BLASDEL 44

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the KIRSTEN (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 231472District 10Field 496892802 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.1 M
Sep 2007 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
225
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7 leases and 7 wells, and the rule below applies to all of them.

Discovered
1994-08-20
as the register files it
Field class
Gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 640 acres. The field rule took effect on 2005-09-01.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 04/01/2006.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-03-26180770
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10,902 bbl$779,634
GasProduction275,672 Mcf$1,318,825
Total$2,098,459

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.5154, -100.2401. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.51544, -100.24011 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
14,250 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 14,250 ft.

Completions filed
Sep 2007
1 of 1 wells

1 well

42-4833234214414,250 ftSep 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (225)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

225 months

May 20260171106.413.05$521
Apr 2026020098.932.87$574
Mar 2026015589.753.15$488
Feb 20260063.503.75$0
Jan 2026016859.138.00$1,344
Dec 2025023356.664.41$1,028
Nov 2025024258.593.93$950
Oct 2025025859.383.30$853
Sep 2025024162.743.08$742
Aug 2025023563.933.01$708
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 2024025980.301.55$400
Feb 2024028976.091.78$515
Jan 2024027573.023.30$907
Dec 2023029971.262.61$781
Nov 2023027377.892.81$766
Oct 2023026585.443.09$818
Sep 2023010789.042.74$293
Aug 2023027680.522.67$738
Jul 2023028074.852.64$740
Jun 2023028268.962.26$637
May 2023028670.622.23$637
Apr 2023026478.122.24$591
Mar 2023017172.852.39$409
Feb 20234729575.112.47$4,258
Jan 2023030376.533.39$1,026
Dec 2022030976.415.73$1,770
Nov 2022029685.005.65$1,671
Oct 2022028287.185.86$1,654
Sep 2022024384.888.16$1,984
Aug 2022025094.529.13$2,282
Jul 20220261101.587.54$1,968
Jun 20220298115.097.98$2,377
May 20220335109.378.43$2,825
Apr 20220327104.226.84$2,236
Mar 20220365108.885.08$1,853
Feb 2022037791.054.86$1,832
Jan 2022040281.844.54$1,824
Dec 2021041771.323.90$1,626
Nov 2021038677.435.24$2,021
Oct 2021037179.795.71$2,120
Sep 2021021069.865.35$1,124
Aug 2021050766.024.22$2,140
Jul 2021050670.783.98$2,015
Jun 2021051269.493.38$1,731
May 2021056063.483.02$1,690
Apr 2021058160.362.76$1,603
Mar 2021062161.302.72$1,687
Feb 2021047357.805.55$2,624
Jan 2021060450.412.81$1,697
Dec 2020058944.642.68$1,576
Nov 20205755038.772.71$3,699
Oct 2020057436.972.48$1,423
Sep 2020044837.091.99$892
Aug 2020045239.982.39$1,078
Jul 2020058738.371.83$1,071
Jun 2020062634.901.69$1,058
May 2020066516.921.81$1,207
Apr 2020069614.751.80$1,256
Mar 2020071830.341.86$1,333
Feb 2020068349.881.98$1,353
Jan 2020077257.252.09$1,617
Dec 2019077659.012.30$1,788
Nov 2019053155.302.75$1,461
Oct 2019075253.472.42$1,819
Sep 2019078055.052.66$2,073
Aug 2019084953.112.30$1,956
Jul 2019087356.272.46$2,148
Jun 2019022652.782.49$563
May 2019010658.482.74$290
Apr 2019041862.632.75$1,150
Mar 2019581856.803.06$2,789
Feb 2019948350.852.79$1,806
Jan 201919870446.033.23$11,387
Dec 2018560646.594.19$2,769
Nov 2018759852.934.24$2,904
Oct 2018876361.443.40$3,084
Sep 201819982759.543.11$14,419
Aug 2018586559.403.07$2,950
Jul 2018091865.142.93$2,691
Jun 201891,18160.183.08$4,175
May 2018493665.382.90$2,977
Apr 201801,29463.842.90$3,754
Mar 201820448861.222.79$13,849
Feb 2018070961.782.77$1,961
Jan 201861,12462.874.01$4,884
Dec 201761,25757.272.92$4,016
Nov 20172011,44355.423.12$15,639
Oct 201752,15649.292.98$6,679
Sep 201731,52047.523.09$4,835
Aug 201701,95645.373.00$5,877
Jul 201702,58643.873.09$7,984
Jun 20171972,96742.493.09$17,530
May 201702,95045.373.26$9,627
Apr 201703,50647.933.21$11,260
Mar 201704,24046.772.98$12,651
Feb 20172002,47750.452.95$17,404
Jan 201702,25449.413.42$7,706
Dec 201605,59648.763.72$20,833
Nov 201605,93142.492.64$15,684
Oct 20161903,56846.193.09$19,802
Sep 201601,78941.553.10$5,547
Aug 201601,80641.442.92$5,281
Jul 20161841,93041.622.92$13,302
Jun 201602,00545.352.69$5,385
May 20161731,82042.521.99$10,980
Apr 201601,90736.561.99$3,797
Mar 201601,86133.011.79$3,339
Feb 20161851,72426.472.06$8,455
Jan 201602,30727.352.36$5,455
Dec 20151832,41032.362.00$10,745
Nov 201502,41838.792.17$5,241
Oct 20151962,52343.552.43$14,658
Sep 201502,48942.992.76$6,866
Aug 20151842,44840.162.87$14,421
Jul 201502,52348.152.95$7,430
Jun 20151769756.152.88$10,162
May 201502,21555.212.96$6,546
Apr 201519455349.822.71$11,162
Mar 201518716542.892.93$8,505
Feb 201519915544.662.98$9,349
Jan 20151895,73343.433.10$25,984
Dec 20143945,02854.693.59$39,605
Nov 2014071870.464.25$3,053
Oct 201401,79578.303.90$7,002
Sep 2014098186.164.05$3,969
Aug 2014038889.394.04$1,566
Jul 2014057696.564.18$2,407
Jun 2014060998.164.74$2,885
May 201418441894.734.73$19,406
Apr 201401,05495.944.81$5,069
Mar 2014040495.895.06$2,043
Feb 2014026397.406.19$1,629
Jan 2014017790.404.86$860
Dec 201302,32891.824.35$10,137
Nov 20130088.853.74$0
Oct 201302,02197.423.78$7,638
Sep 20130556104.113.72$2,067
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 2013021094.403.93$826
May 2013026994.834.15$1,116
Apr 201318331393.964.28$18,535
Mar 2013035593.623.91$1,389
Feb 2013036291.233.42$1,238
Jan 2013041991.603.42$1,433
Dec 2012056286.773.42$1,922
Nov 201218751486.953.62$18,123
Oct 2012047389.383.40$1,608
Sep 201203494.672.92$99
Aug 2012018692.662.91$541
Jul 2012014885.133.02$447
Jun 201218511379.822.52$15,051
May 201206191.612.49$152
Apr 20120117101.652.00$234
Mar 20120122105.052.22$271
Feb 20120243101.102.57$625
Jan 201217438698.092.73$18,123
Dec 2011555896.873.24$2,292
Nov 2011669195.723.31$2,862
Oct 2011648484.983.65$2,276
Sep 2011445483.623.99$2,144
Aug 201122043383.404.15$20,145
Jul 20112444794.144.52$4,279
Jun 2011246592.904.64$2,343
May 201119551398.134.40$21,395
Apr 201112524105.964.33$3,542
Mar 2011121,37496.364.06$6,731
Feb 201132,23685.644.18$9,603
Jan 2011112,26286.504.59$11,331
Dec 20101912,14885.734.35$25,713
Nov 201061,69580.843.80$6,918
Oct 201006778.103.51$235
Sep 201019361972.633.98$16,481
Aug 2010564773.684.42$3,228
Jul 2010664172.554.74$3,471
Jun 201018658070.364.91$15,935
May 2010760471.124.24$3,056
Apr 20101165081.694.12$3,578
Mar 2010897778.394.39$4,915
Feb 20101991,02373.585.44$20,210
Jan 201001,44974.365.96$8,642
Dec 200921,58171.445.48$8,813
Nov 200918990774.593.75$17,500
Oct 2009466872.544.11$3,036
Sep 2009189265.543.06$2,799
Aug 200918481367.423.22$15,022
Jul 2009196861.133.46$3,415
Jun 200991,19766.163.90$5,258
May 20091761,04754.743.93$13,745
Apr 200951,19446.773.59$4,517
Mar 2009121,25442.144.06$5,596
Feb 20092101,20232.814.63$12,459
Jan 200981,53335.865.37$8,521
Dec 20081851,59237.105.98$16,379
Nov 2008101,62355.496.86$11,689
Oct 20081991,74275.246.92$27,031
Sep 2008181,657101.767.88$14,884
Aug 20082001,922114.228.48$39,148
Jul 20081932,126131.0811.39$49,512
Jun 20082002,314131.3313.03$56,424
May 20081962,679123.1711.57$55,149
Apr 20081932,794110.3110.45$50,501
Mar 20082033,433101.909.66$53,862
Feb 200803,90292.538.77$34,223
Jan 20082145,12990.388.21$61,429
Dec 20072356,48288.337.30$68,089
Nov 20074669,86391.677.29$114,636
Oct 200769820,97682.856.92$203,025
Sep 200765724,84875.846.24$204,982

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  171 Mcf  × $  3.05 =       $521

────────────────────────────────────────────────────
Month total                                     $521

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/231472 is the state's own key, not one this site invented.