Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 259715District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.0 M
Jan 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
221
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112013-03-01184416
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,158 bbl$236,816
GasProduction563,153 Mcf$2,770,562
Total$3,007,378

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6895, -100.3109. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.68946, -100.31091 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,795 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,795 ft.

Completions filed
Jan 2008
1 of 1 wells

1 well

42-211340615601P11,795 ftJan 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (221)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

221 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202350085.443.09$4,272
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 2023546068.962.26$37,652
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202201,405108.885.08$7,132
Feb 202201,07591.054.86$5,223
Jan 202201,52581.844.54$6,920
Dec 202101,28271.323.90$4,999
Nov 202101,33877.435.24$7,007
Oct 202101,51879.795.71$8,674
Sep 202101,51469.865.35$8,101
Aug 2021321,65066.024.22$9,077
Jul 202102,05470.783.98$8,179
Jun 202101,99169.493.38$6,731
May 202102,08263.483.02$6,283
Apr 202102,05660.362.76$5,671
Mar 202102,48861.302.72$6,760
Feb 202119286557.805.55$15,897
Jan 202102,02550.412.81$5,691
Dec 202002,03844.642.68$5,453
Nov 202001,99938.772.71$5,410
Oct 202002,00536.972.48$4,969
Sep 202081,98637.091.99$4,251
Aug 202002,09939.982.39$5,006
Jul 2020252,06138.371.83$4,721
Jun 202001,98734.901.69$3,359
May 202002,04016.921.81$3,702
Apr 202001,99414.751.80$3,598
Mar 2020172,09230.341.86$4,399
Feb 202092,18049.881.98$4,767
Jan 202001,92157.252.09$4,024
Dec 201902,04959.012.30$4,722
Nov 201902,07355.302.75$5,702
Oct 201902,21753.472.42$5,362
Sep 201902,15255.052.66$5,718
Aug 201922,15253.112.30$5,065
Jul 201942,08056.272.46$5,342
Jun 201932,08352.782.49$5,348
May 201972,18258.482.74$6,389
Apr 2019142,14262.632.75$6,769
Mar 201952,22856.803.06$7,106
Feb 2019131,98950.852.79$6,215
Jan 201902,20646.033.23$7,121
Dec 201802,25846.594.19$9,451
Nov 2018102,21052.934.24$9,894
Oct 2018102,36361.443.40$8,644
Sep 201802,30259.543.11$7,155
Aug 201802,37559.403.07$7,283
Jul 20181992,54165.142.93$20,413
Jun 201802,42760.183.08$7,468
May 201822,34765.382.90$6,939
Apr 201822,26963.842.90$6,710
Mar 201812,31361.222.79$6,507
Feb 201802,17761.782.77$6,022
Jan 201812,35362.874.01$9,497
Dec 20171902,45257.272.92$18,045
Nov 201732,30655.423.12$7,357
Oct 201702,74949.292.98$8,202
Sep 201722,35547.523.09$7,366
Aug 201752,44245.373.00$7,564
Jul 201712,87243.873.09$8,911
Jun 201702,80042.493.09$8,644
May 201772,63745.373.26$8,923
Apr 201702,38947.933.21$7,673
Mar 201712,47046.772.98$7,416
Feb 201712,22850.452.95$6,629
Jan 201702,45049.413.42$8,376
Dec 201602,48748.763.72$9,259
Nov 201602,02242.492.64$5,347
Oct 201602,08946.193.09$6,456
Sep 201602,05141.553.10$6,359
Aug 201602,15641.442.92$6,305
Jul 201602,12141.622.92$6,203
Jun 201602,04145.352.69$5,482
May 201602,11542.521.99$4,211
Apr 201602,03136.561.99$4,044
Mar 201602,13633.011.79$3,832
Feb 20161961,98026.472.06$9,274
Jan 201602,11127.352.36$4,991
Dec 201501,99832.362.00$3,999
Nov 201502,07638.792.17$4,499
Oct 201512,18243.552.43$5,338
Sep 201512,11242.992.76$5,869
Aug 201512,22340.162.87$6,426
Jul 201542,22848.152.95$6,754
Jun 201512,08056.152.88$6,053
May 201522,27855.212.96$6,843
Apr 201502,08249.822.71$5,635
Mar 201502,39442.892.93$7,026
Feb 201532,33544.662.98$7,083
Jan 201522,05543.433.10$6,459
Dec 201402,24054.693.59$8,045
Nov 201402,14270.464.25$9,107
Oct 201402,23578.303.90$8,719
Sep 201402,18186.164.05$8,823
Aug 201402,22389.394.04$8,970
Jul 201422,25496.564.18$9,614
Jun 201402,13298.164.74$10,099
May 201402,15294.734.73$10,172
Apr 201422,02295.944.81$9,916
Mar 201402,27395.895.06$11,494
Feb 201412,43197.406.19$15,150
Jan 201432,61790.404.86$12,992
Dec 201322,51791.824.35$11,144
Nov 201302,62288.853.74$9,802
Oct 201302,69897.423.78$10,197
Sep 201302,637104.113.72$9,804
Aug 201302,722104.253.52$9,589
Jul 201312,669102.523.72$10,025
Jun 201312,61094.403.93$10,361
May 201322,64694.834.15$11,168
Apr 201322,65893.964.28$11,571
Mar 20131842,82293.623.91$28,268
Feb 201302,34291.233.42$8,009
Jan 201302,93091.603.42$10,020
Dec 201203,10186.773.42$10,606
Nov 201203,00386.953.62$10,886
Oct 201213,13589.383.40$10,747
Sep 201222,80794.672.92$8,381
Aug 201213,17292.662.91$9,317
Jul 201253,02285.133.02$9,555
Jun 201232,92879.822.52$7,615
May 201232,94691.612.49$7,605
Apr 201203,016101.652.00$6,022
Mar 201203,022105.052.22$6,715
Feb 201202,787101.102.57$7,163
Jan 201203,14898.092.73$8,607
Dec 201103,16096.873.24$10,238
Nov 201102,99795.723.31$9,924
Oct 201103,27084.983.65$11,931
Sep 201103,35783.623.99$13,380
Aug 201102,84183.404.15$11,788
Jul 20111613,47194.144.52$30,836
Jun 201103,26492.904.64$15,145
May 201103,54498.134.40$15,611
Apr 201103,175105.964.33$13,758
Mar 201103,13396.364.06$12,712
Feb 201102,75285.644.18$11,503
Jan 201103,43286.504.59$15,749
Dec 201003,64085.734.35$15,826
Nov 201003,74880.843.80$14,225
Oct 201003,85978.103.51$13,541
Sep 201003,85372.633.98$15,333
Aug 201003,62573.684.42$16,020
Jul 201003,58672.554.74$16,985
Jun 20101634,01670.364.91$31,189
May 201004,28071.124.24$18,127
Apr 201004,17081.694.12$17,192
Mar 201004,29578.394.39$18,849
Feb 201003,95273.585.44$21,508
Jan 201004,22974.365.96$25,222
Dec 200903,92471.445.48$21,518
Nov 20091804,66674.593.75$30,931
Oct 200904,88872.544.11$20,091
Sep 200904,98265.543.06$15,269
Aug 200905,02967.423.22$16,186
Jul 200904,78661.133.46$16,581
Jun 200905,24266.163.90$20,418
May 200905,54754.743.93$21,776
Apr 200905,53246.773.59$19,846
Mar 200905,73242.144.06$23,266
Feb 200905,56932.814.63$25,801
Jan 20091776,00535.865.37$38,600
Dec 200806,04437.105.98$36,126
Nov 200806,70855.496.86$46,019
Oct 200807,31675.246.92$50,641
Sep 200807,225101.767.88$56,912
Aug 200808,322114.228.48$70,596
Jul 20081808,553131.0811.39$121,008
Jun 200809,044131.3313.03$117,867
May 200818710,654123.1711.57$146,345
Apr 2008012,160110.3110.45$127,131
Mar 200817716,194101.909.66$174,536
Feb 200814530,23892.538.77$278,622
Jan 2008013,99190.388.21$114,806

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            50 bbl  × $ 85.44 =     $4,272
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $4,272

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/259715 is the state's own key, not one this site invented.