GRAHAM

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 231498District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.3 M
Aug 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-01-22178926
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,244 bbl$250,817
GasProduction619,037 Mcf$3,088,359
Total$3,339,176

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7035, -100.4088. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.70346, -100.40884 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,830 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,830 ft.

Completions filed
Aug 2007
1 of 1 wells

1 well

42-211339084603P12,830 ftAug 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 2020049057.252.09$1,026
Dec 2019049059.012.30$1,129
Nov 2019047555.302.75$1,307
Oct 2019049053.472.42$1,185
Sep 2019047555.052.66$1,262
Aug 201914749053.112.30$8,936
Jul 2019049056.272.46$1,205
Jun 2019047552.782.49$1,183
May 2019049058.482.74$1,343
Apr 2019047562.632.75$1,307
Mar 2019057956.803.06$1,773
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20183059.543.11$179
Aug 2018025959.403.07$794
Jul 201852,44265.142.93$7,485
Jun 201802,37260.183.08$7,298
May 201872,41265.382.90$7,454
Apr 201832,40763.842.90$7,174
Mar 201862,49261.222.79$7,312
Feb 2018102,26161.782.77$6,872
Jan 201822,49662.874.01$10,133
Dec 201792,68557.272.92$8,360
Nov 201742,44155.423.12$7,834
Oct 20171952,51049.292.98$17,101
Sep 201712,07747.523.09$6,460
Aug 201732,63645.373.00$8,056
Jul 201723,19643.873.09$9,955
Jun 201703,10942.493.09$9,598
May 201743,46745.373.26$11,496
Apr 201703,24747.933.21$10,428
Mar 201763,40946.772.98$10,452
Feb 201732,78950.452.95$8,386
Jan 201732,93549.413.42$10,182
Dec 201602,66348.763.72$9,914
Nov 201602,13442.492.64$5,643
Oct 201602,17246.193.09$6,712
Sep 201602,17341.553.10$6,738
Aug 201602,17641.442.92$6,363
Jul 201602,35241.622.92$6,878
Jun 20161922,60245.352.69$15,696
May 201602,77042.521.99$5,515
Apr 201602,68336.561.99$5,342
Mar 201602,86633.011.79$5,142
Feb 201602,70626.472.06$5,584
Jan 201603,02827.352.36$7,159
Dec 201502,51932.362.00$5,042
Nov 201502,78738.792.17$6,040
Oct 201502,88143.552.43$6,991
Sep 201502,76842.992.76$7,635
Aug 201502,78940.162.87$8,011
Jul 201503,02948.152.95$8,921
Jun 201502,91256.152.88$8,395
May 201503,37655.212.96$9,978
Apr 20151933,01249.822.71$17,767
Mar 201503,50242.892.93$10,277
Feb 201503,23944.662.98$9,640
Jan 201503,04043.433.10$9,426
Dec 201403,31254.693.59$11,895
Nov 201403,25970.464.25$13,857
Oct 201403,25978.303.90$12,713
Sep 201403,34786.164.05$13,540
Aug 201403,45289.394.04$13,929
Jul 201403,78496.564.18$15,816
Jun 201403,67398.164.74$17,399
May 201403,82994.734.73$18,098
Apr 20141954,02295.944.81$38,051
Mar 201404,11095.895.06$20,783
Feb 201403,86497.406.19$23,926
Jan 201404,35590.404.86$21,168
Dec 201304,06391.824.35$17,692
Nov 20132004,13688.853.74$33,232
Oct 201304,49497.423.78$16,984
Sep 201304,590104.113.72$17,064
Aug 201344,732104.253.52$17,086
Jul 201364,783102.523.72$18,397
Jun 201304,66594.403.93$18,349
May 2013125,06694.834.15$22,157
Apr 201384,35693.964.28$19,407
Mar 201353,72093.623.91$15,024
Feb 201333,61891.233.42$12,647
Jan 2013133,79391.603.42$14,163
Dec 201203,93986.773.42$13,472
Nov 201203,40586.953.62$12,343
Oct 201208,89489.383.40$30,237
Sep 201203,07594.672.92$8,974
Aug 201203,15592.662.91$9,175
Jul 20121833,14185.133.02$25,067
Jun 201203,06279.822.52$7,713
May 201203,14591.612.49$7,826
Apr 201202,923101.652.00$5,837
Mar 201202,146105.052.22$4,769
Feb 201202,865101.102.57$7,364
Jan 201207,81098.092.73$21,353
Dec 201103,55596.873.24$11,517
Nov 201103,87395.723.31$12,825
Oct 201102,89084.983.65$10,544
Sep 201103,44583.623.99$13,731
Aug 201103,93983.404.15$16,344
Jul 2011623,65294.144.52$22,334
Jun 2011073092.904.64$3,387
May 201103,89298.134.40$17,144
Apr 20111693,869105.964.33$34,673
Mar 201103,86496.364.06$15,678
Feb 201103,31385.644.18$13,848
Jan 201103,78386.504.59$17,359
Dec 201003,83885.734.35$16,687
Nov 201003,83880.843.80$14,566
Oct 201004,18678.103.51$14,688
Sep 201004,05572.633.98$16,137
Aug 20101853,91073.684.42$30,911
Jul 201004,28572.554.74$20,296
Jun 201004,19370.364.91$20,589
May 201004,28871.124.24$18,161
Apr 201004,36481.694.12$17,991
Mar 201004,62378.394.39$20,289
Feb 201004,11173.585.44$22,374
Jan 201004,62074.365.96$27,554
Dec 20091834,75471.445.48$39,143
Nov 200904,25074.593.75$15,944
Oct 200904,68372.544.11$19,248
Sep 200905,03165.543.06$15,419
Aug 200905,04267.423.22$16,228
Jul 200905,08961.133.46$17,631
Jun 200905,20266.163.90$20,262
May 20091875,49354.743.93$31,801
Apr 200905,55646.773.59$19,932
Mar 200905,67042.144.06$23,015
Feb 200905,05132.814.63$23,401
Jan 200905,56435.865.37$29,884
Dec 200805,74837.105.98$34,357
Nov 200805,42755.496.86$37,231
Oct 20081735,39675.246.92$50,368
Sep 200806,013101.767.88$47,365
Aug 200806,691114.228.48$56,760
Jul 200807,145131.0811.39$81,377
Jun 20081926,987131.3313.03$116,274
May 200807,208123.1711.57$83,427
Apr 200807,998110.3110.45$83,618
Mar 200809,416101.909.66$90,997
Feb 20081389,57892.538.77$96,774
Jan 2008011,34890.388.21$93,119
Dec 200718312,57188.337.30$107,957
Nov 2007014,50591.677.29$105,766
Oct 200717818,20582.856.92$140,762
Sep 2007025,25875.846.24$157,715
Aug 200716739,96069.066.39$266,795

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2020 — as filed, then multipliedworked
Condensate             0 bbl  × $ 57.25 =         $0
Gas                  490 Mcf  × $  2.09 =     $1,026

────────────────────────────────────────────────────
Month total                                   $1,026

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/231498 is the state's own key, not one this site invented.