 200825522,11692.538.77$217,565
Jan 200824727,95990.388.21$251,748
Dec 200725231,98488.337.30$255,805
Nov 200728532,99191.677.29$266,686
Oct 200732236,43982.856.92$278,908
Sep 200739040,59975.846.24$283,084
Aug 200753551,52169.066.39$366,060
Jul 200774048,36670.906.39$361,425

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                  467 Mcf  × $  2.87 =     $1,340

────────────────────────────────────────────────────
Month total                                   $1,340

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/230221 is the state's own key, not one this site invented.